{"rows":[{"aid":"XM-DAC-46004-31196-013-GRNT0073","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Southern Agriculture Area Development Project","slug":"asdb-kg","status_code":3,"day_start":13664,"day_end":14551,"day_length":887,"description":"The Project's expected impact is: a sustainable increase in farm incomes.  The expected outcome of the Project is a sustainable increase in land productivity and profitability.","commitment":5000000,"spend":48938.62,"commitment_eur":3699614.8,"spend_eur":35716.562,"commitment_gbp":2520701.5,"spend_gbp":29865.7,"commitment_cad":5475724.5,"spend_cad":52068.64,"flags":0},
{"aid":"XM-DAC-46004-31196-013-LN2314","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Southern Agriculture Area Development Project","slug":"asdb-kg","status_code":3,"day_start":13664,"day_end":14551,"day_length":887,"description":"The Project's expected impact is: a sustainable increase in farm incomes.  The expected outcome of the Project is a sustainable increase in land productivity and profitability.","commitment":15000000,"spend":32772.39,"commitment_eur":11098845,"spend_eur":23918.066,"commitment_gbp":7562104.5,"spend_gbp":19999.957,"commitment_cad":16427174,"spend_cad":34868.45,"flags":0},
{"aid":"XM-DAC-46004-31197-032-GRNT0122","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Community-Based Infrastructure Services Sector Project (Supplementary Grant)","slug":"asdb-kg","status_code":3,"day_start":14207,"day_end":15992,"day_length":1785,"description":"The Community Based Infrastructure Services Sector Project  (the initial Project) follows a sector lending approach and supports the main objective of the Government of Kyrgyz Republic (Government) of human development by providing: (i) improved community-based infrastructure services; and (ii) training programs to develop institutional capacity. The Project area covers four oblasts (provinces) - Chui, Jalal-Abad, Osh, and Batken. The Project was designed to provide basic infrastructure services in 730 villages and seven small towns to about 1.5 million persons, of whom approximately 70% were living below the poverty line.\n\nThe proposed supplementary grant is required to meet the financing gap that has emerged due to significant increases in construction costs during the implementation period. As a result, the water supply systems in 118 subprojects were prioritized out of the originally planned 240 subproject. The proposed supplementary grant will implement the remaining 122 subprojects by providing much-needed water supply and sanitation services for the rural population as prioritized by the Government. Based on the lessons learned from the initial Project, proposed changes include: (i) simplification of the subproject selection criteria to ensure the selection of community-owned demand-driven and cost effective subprojects; (ii) improvement of technical design criteria for implementing simple, technically sound and cost effective subprojects; and (iii) improvement of implementation arrangements to achieve efficiency and quality during project implementation.","commitment":8629187,"spend":8159574.5,"commitment_eur":6778202.5,"spend_eur":5955050.5,"commitment_gbp":5623261.5,"spend_gbp":4979531,"commitment_cad":10520180,"spend_cad":8681445,"flags":0},
{"aid":"XM-DAC-46004-34172-013-LN2224","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Banking Sector and Capital Market Development Program","slug":"asdb-kg","status_code":3,"day_start":13291,"day_end":14573,"day_length":1282,"description":"The objective of the Program is to promote sound and more balanced development of the financial sector to enable it to effectively mobilize savings and provide alternative sources of funding for productive investment and employment generation. In particular, the Program will (i) facilitate the enforcement of banking legislation and regulation, close banking sector regulatory gaps, and promote competition; (ii) strengthen supervision of securities markets to improve market transparency, and protect investors; and (iii) remove policy distortions that undermine the development of capital markets. To achieve these objectives, the Program will seek to (i) increase the transparency and consistency of enforcement policies and procedures in the area of banking, (ii) strengthen risk management regulation and cross-border supervision, (iii) facilitate coordination and cooperation between supervisory bodies, (iv) consolidate the institutional framework for regulation and supervision of NBFIs, (v) strengthen the legal and regulatory basis for securities markets, (vi) strengthen the governance of market intermediaries, (vii) rationalize the tax treatment of government and corporate securities, and (viii) strengthen privatization policies.","commitment":15500000,"spend":16729811,"commitment_eur":12145510,"spend_eur":12209812,"commitment_gbp":8299116,"spend_gbp":10209676,"commitment_cad":17206840,"spend_cad":17799818,"flags":0},
{"aid":"XM-DAC-46004-38298-022-GRNT0074","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Vocational Education and Skills Development","slug":"asdb-kg","status_code":3,"day_start":13777,"day_end":15825,"day_length":2048,"description":"The Project assists the government in reforming the primary vocational education (PVE) system and increasing skill training opportunities for adults and out of school youth. the Project has four components: (i) consolidation of PVE system; (ii) improving teaching and learning environments; (iii) modernization of curriculum and assessment and development of learning materials, and (iv) human resource development.","commitment":10000000,"spend":9578059,"commitment_eur":7190547.5,"spend_eur":6990294,"commitment_gbp":4957259,"spend_gbp":5845187.5,"commitment_cad":10253571,"spend_cad":10190653,"flags":0},
{"aid":"XM-DAC-46004-38298-023-GRNT0307","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Vocational Education and Skills Development Project","slug":"asdb-kg","status_code":3,"day_start":15694,"day_end":18169,"day_length":2475,"description":"The project seeks to improve the quality and relevance of, and equitable access to and effectiveness of, the technical and vocational education and training (TVET) system in the Kyrgyz Republic. Quality and relevance of the TVET system will be improved through modernization of the training methodology, teaching and learning environments, and training delivery. Equitable access will be improved through the introduction of an innovative skills development fund to provide training in response to urgent labor market needs, and for targeting specific geographic areas or specific groups to provide them with employable skills, such as out-of-school youths, ethnic minorities, and the disabled. The project also includes support to rural primary vocational schools outside of Bishkek and Osh, and better access for physically disabled students and for women. The effectiveness of the TVET system will be improved by strengthening TVET governance and management nationally and within the schools.","commitment":10000000,"spend":3883328.5,"commitment_eur":7621029.5,"spend_eur":3402966,"commitment_gbp":6193155,"spend_gbp":2678671.2,"commitment_cad":9898499,"spend_cad":4908735.5,"flags":0},
