ACTIVITY TITLE
Congo - Projet d’électrification rurale
Congo - Rural Electrification Project
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard loan 421 ODA 10 Untied 1
DOCUMENTS ( 34 )
Appraisal Report APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Appraisal Report APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Environmental Study APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Environmental Study APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Environmental Study APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/PDF FR Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL FR Summary information about contract Contract Memorandum of Understanding APPLICATION/PDF FR Memorandum of understanding (If agreed by all parties) Expression of Interest APPLICATION/PDF EN Tender Expression of Interest APPLICATION/PDF FR Tender General Procurement Notice APPLICATION/PDF FR Tender Activity TEXT/HTML FR Activity web page Activity TEXT/HTML FR Activity web page
Planned start date 2012-12-06
Planned end date 2024-06-30
Actual start date 2013-04-05
Actual end date 2024-06-30
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 3 )
PARTICIPATING ORG REFERENCE ROLE TYPE
African Development Fund
Funding Multilateral
Government Of Congo
Extending Government
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
Implementing Government
Objectives
Le projet a pour objectif sectoriel d’accroître l’accès durable à l’électricité des populations en vue d’améliorer leurs conditions de vie. Plus spécifiquement, il vise à électrifier 59 localités dont deux communautés rurales et deux chefs-lieux de districts dans les départements de Pointe-Noire, de Bouenza, des Plateaux et de la Cuvette et Cuvette-Ouest.
The project's sector goal is to increase the population’s sustainable access to electricity in order to improve its living conditions. More specifically, it aims to electrify 59 localities, including two rural communities and two District headquarters in the Pointe-Noire, Bouenza, Plateaux, and Cuvette and Cuvette-Ouest Departments.
General
Le projet d’électrification rurale fait partie d’un programme national d’électrification à partir du réseau électrique interconnecté, de 53 centres ruraux dans dix des douze départements du Congo. Le programme a pour objectif de contribuer à l’amélioration des conditions de vie des populations rurales par un accès durable à l’électricité et renforcer la municipalisation accélérée engagée par le Gouvernement en 2004 visant à doter tous les chefs-lieux de districts en infrastructures sociaux de base. Le projet devrait permettre de raccorder au réseau électrique et de fournir de l’énergie électrique à base d’hydroélectricité et de gaz à : (i) 5 100 ménages soit 25 500 habitants ; (ii) 17 centres de santé ; (iii) 40 établissements scolaires ; (iv) 24 forages d’eau ; (iv) 38 centres administratifs et sociétés ; et (v) une zone commerciale. Son coût total hors taxes est évalué à 15,67 millions d’UC. Les principales réalisations attendues au terme des 48 mois de l’exécution du projet sont : (i) la construction de 305 km de réseaux de distribution en moyenne et basse tensions ; (ii) la réalisation de 71 postes de transformation MT/BT ; (iii) l’électrification de 59 nouvelles localités dont deux communautés rurales et deux chefs-lieux de districts ; (iv) la réalisation de 5 100 branchements ; (v) l’installation de 2 255 foyers d’éclairage public ; et (vi) le renforcement des capacités des structures publiques du sous-secteur de l’électricité. Le coût total du projet hors taxes et droits de douane est estimé à 15,67 millions d’UC dont 11,46 millions d’UC en devises (73,11%) et 4,21 millions d’UC en monnaie locale (26,89%). Il s’articule autour de deux (2) composantes principales, à savoir : A) les infrastructures électriques; et B) l'appui à la gestion du projet.
The Rural Electrification Project is part of a national programme for the electrification, from the interconnected electricity grid, of 53 rural centres in 10 of the 12 Departments of Congo. The programme aims to contribute to improving the living conditions of rural communities through sustainable access to electricity and to boost the accelerated municipalisation programme initiated by the Government in 2004 aimed at providing all District headquarters with basic social infrastructure. The project should make it possible to provide grid connection and electrical energy from hydroelectric and gas-fired plants to: (i) 5,100 households or 25,500 inhabitants; (ii) 17 health centres; (iii) 40 educational establishments; (iv) 24 boreholes; (iv) 38 administrative centres and companies; and (v) a commercial area. The total cost, net of taxes, is estimated at UA 15.67 million. The main expected outputs at the end of 48 months of project implementation are: (i) construction of 305 km of medium and low voltage distribution grids; (ii) building of 71 MV/LV transformer stations; (iii) electrification of 59 new localities, including two rural communities and two District headquarters; (iv) installation of 5,100 connections; (v) installation of 2,255 street lighting units; and (vi) capacity building for public entities of the electricity sub-sector. The total project cost, net of taxes and customs duties, is estimated at UA 15.67 million, comprising UA 11.46 million in foreign exchange (73.11%) and UA 4.21 million in local currency (26.89%). It is focused on two main components, namely: A) Electrical Infrastructure; and B) Project Management Support.