{"aid":"XM-DAC-46004-38298-023-LN2902","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Vocational Education and Skills Development Project","slug":"asdb-kg","status_code":3,"day_start":15694,"day_end":18169,"day_length":2475,"description":"The project seeks to improve the quality and relevance of, and equitable access to and effectiveness of, the technical and vocational education and training (TVET) system in the Kyrgyz Republic. Quality and relevance of the TVET system will be improved through modernization of the training methodology, teaching and learning environments, and training delivery. Equitable access will be improved through the introduction of an innovative skills development fund to provide training in response to urgent labor market needs, and for targeting specific geographic areas or specific groups to provide them with employable skills, such as out-of-school youths, ethnic minorities, and the disabled. The project also includes support to rural primary vocational schools outside of Bishkek and Osh, and better access for physically disabled students and for women. The effectiveness of the TVET system will be improved by strengthening TVET governance and management nationally and within the schools.","commitment":10000000,"spend":8301853,"commitment_eur":7621029.5,"spend_eur":7303892.5,"commitment_gbp":6193155,"spend_gbp":6353719.5,"commitment_cad":9898499,"spend_cad":10814586,"flags":0},
{"aid":"XM-DAC-46004-39015-042-GRNT0077","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Tax Administration Reform and Modernization Project","slug":"asdb-kg","status_code":3,"day_start":13732,"day_end":16091,"day_length":2359,"description":"The project will contribute positively to the Kyrgyz Republic's economic growth and poverty reduction by establishing a State Tax Service (STS) that (i) helps promote macroeconomic stability and provides fiscal space for priority economic and social expenditures through increased revenue collection; (ii) minimize corruption and practices good governance and transparency, and (iii) facilitates private sector development.\n\nThe outcome of the Project is an effective, modern, and efficient STS that achieves improvement in tax collection.","commitment":10000000,"spend":9381978,"commitment_eur":7341289.5,"spend_eur":6841419,"commitment_gbp":4976788,"spend_gbp":5717619.5,"commitment_cad":10584435,"spend_cad":10024511,"flags":0},
{"aid":"XM-DAC-46004-39674-022-GRNT0123","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor 1 (Bishkek-Torugart Road) Project 1","slug":"asdb-kg","status_code":3,"day_start":14207,"day_end":15775,"day_length":1568,"description":"The 500 kilometer (km) Bishkek-Torugart road is part of the Central Asia Regional Economic Cooperation (CAREC) Corridor 1 linking the Kyrgyz Republic with the People's Republic of China (PRC) and other Central Asian countries. The Torugart post is a major border control and customs facility between the Kyrgyz Republic and the PRC. The road condition is poor; border-crossing facilities and procedures are outdated and inefficient, and they obstruct international traffic and trade. Improved road and customs infrastructure will remove the obstruction and open up this corridor for wider regional trade and economic cooperation. It will reduce travel and transit times from the current 3 to 4 days to 2 days. \n\nImprovement of the Bishkek-Torugart road will be implemented in three phases and includes (i) improving 488 km of the Bishkek-Torugart road in the Kyrgyz Republic and the 20 km Bishkek bypass road, (ii) modernizing infrastructure and facilities at the Kyrgyz Republic-PRC border crossing at Torugart, and (iii) policy and institutional support in the road subsector. The Project 1 outputs are (i) an improved 39-km road section from Km 400 to Km 439 of the Bishkek-Torugart road, (ii) modernized customs infrastructure at the Kyrgyz Republic-PRC border crossing at Torugart, (iii) a transport sector master plan for 2010-2025, and (iv) a fully operational Bishkek-Torugart Road Corridor Management Department (BTRMCD).","commitment":20000000,"spend":17536162,"commitment_eur":15709945,"spend_eur":12798307,"commitment_gbp":13033120,"spend_gbp":10701768,"commitment_cad":24382784,"spend_cad":18657742,"flags":0},
{"aid":"XM-DAC-46004-39676-023-GRNT0084","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Regional Road Corridor Improvement Project (Tajikistan)","slug":"asdb-kg","status_code":3,"day_start":13817,"day_end":16129,"day_length":2312,"description":"The PRC-Kyrgyz Republic-Tajikistan road corridor, which runs from Irkeshtam on the Kyrgyz Republic border with the People's Republic of China (PRC) to Dushanbe and is approximately 550 kilometers in length, is a key transport artery for the two landlocked countries, the Kyrgyz Republic and Tajikistan, to trade with the PRC. It is also an integral part of the regional road network in Central Asia linking the Kyrgyz Republic, PRC, Tajikistan, Afghanistan, Uzbekistan, and Turkmenistan. The project road has become a bottleneck for regional trade and transport due to its poor condition and lack of maintenance. \n\nThe Project will improve the Corridor's missing links. Its outputs include (i) improved 263 km of the two-lane road from Sary Tash in the Kyrgyz Republic to Nimich in Tajikistan (about 142 km from Sary Tash to the Kyrgyz-Tajik border and 121 km from the Kyrgyz-Tajik border to Nimich); (ii) improved infrastructure at the Kyrgyz-PRC border crossing (Irkeshtam) and the Kyrgyz-Tajik border crossing (Karamik); (iii) increased sustainability and capacity of the road subsector through outsourcing maintenance operations to the private sector in the Kyrgyz Republic and Tajikistan; and (iv) a cross-border agreement among the Kyrgyz Republic, PRC, and Tajikistan.\n\nThe Project will contribute to reducing transport costs and fostering regional trade and cooperation among Kyrgyz Republic, PRC, Tajikistan, and other Central Asian countries. The project outcome is increased regional traffic and trade, along with improved access to regional markets and social services for people living along the Corridor.","commitment":25600000,"spend":25529712,"commitment_eur":17994340,"spend_eur":18632352,"commitment_gbp":12529356,"spend_gbp":15580203,"commitment_cad":24972906,"spend_cad":27161344,"flags":0},
{"aid":"XM-DAC-46004-39676-033-LN2667","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Regional Road Corridor Improvement Project (Supplementary)","slug":"asdb-kg","status_code":3,"day_start":14918,"day_end":16129,"day_length":1211,"description":"The principal objectives of the project are to reduce transport costs and foster regional cooperation among PRC, Tajikistan and other Central Asian countries. The road will increase regional traffice and trade, improve access to regional markets and social services for people living along the Corridor.","commitment":23000000,"spend":22951578,"commitment_eur":16824150,"spend_eur":16750497,"commitment_gbp":14394600,"spend_gbp":14006477,"commitment_cad":23299232,"spend_cad":24420316,"flags":0},
{"aid":"XM-DAC-46004-41544-022-GRNT0120","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Investment Climate Improvement Program (Subprogram 1)","slug":"asdb-kg","status_code":3,"day_start":14207,"day_end":14263,"day_length":56,"description":"To support sustainable economic growth by promoting private sector development.  Specifically, it was agreed that it would include three main components:  (i) reducing regulatory burden and compliance cost; (ii) improving SME access to credit and leasing products; and (iii) developing policy and regulatory framework for public-private parnerships (PPP).","commitment":12500000,"spend":12500000,"commitment_eur":9818716,"spend_eur":9122796,"commitment_gbp":8145700,"spend_gbp":7628356.5,"commitment_cad":15239240,"spend_cad":13299476,"flags":0},
{"aid":"XM-DAC-46004-41544-072-GRNT0121","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Investment Climate Improvement Program System Support Project","slug":"asdb-kg","status_code":3,"day_start":14207,"day_end":15561,"day_length":1354,"description":"The Project aims to reduce the cost of doing business by streamlining business registration process and export and import clearance procedures. Specifically, the Project will support the establishment of a one-stop shop for business registration and a pre-customs single window for export and import clearance. The Project will have the following main components.\n\n1.\tOne-Stop Shop Business Registration. The Project will support the implementation of an automated one-stop shop that will allow all registration formalities to be completed in MOJ.  This will significantly reduce the time taken to register a business (from 21 days to 3 days), and will reduce the uncertainty associated with the approval process. A summary of the one-stop shop blueprint is in Supplementary Appendix A.\n\n2.\tPre-Customs Single Window. The Project will support the implementation of a pre-customs single window to enable businesses to submit applications and receive permits and certifications for exports and imports through a single channel. Currently, pre-customs clearance requires at least 12 separate approvals and about 25 days clearance time.  By streamlining and harmonizing regulations and automatic processes, the pre-customs single window will enable businesses to obtain clearances within 5 days and through a single administrative document","commitment":2900000,"spend":2109938.2,"commitment_eur":2277942,"spend_eur":1539882.9,"commitment_gbp":1889802.4,"spend_gbp":1287628.9,"commitment_cad":3535503.8,"spend_cad":2244885.8,"flags":0},
{"aid":"XM-DAC-46004-41544-082-GRNT0319","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Investment Climate Improvement Program - Subprogram 2","slug":"asdb-kg","status_code":3,"day_start":15670,"day_end":15743,"day_length":73,"description":"The Investment Climate Improvement Program, approved by the Asian Development Bank (ADB) in 2008, follows a programmatic approach and envisages three subprograms to assist the government in creating conditions for sustainable economic growth and employment-generating investments.  Subprogram 1, implemented in 2007-2008, included a policy-based grant, a project grant supporting the development of information technology systems for effective implementation of reforms, and a TA grant to help prepare subprogram 2. Preparation and implementation of subprogram 2 has also benefited from and reinforced other interventions.  The reforms supported under subprogram 2 build on the achievements made under subprogram 1 despite difficult political and external conditions. They address binding constraints to private sector development and diversification in the areas of business regulation and taxation, access to finance, worker skills development, and public-private partnerships (PPPs). The relevance of these constraints has been confirmed through recent studies and surveys, which explain some deviations from the constraints originally identified in 2008. Subprogram 2 is effectively gender mainstreamed to maximize benefits to women. The reform agenda that remains after subprogram 2 will be addressed under subprogram 3.\n \nSubprogram 2 complements the efforts of (i) ADB and other development partners to strengthen physical infrastructure and improve access to finance; and (ii) the International Monetary Fund (IMF) to rebuild fiscal buffers and safeguard monetary stability, which are important for a healthy business and investment climate. \n\nImproving the investment climate for the private sector is critical for the government's economic growth policies.  Subprogram 2 contributes toward this end. The Government of the Kyrgyz Republic emphasizes improving the business climate.  ADB's country operations business plan for the Kyrgyz Republic identifies subprogram 2 as a means of broadening the Kyrgyz economy and its private sector.","commitment":20000000,"spend":20000000,"commitment_eur":15593122,"spend_eur":14596473,"commitment_gbp":12524233,"spend_gbp":12205370,"commitment_cad":19940502,"spend_cad":21279162,"flags":0},
{"aid":"XM-DAC-46004-41544-084-GRNT0393","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Investment Climate Improvement Program - Subprogram 3","slug":"asdb-kg","status_code":3,"day_start":16240,"day_end":16321,"day_length":81,"description":"Subprogram 3 of the Investment Climate Improvement Program (ICIP) is the last subprogram of the program cluster approved in 2008. The program continues to address binding constraints to private investment and to sustainable economic growth and employment generation by (i) reducing the cost of regulatory compliance, (ii) improving access to finance, (iii) enhancing workers' skills, and (iv) facilitating public-private partnerships.","commitment":22000000,"spend":22000000,"commitment_eur":16185654,"spend_eur":17068788,"commitment_gbp":13014741,"spend_gbp":13499986,"commitment_cad":23827584,"spend_cad":24225988,"flags":0},
{"aid":"XM-DAC-46004-41544-088-GRNT0432","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Investment Climate Improvement Program (Subprogram 1)","slug":"asdb-kg","status_code":3,"day_start":16603,"day_end":16714,"day_length":111,"description":"The proposed program aims to create a more attractive climate for private sector development in the Kyrgyz Republic. It will provide budget support to implement reforms to (i) increase and diversify financial products and services that better mobilize domestic savings; (ii) increase efficient private sector participation in physical and social infrastructure; (iii) diversify exports and export markets, and foreign direct investment; and (iv) increase the transparency and efficiency of public procurement, and reduce the costs of doing business. The programmatic approach will comprise three subprograms to be implemented during 2015-2018.\n\nThe impact of the Second ICIP will be increased private sector investment. The outcome will be an improved business and investment climate in the Kyrgyz Republic. The Second ICIP will deliver four outputs through various policy actions: (i) financial deepening and access to finance increased; (ii) comprehensive public-private partnership program fostered; (iii) trade and investment facilitated; and (iv) transparency and efficiency of doing business increased.\n\nThrough the Second ICIP, ADB will continue to support the National Sustainable Development Strategy, 2013-2017 in removing development constraints. Reforms listed in the policy matrix will facilitate the Kyrgyz Republic's transition to a sustainable economic development path. Budget support is necessary to finance part of the development financing needs, particularly covering the period between the introduction of reforms and the fiscal benefits resulting from the reforms. Although not used as a determinant of the program size, ADB's support can also help finance the direct and indirect fiscal costs to the government of implementing and monitoring the reforms. The government has the ability to implement the reforms effectively, demonstrated by its experience under the first ICIP and with the policy-based programs of other development partners.\n\nThe Second ICIP is estimated to cost $63 million equivalent for 2015-2018, to help support a part of the development financing needs from the perspective of the overall projected budgetary financing requirements of the country (para. 14). The development financing needs are projected at approximately $600 million (2015), $517 million (2016), and $424 million (2017). The government has requested a grant not exceeding $20 million from ADB's Special Funds resources to help finance subprogram 1. Subprogram 2 (with an estimated loan amount of $23 million) and subprogram 3 (with an estimated loan amount of $20 million) are subject to further discussion between ADB and the government.\n\nThe grant for subprogram 1 will be provided in a single tranche and funds may be withdrawn upon fulfillment of the policy actions. The subsequent subprograms will be submitted for ADB Board consideration upon completion of the policy actions. The proceeds of the grant will be disbursed in accordance with ADB's simplification of disbursement procedures and related requirements for policy-based loans\nNote: A country's eligibility for Asian Development Fund grants under the revised grant framework is determined by its risk of debt distress. The outlook for the Kyrgyz Republic has deteriorated markedly since 2014. ADB considers that the Kyrgyz Republic is at moderate risk of debt distress for 2014, and is therefore eligible to receive 100% Asian Development Fund grant allocation.","commitment":20000000,"spend":20000000,"commitment_eur":17837408,"spend_eur":17818434,"commitment_gbp":12860232,"spend_gbp":13024292,"commitment_cad":24732092,"spend_cad":26533888,"flags":0},
{"aid":"XM-DAC-46004-41544-089-GRNT0487","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Investment Climate Improvement Program (Subprogram 2)","slug":"asdb-kg","status_code":3,"day_start":17025,"day_end":17165,"day_length":140,"description":"The Second ICIP aims to improve the investment climate for the private sector in the Kyrgyz Republic.  It supports increasing access to finance, enabling private participation in infrastructure, diversifying export products and markets, encouraging diversified foreign direct investment, improving skills to match market needs, increasing transparency in government, and reducing the costs of doing business.","commitment":12500000,"spend":0,"commitment_eur":11149563,"spend_eur":0,"commitment_gbp":9531165,"spend_gbp":0,"commitment_cad":16248471,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-41544-089-LN3410","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Investment Climate Improvement Program (Subprogram 2)","slug":"asdb-kg","status_code":3,"day_start":17025,"day_end":17165,"day_length":140,"description":"The Second ICIP aims to improve the investment climate for the private sector in the Kyrgyz Republic.  It supports increasing access to finance, enabling private participation in infrastructure, diversifying export products and markets, encouraging diversified foreign direct investment, improving skills to match market needs, increasing transparency in government, and reducing the costs of doing business.","commitment":12500000,"spend":12017858,"commitment_eur":11149563,"spend_eur":11400586,"commitment_gbp":9531165,"spend_gbp":9631124,"commitment_cad":16248471,"spend_cad":16036557,"flags":0},
{"aid":"XM-DAC-46004-41544-091-GRNT0563","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Second Investment Climate Improvement Program (Subprogram 3)","slug":"asdb-kg","status_code":3,"day_start":17518,"day_end":17837,"day_length":319,"description":"The program aims to improve the private sector investment climate and help diversify the economy.¬†The program will accomplish this by supporting increasing access to finance for small and medium-sized enterprises (SMEs), enabling private participation in infrastructure, diversifying export products and markets, encouraging diversified foreign direct investment (FDI), improving skills to match market needs, increasing transparency in the government, and reducing the cost of doing business.","commitment":25000000,"spend":24592040,"commitment_eur":21106390,"spend_eur":20761968,"commitment_gbp":18643914,"spend_gbp":18339676,"commitment_cad":31884622,"spend_cad":31364316,"flags":0},
{"aid":"XM-DAC-46004-41548-013-GRNT0163","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Sustainable Development Project","slug":"asdb-kg","status_code":3,"day_start":14553,"day_end":17745,"day_length":3192,"description":"The Issyk-Kul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, including use of proven technologies for treatment and disposal of solid and liquid waste. The Project will (i) improve urban infrastructure, including sewerage and sanitation, solid waste management, water supply, and community upgrading; and (ii) improve service delivery through better enterprise resource management. \n\nThe Project covers the cities of Balykchy, Cholpon-Ata, and Karakol. Its outputs are:\n\n(i) replacing a 13.4-kilometer (km) sewer network (specifically addressing pumping mains to sewage treatment plants); rehabilitating pumping stations in Balykchy and Karakol; extending the sewer network by 12 km to uncovered areas in Karakol; and supplying relevant tools, equipment, and vehicles for sewer maintenance; \n\n(ii) management of 42.5 hectares of existing waste dumps improved to increase environmental safety and sites operation lifetime and solid waste collection service coverage increased in three project cities;\n\n(iii) installing 8,550 water meters, training vodokanal enterprises in meter reading and leak control, constructing a presedimentation treatment tank at the Karakol water headworks, replacing a 2 km corroded transmission main in Balykchy, and reconstructing 10 boreholes (with treatment, energy efficient pumps, storage, and protection facilities) in Balykchy and Cholpon-Ata; \n\n(iv) providing in the three project cities, water and sanitation facilities in pre-schools, schools and health care organizations; and \n\n(v) implementing an enterprise resource management component comprising a management information system, accounting and financial management, geographic information system, asset inventory and management, and institutional effectiveness program for cities, vodokanal enterprises and tazalyk enterprises.","commitment":13500000,"spend":10818522,"commitment_eur":9052045,"spend_eur":8489887,"commitment_gbp":8139245,"spend_gbp":6853750,"commitment_cad":14304258,"spend_cad":12339964,"flags":0},
{"aid":"XM-DAC-46004-41548-013-LN2556","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Sustainable Development Project","slug":"asdb-kg","status_code":3,"day_start":14553,"day_end":17745,"day_length":3192,"description":"The Issyk-Kul Sustainable Development Project (the Project) is the first phase in a longer-term initiative by the Asian Development Bank (ADB) to support environmental management and to improve urban service delivery in the Issyk-Kul Oblast. ADB and government collaboration in Issyk-Kul will ensure that urban services interventions will increase access to potable water and safe sanitation, including use of proven technologies for treatment and disposal of solid and liquid waste. The Project will (i) improve urban infrastructure, including sewerage and sanitation, solid waste management, water supply, and community upgrading; and (ii) improve service delivery through better enterprise resource management. \n\nThe Project covers the cities of Balykchy, Cholpon-Ata, and Karakol. Its outputs are:\n\n(i)\treplacing a 13.4-kilometer (km) sewer network (specifically addressing pumping mains to sewage treatment plants); rehabilitating pumping stations in Balykchy and Karakol; extending the sewer network by 12 km to uncovered areas in Karakol; and supplying relevant tools, equipment, and vehicles for sewer maintenance; \n\n(ii)\tmanagement of 42.5 hectares of existing waste dumps improved to increase environmental safety and sites operation lifetime and solid waste collection service coverage increased in three project cities;\n\n(iii)\tinstalling 8,550 water meters, training vodokanal enterprises in meter reading and leak control, constructing a presedimentation treatment tank at the Karakol water headworks, replacing a 2 km corroded transmission main in Balykchy, and reconstructing 10 boreholes (with treatment, energy efficient pumps, storage, and protection facilities) in Balykchy and Cholpon-Ata; \n\n(iv)\tproviding in the three project cities, water and sanitation facilities in pre-schools, schools and  health care organizations; and \n\n(v)\timplementing an enterprise resource management component comprising a management information system, accounting and financial management, geographic information system, asset inventory and management, and institutional effectiveness program for cities, vodokanal enterprises and tazalyk enterprises.","commitment":16500000,"spend":11669171,"commitment_eur":11063611,"spend_eur":9899281,"commitment_gbp":9947966,"spend_gbp":7768652.5,"commitment_cad":17482982,"spend_cad":14425419,"flags":0},
{"aid":"XM-DAC-46004-42399-013-GRNT0153","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor I (Bishkek-Torugart Road) Project 2","slug":"asdb-kg","status_code":3,"day_start":14461,"day_end":16495,"day_length":2034,"description":"The CAREC Transport Corridor I (Bishkek-Torugart Road) Project II will continue the rehabilitation work on the section from km 439 to km 476, next to Project I.  It will also help the design of remaining sections of the thoroughfare to be completed and the transport sector masterplan to be implemented on time. These would help the government to continue working towards the corridor improvement target of 2013, and the national goals set out in the country development strategy (2007-2010). Additionally, in the longer term, it would contribute to the realization of the CAREC vision. \n\nIt has 2 components: The physical component includes rehabilitating 75km of the Bishkek-Torugart Road and constructing a facility for managing international (cross border) passenger and freight movements to and from the PRC. The non-physical component is for implementing the human resource development measures recommended in the transport sector masterplan being prepared under Grant 0123-KGZ.","commitment":22000000,"spend":21998320,"commitment_eur":15419796,"spend_eur":16131311,"commitment_gbp":13303432,"spend_gbp":13439639,"commitment_cad":23916322,"spend_cad":23503540,"flags":0},
{"aid":"XM-DAC-46004-42399-013-LN2533","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor I (Bishkek-Torugart Road) Project 2","slug":"asdb-kg","status_code":3,"day_start":14461,"day_end":16495,"day_length":2034,"description":"The CAREC Transport Corridor I (Bishkek-Torugart Road) Project II will continue the rehabilitation work on the section from km 439 to km 476, next to Project I.  It will also help the design of remaining sections of the thoroughfare to be completed and the transport sector masterplan to be implemented on time. These would help the government to continue working towards the corridor improvement target of 2013, and the national goals set out in the country development strategy (2007-2010). Additionally, in the longer term, it would contribute to the realization of the CAREC vision. \n\nIt has 2 components: The physical component includes rehabilitating 75km of the Bishkek-Torugart Road and constructing a facility for managing international (cross border) passenger and freight movements to and from the PRC. The non-physical component is for implementing the human resource development measures recommended in the transport sector masterplan being prepared under Grant 0123-KGZ.","commitment":28000000,"spend":27793072,"commitment_eur":19625194,"spend_eur":20387924,"commitment_gbp":16931640,"spend_gbp":16981626,"commitment_cad":30438954,"spend_cad":29708864,"flags":0},
{"aid":"XM-DAC-46004-42399-023-LN2755","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor I (Bishkek-Torugart Road) Project 3","slug":"asdb-kg","status_code":3,"day_start":15236,"day_end":17658,"day_length":2422,"description":"The CAREC Corridor 1 (Bishkek-Torugart Road) Project 3 (the project) will help the government improve the 60-km section from At Beit to Torugart at the People's Republic of China (PRC) border. Together with the ongoing improvement works in the other sections, it will enable all weather road travel between Bishkek and Kashi. Aside from the economic benefits of higher speeds and reliability, the better road geometry and protective structures resulting from the improvement will reduce the accidental toxic spill risk and material run-off from vehicles. These reductions will benefit the ecosystem of Chatyr Kul lake--a wetland of international significance and protected under the Ramsar convention. \n\nThe project will also strengthen infrastructure management skills of government staff engaged in the road sector. This is an essential and natural complement to the capital investment. The Asian Development Bank (ADB) provided technical assistance for institutional strengthening and capacity building totaling nearly $6 million between 1996 and 2010. The World Bank and the European Bank for Reconstruction and Development have more assistance programmed for 2011. These are short and one-off interventions. The project, in contract, supports a long-term, results oriented program of learning and development for government staff. It will result in better informed staff, equipped to champion strategies for reducing life cycle costs and improving user cost recovery.","commitment":55000000,"spend":51049184,"commitment_eur":40003684,"spend_eur":41084468,"commitment_gbp":34850620,"spend_gbp":32450678,"commitment_cad":55142752,"spend_cad":59851844,"flags":0},
{"aid":"XM-DAC-46004-42399-024-GRNT0418","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor I (Bishkek-Torugart Road) Project 3 - Additional Financing","slug":"asdb-kg","status_code":3,"day_start":16430,"day_end":17658,"day_length":1228,"description":"The additional financing of the Central Asia Regional Economic Cooperation (CAREC) Corridor 1 (Bishkek-Torugart Road) Project 3 will cover the cost overruns that have resulted in a funding gap for the project whose rationale remains valid and physical progress on-track. The project, by improving the last 60 kilometers (km) bottleneck section of the CAREC Corridor 1 (Bishkek-Torugart Road), will contribute to fostering regional trade between the Kyrgyz Republic and the People's Republic of China (PRC) and higher mobility for people in Naryn Province where poverty is widespread. It will also help increase sustainability of the national road network by training staff on infrastructure management.","commitment":4300000,"spend":4142306.8,"commitment_eur":3487323,"spend_eur":3751734.5,"commitment_gbp":2748355.2,"spend_gbp":2829729,"commitment_cad":4958986.5,"spend_cad":5554631,"flags":0},
{"aid":"XM-DAC-46004-42399-024-LN3204","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation (CAREC) Transport Corridor I (Bishkek-Torugart Road) Project 3 - Additional Financing","slug":"asdb-kg","status_code":3,"day_start":16430,"day_end":17658,"day_length":1228,"description":"The additional financing of the Central Asia Regional Economic Cooperation (CAREC) Corridor 1 (Bishkek-Torugart Road) Project 3 will cover the cost overruns that have resulted in a funding gap for the project whose rationale remains valid and physical progress on-track. The project, by improving the last 60 kilometers (km) bottleneck section of the CAREC Corridor 1 (Bishkek-Torugart Road), will contribute to fostering regional trade between the Kyrgyz Republic and the People's Republic of China (PRC) and higher mobility for people in Naryn Province where poverty is widespread. It will also help increase sustainability of the national road network by training staff on infrastructure management.","commitment":10800000,"spend":9363553,"commitment_eur":8758858,"spend_eur":8512819,"commitment_gbp":6902845.5,"spend_gbp":6727016.5,"commitment_cad":12455129,"spend_cad":12507484,"flags":0},
{"aid":"XM-DAC-46004-43456-023-GRNT0218","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Power Sector Improvement Project (formerly Transmission and Distribution Metering Project)","slug":"asdb-kg","status_code":3,"day_start":14951,"day_end":17905,"day_length":2954,"description":"While the entire power sector needs modernization, the Government places highest priority on loss reduction and strengthening governance. This is not only to improve commercial operations, but to regain the population's confidence in the power sector and to reestablish political stability. Energy security through generation capacity expansion is a priority, but the short-term solutions are to improve system efficiency and reliability, and to enhance regional power trade. The proposed Project contributes to attaining the goals through the following components:\n\n(i)\tAutomated Metering and Data Acquisition system (AMDA) will bring transparency to the wholesale electricity transaction between the unbundled power companies as well as in regional power trade. AMDA will eliminate errors and rampant metering data manipulation that are untraceable by the current archaic technology. Loss reduction will make more power available domestically and also improve the financial performance of the power companies. Accurate power flow data is indispensible to improve the power companies' commercial operation performance. The system also enhances regional power trade through (i) meeting the CAPS metering accuracy requirement, and (ii) eliminating unauthorized export.\n\n(ii)\tSubstation Rehabilitation will improve reliability of the Kyrgyz power system by replacing dilapidated circuit-breakers and instrument transformers that have reached their economic lives, are technologically obsolete, or do not meet the accuracy requirement for regional power trade. Since the Kyrgyz system is intricately interconnected with the Central Asia Power System (CAPS), rehabilitation increases reliability of the regional system and enhance regional power trade. \n\n(iii)\tCommunications and Supervisory Control and Data Acquisition (SCADA) system will link seven major substations (estimated) and the control centers via optical fiber, and enables the system operator to make efficient dispatching based on real-time data. The scope is limited to system monitoring function of the northern loop. SCADA will reduce technical losses through avoidance of overloading, and also enable faster detection and restoration of faults. The system improves the overall efficiency and reliability of the Kyrgyz system and CAPS.\n\n(iv)\tStudy on Electricity Settlement Center will study the settlement systems appropriate to bring about transparency and accountability to the Kyrgyz power sector, and to maximize the benefits of the AMDA. It will devise mechanisms to publish data on energy flows and manage distribution of sector revenues in a transparent manner.\n\n(v)\tCorporate and Financial Management Capacity Building for the National Electric Grid of Kyrgyzstan (NEGK) will improve corporate management through the preparation of a corporate business plan including the review of investment needs, operation and maintenance practices, organizational reforms, internal control, asset revaluation, and cost of transmission service. Financial management capacity will be strengthened through introduction of the International Financial Reporting Standards (IFRS) and appropriate corporate accounting software. \n\nThe project fits with ADB's Starategy 2020 and ADB's Energy Policy.  The latter focuses on energy efficiency, cutting fossil fuel use, energy security, energy access, and regional cooperation.  The project also promotoes capacity development and governance.","commitment":28100000,"spend":17621244,"commitment_eur":21247678,"spend_eur":14121215,"commitment_gbp":18014790,"spend_gbp":11663164,"commitment_cad":28311506,"spend_cad":20505210,"flags":0},
{"aid":"XM-DAC-46004-43456-023-LN2671","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Power Sector Improvement Project (formerly Transmission and Distribution Metering Project)","slug":"asdb-kg","status_code":3,"day_start":14951,"day_end":17905,"day_length":2954,"description":"While the entire power sector needs modernization, the Government places highest priority on loss reduction and strengthening governance. This is not only to improve commercial operations, but to regain the population's confidence in the power sector and to reestablish political stability. Energy security through generation capacity expansion is a priority, but the short-term solutions are to improve system efficiency and reliability, and to enhance regional power trade. The proposed Project contributes to attaining the goals through the following components:\n\n(i)\tAutomated Metering and Data Acquisition system (AMDA) will bring transparency to the wholesale electricity transaction between the unbundled power companies as well as in regional power trade. AMDA will eliminate errors and rampant metering data manipulation that are untraceable by the current archaic technology. Loss reduction will make more power available domestically and also improve the financial performance of the power companies. Accurate power flow data is indispensible to improve the power companies' commercial operation performance. The system also enhances regional power trade through (i) meeting the CAPS metering accuracy requirement, and (ii) eliminating unauthorized export.\n\n(ii)\tSubstation Rehabilitation will improve reliability of the Kyrgyz power system by replacing dilapidated circuit-breakers and instrument transformers that have reached their economic lives, are technologically obsolete, or do not meet the accuracy requirement for regional power trade. Since the Kyrgyz system is intricately interconnected with the Central Asia Power System (CAPS), rehabilitation increases reliability of the regional system and enhance regional power trade. \n\n(iii)\tCommunications and Supervisory Control and Data Acquisition (SCADA) system will link seven major substations (estimated) and the control centers via optical fiber, and enables the system operator to make efficient dispatching based on real-time data. The scope is limited to system monitoring function of the northern loop. SCADA will reduce technical losses through avoidance of overloading, and also enable faster detection and restoration of faults. The system improves the overall efficiency and reliability of the Kyrgyz system and CAPS.\n\n(iv)\tStudy on Electricity Settlement Center will study the settlement systems appropriate to bring about transparency and accountability to the Kyrgyz power sector, and to maximize the benefits of the AMDA. It will devise mechanisms to publish data on energy flows and manage distribution of sector revenues in a transparent manner.\n\n(v)\tCorporate and Financial Management Capacity Building for the National Electric Grid of Kyrgyzstan (NEGK) will improve corporate management through the preparation of a corporate business plan including the review of investment needs, operation and maintenance practices, organizational reforms, internal control, asset revaluation, and cost of transmission service. Financial management capacity will be strengthened through introduction of the International Financial Reporting Standards (IFRS) and appropriate corporate accounting software. \n\nThe project fits with ADB's Starategy 2020 and ADB's Energy Policy.  The latter focuses on energy efficiency, cutting fossil fuel use, energy security, energy access, and regional cooperation.  The project also promotoes capacity development and governance.","commitment":16700000,"spend":15496759,"commitment_eur":12627624,"spend_eur":12801198,"commitment_gbp":10706299,"spend_gbp":10805379,"commitment_cad":16825700,"spend_cad":18841770,"flags":0},
{"aid":"XM-DAC-46004-44198-013-GRNT0294","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Power Sector Rehabilitation Project","slug":"asdb-kg","status_code":3,"day_start":15595,"day_end":18437,"day_length":2842,"description":"The project will: (i) rehabilitate Toktogul hydroelectric power plant by replacing existing mechanical and electrical equipment; (ii) establish an electricity transactions settlement center; (iii) conduct a safety assessment of dams on the Naryn cascade, and (iv) conduct a public information program on sector reforms. The project will improve energy supply, reduce system commercial losses, identify dam rehabilitation measures, and inform the public on sector developments.","commitment":40000000,"spend":14202762,"commitment_eur":31075132,"spend_eur":12673690,"commitment_gbp":24811972,"spend_gbp":10566366,"commitment_cad":39142176,"spend_cad":18638656,"flags":0},
{"aid":"XM-DAC-46004-44198-013-LN2869","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Power Sector Rehabilitation Project","slug":"asdb-kg","status_code":3,"day_start":15595,"day_end":18437,"day_length":2842,"description":"The project will: (i) rehabilitate Toktogul hydroelectric power plant by replacing existing mechanical and electrical equipment; (ii) establish an electricity transactions settlement center; (iii) conduct a safety assessment of dams on the Naryn cascade, and (iv) conduct a public information program on sector reforms. The project will improve energy supply, reduce system commercial losses, identify dam rehabilitation measures, and inform the public on sector developments.","commitment":15000000,"spend":10965876,"commitment_eur":11653175,"spend_eur":9555503,"commitment_gbp":9304490,"spend_gbp":8262131.5,"commitment_cad":14678317,"spend_cad":14309082,"flags":0},