Target Groups
Les principaux bénéficiaires du projet sont les populations, les commerces, les services administratifs et municipaux, les centres de santé, les écoles, les stations d’eau potable, les petites entreprises et la SNE. Au total 5 100 ménages soit 25 500 personnes devraient avoir accès au réseau électrique par le projet.
The main beneficiaries of the project are the populations, businesses, government and municipal services, health centres, schools, drinking water treatment plants, small business and the National Electricity Corporation (SNE). Overall, 5,100 households or 25,500 people should have access to the grid thanks to the project.
recipient country ( 1 )
Congo (the)CG
100
LOCATION ( 10 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Tchimpassi
ID 2255143 (Geonames)
TYPE first-order administrative division ADM1
-4.53278 11.9736 Administrative Region Approximate
Plateaux
ID 2255422 (Geonames)
TYPE first-order administrative division ADM1
-2 15.5 Administrative Region Approximate
Okoyo
ID 2255775 (Geonames)
TYPE first-order administrative division ADM1
-1.46008 15.0762 Administrative Region Approximate
Mbon
ID 2257355 (Geonames)
TYPE first-order administrative division ADM1
-2.07972 15.0878 Administrative Region Approximate
Mabombo
ID 2258016 (Geonames)
TYPE first-order administrative division ADM1
-3.97611 13.5769 Administrative Region Approximate
Cuvette
ID 2260487 (Geonames)
TYPE first-order administrative division ADM1
-0.5 16 Administrative Region Approximate
Région de la Bouenza
ID 2260668 (Geonames)
TYPE first-order administrative division ADM1
-4.1629 13.7109 Administrative Region Approximate
Cuvette-Ouest
ID 2593118 (Geonames)
TYPE first-order administrative division ADM1
0 14.5 Administrative Region Approximate
Liouesso
ID 2258406 (Geonames)
TYPE populated place PPL
1.05278 15.6917 Populated Place Approximate
Pointe-Noire
ID 2255414 (Geonames)
TYPE populated place PPL
-4.77609 11.8635 Populated Place Approximate
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
3.6.1
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Energy sector policy, planning and administration23111
100
GLOSSARY
Energy sector policy, planning and administrationNo description provided
Financial Overview
Outgoing Commitment ( 2 )
Disbursement ( 36 )
Interest Payment ( 33 )
Loan Repayment ( 8 )
Budget ( 44 )
Outgoing Commitment
Disbursement
Interest Payment
Loan Repayment
Budget
Budget ( 44 )
START END TYPE STATUS VALUE
2013-04-05 2013-07-05 Original 227,272.727273
XDR
2013-07-05 2013-10-05 Original 227,272.727273
XDR
2013-10-05 2014-01-05 Original 227,272.727273
XDR
2014-01-05 2014-04-05 Original 227,272.727273
XDR
2014-04-05 2014-07-05 Original 227,272.727273
XDR
2014-07-05 2014-10-05 Original 227,272.727273
XDR
2014-10-05 2015-01-05 Original 227,272.727273
XDR
2015-01-05 2015-04-05 Original 227,272.727273
XDR
2015-04-05 2015-07-05 Original 227,272.727273
XDR
2015-07-05 2015-10-05 Original 227,272.727273
XDR
2015-10-05 2016-01-05 Original 227,272.727273
XDR
2016-01-05 2016-04-05 Original 227,272.727273
XDR
2016-04-05 2016-07-05 Original 227,272.727273
XDR
2016-07-05 2016-10-05 Original 227,272.727273
XDR
2016-10-05 2017-01-05 Original 227,272.727273
XDR
2017-01-05 2017-04-05 Original 227,272.727273
XDR
2017-04-05 2017-07-05 Original 227,272.727273
XDR
2017-07-05 2017-10-05 Original 227,272.727273
XDR
2017-10-05 2018-01-05 Original 227,272.727273
XDR
2018-01-05 2018-04-05 Original 227,272.727273
XDR
2018-04-05 2018-07-05 Original 227,272.727273
XDR
2018-07-05 2018-10-05 Original 227,272.727273
XDR
2018-10-05 2019-01-05 Original 227,272.727273
XDR
2019-01-05 2019-04-05 Original 227,272.727273
XDR
2019-04-05 2019-07-05 Original 227,272.727273
XDR
2019-07-05 2019-10-05 Original 227,272.727273
XDR
2019-10-05 2020-01-05 Original 227,272.727273
XDR
2020-01-05 2020-04-05 Original 227,272.727273
XDR
2020-04-05 2020-07-05 Original 227,272.727273
XDR
2020-07-05 2020-10-05 Original 227,272.727273
XDR
2020-10-05 2021-01-05 Original 227,272.727273
XDR
2021-01-05 2021-04-05 Original 227,272.727273
XDR
2021-04-05 2021-07-05 Original 227,272.727273
XDR
2021-07-05 2021-10-05 Original 227,272.727273
XDR
2021-10-05 2022-01-05 Original 227,272.727273
XDR
2022-01-05 2022-04-05 Original 227,272.727273
XDR
2022-04-05 2022-07-05 Original 227,272.727273
XDR
2022-07-05 2022-10-05 Original 227,272.727273
XDR
2022-10-05 2023-01-05 Original 227,272.727273
XDR
2023-01-05 2023-04-05 Original 227,272.727273
XDR
2023-04-05 2023-07-05 Original 227,272.727273
XDR
2023-07-05 2023-10-05 Original 227,272.727273
XDR
2023-10-05 2024-01-05 Original 227,272.727273
XDR
2024-01-05 2024-06-30 Original 227,272.727273
XDR
Budget
Transactions ( 79 )
Outgoing Commitment ( 2 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2013-04-05
REF 2100150028193
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Gouvernement de la République du Congo Ministère de l'Économie et des Finances
10,000,000
XDR
2013-04-05
REF 1
FLOW ODA 10
STATUS Untied 5
Government Of Congo
5,670,000
XDR
Outgoing Commitment
Disbursement ( 36 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2015-09-30
Total Disbursement in Third Quarter of 2015
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
132,560.07
XDR
2015-12-31
Total Disbursement in Fourth Quarter of 2015
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
70,402.16
XDR
2016-06-30
Total Disbursement in Second Quarter of 2016
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
40,324.58
XDR
2016-09-30
Total Disbursement in Third Quarter of 2016
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
33,294.16
XDR
2016-12-31
Total Disbursement in Fourth Quarter of 2016
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
32,611.32
XDR
2017-03-31
Total Disbursement in First Quarter of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
18,706.66
XDR
2017-06-30
Total Disbursement in Second Quarter of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
1,791,960.67
XDR
2017-07-31
Total Disbursement in July of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
15,484.03
XDR
2017-11-30
Total Disbursement in November of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
35,908.99
XDR
2017-12-31
Total Disbursement in December of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
27,297.44
XDR
2018-07-31
Total Disbursement in July of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
6,362.12
XDR
2018-10-31
Total Disbursement in October of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
11,330.66
XDR
2018-12-31
Total Disbursement in December of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
15,483.29
XDR
2019-02-28
Total Disbursement in February of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
16,900.04
XDR
2019-06-30
Total Disbursement in June of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
3,084.97
XDR
2019-09-30
Total Disbursement in September of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
78,107.54
XDR
2021-08-31
Total Disbursement in August of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
521,121.92
XDR
2021-09-15
Total Disbursement in September of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
13,478.32
XDR
2021-10-15
Total Disbursement in October of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
53,442.34
XDR
2021-10-31
Total Disbursement in October of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,431.48
XDR
2021-12-31
Total Disbursement in December of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
40,641.83
XDR
2022-02-15
Total Disbursement in February of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
2,903.61
XDR
2022-06-30
Total Disbursement in June of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
7,015.55
XDR
2022-08-31
Total Disbursement in August of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
1,143.25
XDR
2022-09-30
Total Disbursement in September of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,025.96
XDR
2022-12-31
Total Disbursement in December of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
9,769.18
XDR
2023-02-15
Total Disbursement in February of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
5,767.71
XDR
2023-04-15
Total Disbursement in April of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,101.33
XDR
2023-06-30
Total Disbursement in June of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,378.91
XDR
2023-07-15
Total Disbursement in July of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
9,550.29
XDR
2023-09-30
Total Disbursement in September of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,200.95
XDR
2023-12-31
Total Disbursement in December of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
4,347.89
XDR
2024-01-15
Total Disbursement in January of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
28,745.11
XDR
2024-06-30
Total Disbursement in June of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
5,204.27
XDR
2024-07-15
Total Disbursement in July of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
20,067.66
XDR
2024-10-31
Total Disbursement in October of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère de l'Energie et de l'Hydraulique
REF CG-COA-41
2,600.69
XDR
Disbursement
Interest Payment ( 33 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2014-06-30
Total Interest Repayment in Second Quarter of 2014
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
24,931.51
XDR
2014-12-31
Total Interest Repayment in Fourth Quarter of 2014
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
24,794.52
XDR
2015-06-30
Total Interest Repayment in Second Quarter of 2015
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
25,205.48
XDR
2015-12-31
Total Interest Repayment in Fourth Quarter of 2015
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
24,796.99
XDR
2016-06-30
Total Interest Repayment in Second Quarter of 2016
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
26,199.11
XDR
2016-12-31
Total Interest Repayment in Fourth Quarter of 2016
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
26,356.82
XDR
2017-06-30
Total Interest Repayment in Second Quarter of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
27,026.3
XDR
2017-10-31
Total Interest Repayment in October of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
2,399.11
XDR
2017-11-30
Total Interest Repayment in November of 2017
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
30,920.03
XDR
2018-04-30
Total Interest Repayment in April of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
20,109.45
XDR
2018-05-31
Total Interest Repayment in May of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
19,768.64
XDR
2018-10-31
Total Interest Repayment in October of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
6,415.79
XDR
2018-11-30
Total Interest Repayment in November of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
5,039.29
XDR
2018-12-31
Total Interest Repayment in December of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
27,933.94
XDR
2019-04-30
Total Interest Repayment in April of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
8,153.89
XDR
2019-05-31
Total Interest Repayment in May of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
31,556.27
XDR
2019-10-31
Total Interest Repayment in October of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
19,988.63
XDR
2019-11-30