{"aid":"XM-DAC-46004-44236-013-GRNT0217","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Emergency Assistance for Recovery and Reconstruction","slug":"asdb-kg","status_code":3,"day_start":14879,"day_end":17070,"day_length":2191,"description":"The Emergency Assistance for Recovery and Reconstruction (EARR) will (i) rebuild damaged houses and improve essential public and community infrastructure, and (ii) restore the country's immediate fiscal capacity to meet the sharp rise in incremental costs arising from the April and June 2010 conflicts. This will in turn help the Kyrgyz Republic with reconciliation efforts and restoration of normalcy. The impact of the EARR is economic recovery and social reconciliation. The EARR's outcome is maintenance of essential public expenditures and rebuilding of critical social and public infrastructure assets in areas affected by the community violence.","commitment":51500000,"spend":51500000,"commitment_eur":39406564,"spend_eur":37774256,"commitment_gbp":33071900,"spend_gbp":31522076,"commitment_cad":53203920,"spend_cad":55083424,"flags":0},
{"aid":"XM-DAC-46004-44236-013-LN2668","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Emergency Assistance for Recovery and Reconstruction","slug":"asdb-kg","status_code":3,"day_start":14879,"day_end":17128,"day_length":2249,"description":"The Emergency Assistance for Recovery and Reconstruction (EARR) will (i) rebuild damaged houses and improve essential public and community infrastructure, and (ii) restore the country's immediate fiscal capacity to meet the sharp rise in incremental costs arising from the April and June 2010 conflicts. This will in turn help the Kyrgyz Republic with reconciliation efforts and restoration of normalcy. The impact of the EARR is economic recovery and social reconciliation. The EARR's outcome is maintenance of essential public expenditures and rebuilding of critical social and public infrastructure assets in areas affected by the community violence.","commitment":48500000,"spend":46749824,"commitment_eur":37111036,"spend_eur":37756712,"commitment_gbp":31145382,"spend_gbp":29825650,"commitment_cad":50104660,"spend_cad":54598264,"flags":0},
{"aid":"XM-DAC-46004-45169-001-GRNT0366","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridor 3 (Bishkek-Osh Road) Improvement Project, Phase 4","slug":"asdb-kg","status_code":3,"day_start":16087,"day_end":19982,"day_length":3895,"description":"The project will improve national and regional connectivity by reconstructing and rehabilitating an estimated 120 km of crucial road sections between Bishkek and Osh, and will include road safety measures such as road signs, lane markings, street lighting, parking areas, bus stops, crash barriers, and sidewalks. The impact of the project will be enhanced regional connectivity and trade via CAREC Corridor 3. The outcome will be improved efficiency and safer movement of goods and people on the Bishkek-Osh road. The project outputs will be (i) 52.5 km of rehabilitated road from Bishkek to Kara Balta, (ii) 67 km of rehabilitated road from Madaniyat to Jalalabad, (iii) strengthened road asset management system, and (iv) improved road safety.","commitment":35000000,"spend":22160268,"commitment_eur":25712276,"spend_eur":20027022,"commitment_gbp":21245922,"spend_gbp":17143460,"commitment_cad":38293180,"spend_cad":29040966,"flags":0},
{"aid":"XM-DAC-46004-45169-001-LN3056","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridor 3 (Bishkek-Osh Road) Improvement Project, Phase 4","slug":"asdb-kg","status_code":3,"day_start":16087,"day_end":19591,"day_length":3504,"description":"The project will improve national and regional connectivity by reconstructing and rehabilitating an estimated 120 km of crucial road sections between Bishkek and Osh, and will include road safety measures such as road signs, lane markings, street lighting, parking areas, bus stops, crash barriers, and sidewalks. The impact of the project will be enhanced regional connectivity and trade via CAREC Corridor 3. The outcome will be improved efficiency and safer movement of goods and people on the Bishkek-Osh road. The project outputs will be (i) 52.5 km of rehabilitated road from Bishkek to Kara Balta, (ii) 67 km of rehabilitated road from Madaniyat to Jalalabad, (iii) strengthened road asset management system, and (iv) improved road safety.","commitment":65000000,"spend":52712132,"commitment_eur":47751368,"spend_eur":47015212,"commitment_gbp":39456712,"spend_gbp":40982500,"commitment_cad":71115904,"spend_cad":69312950,"flags":0},
{"aid":"XM-DAC-46004-45910-014-LN2849","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Senior Unsecured Loan in Kyrgyz Investment and Credit Bank Small and Medium-Sized Enterprise Finance","slug":"asdb-kg","status_code":3,"day_start":15477,"day_end":17059,"day_length":1582,"description":"The project consists of a senior US$10 million loan to Kyrgyz Investment and Credit Bank for the purpose of funding small and medium-sized enterprises (SMEs) in the country.","commitment":10000000,"spend":10000000,"commitment_eur":7803602,"spend_eur":7298236.5,"commitment_gbp":6277607,"spend_gbp":6102685,"commitment_cad":10097591,"spend_cad":10639581,"flags":0},
{"aid":"XM-DAC-46004-46124-001-GRNT0340","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Regional Improvement of Border Services Project (RIBS)","slug":"asdb-kg","status_code":3,"day_start":15847,"day_end":19552,"day_length":3705,"description":"The project will support the construction and renovation of border crossing points (BCPs) in cases where investments to upgrade complementary facilities on the other side of the border have been completed or are nearing completion. National single windows (NSWs) alone would not be enough to achieve best results because all CAREC countries are transit countries and shipments have to cross multiple borders. This requires networking and the interoperability of NSWs at the CAREC regional level. \n\nThe project will benefit from ongoing and proposed CAREC Customs Cooperation Committee initiatives, including joint customs control, simplification of customs procedures, and the development of information and communication technology for customs modernization. Specifically, the project will focus on the following:\n\n1. BCP improvement. The project will improve infrastructure at two road BCPs to improve working conditions and performance of border management personnel, and reduce processing time and cost: \n(i) In the Kyrgyz Republic, at the Karamyk BCP, located along CAREC corridors 3b and 5, (a) the inspection facilities including customs, sanitary and quarantine, and veterinary checkpoints will be improved to handle traffic growth and improve the inspection process; and (b) power, water supply and sewerage facilities, communication facilities, and office and inspection equipment will be provided. \n(ii) In Tajikistan, at the Guliston BCP, located in a key conduit of the regional Osh-Khujand highway, facilities will be upgraded and equipped, including infrastructure for vehicle inspection and two new border check posts, and water supply and sewerage facilities provided.\n\n2. NSW development. This project will support the establishment of NSW facilities to streamline data submission to international trade regulators, and ensure conformity of submitted data with the requirements of business processes in various stages of trade and transport in