Total Interest Repayment in November of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
19,220.44
XDR
2020-04-30
Total Interest Repayment in April of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
36,764.61
XDR
2020-05-15
Total Interest Repayment in May of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
3,173.55
XDR
2020-10-15
Total Interest Repayment in October of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
6,600.51
XDR
2020-10-31
Total Interest Repayment in October of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
33,917.28
XDR
2021-05-31
Total Interest Repayment in May of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
41,124.8
XDR
2021-10-31
Total Interest Repayment in October of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
40,197.27
XDR
2022-04-30
Total Interest Repayment in April of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
GOUVERNEMENT DE LA REPUBLIQUE DU CONGO MINISTERE DU PLAN ET DES FINANCES ETAT-BAD-PARE
40,554.69
XDR
2022-11-15
Total Interest Repayment in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGO MINISTERE DU PLAN ET DES FINANCES ETAT-BAD-PARE
38,903.08
XDR
2023-04-30
Total Interest Repayment in April of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
20,913.18
XDR
2023-05-15
Total Interest Repayment in May of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
19,015.96
XDR
2023-11-15
Total Interest Repayment in November of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
39,708.87
XDR
2024-06-15
Total Interest Repayment in June of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
39,936.7
XDR
2024-11-30
Total Interest Repayment in November of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE du Congo
39,539.79
XDR
2025-05-15
Total Interest Repayment in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE du Congo
6,502.6
XDR
2025-06-30
Total Interest Repayment in June of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE du Congo
32,597.26
XDR
Interest Payment
Loan Repayment ( 8 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2021-10-31
Total Loan Repayment in October of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
36,608.47
XDR
2022-04-30
Total Loan Repayment in April of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
GOUVERNEMENT DE LA REPUBLIQUE DU CONGO MINISTERE DU PLAN ET DES FINANCES ETAT-BAD-PARE
36,020.59
XDR
2022-11-15
Total Loan Repayment in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGO MINISTERE DU PLAN ET DES FINANCES ETAT-BAD-PARE
35,980.85
XDR
2023-04-30
Total Loan Repayment in April of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
37,464.15
XDR
2023-11-15
Total Loan Repayment in November of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
38,855.74
XDR
2024-06-15
Total Loan Repayment in June of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE DU CONGOMINISTERE DU PLAN ET DES FINANCESETAT-BAD-PARE
39,113.63
XDR
2024-11-30
Total Loan Repayment in November of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE du Congo
39,898.86
XDR
2025-06-30
Total Loan Repayment in June of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMENT DE LA REPUBLIQUE du Congo
38,696.51
XDR
Loan Repayment
result( 14 )
output( 14 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
Output
indicator( 1 )
Length of LV grids built
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
6505.0 6400.0
98%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Length of the 33 kV grids built
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
400.0 200.0
50%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of boreholes electrified
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
24.0 0.0
0%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of connections
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
180100.0 175000.0
97%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of health centres electrified
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
17.0 0.0
0%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of households connected
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
325100.0 320000.0
98%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of localities electrified
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
94.0 35.0
37%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of MV/LV stations built
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1067.0 996.0
93%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of people connected to the electric grid in rural areas
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
40100.0 35000.0
87%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of people with access to electricity
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1310000.0 1275000.0
97%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of people with access to electricity in rural areas
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
190000.0 140000.0
73%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of rural centres electrified
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
24.0 20.0
83%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of schools electrified
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
40.0 0.0
0%
2012-01-01 : 2023-12-31
Output
indicator( 1 )
Number of street lighting units installed
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
2255.0 0.0
0%
2012-01-01 : 2023-12-31
African Development Bank
RDGC
Papa Daouda TINE
Power Engineer, PESD2
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Policy The condition attached requires a particular policy to be implemented by the recipient
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient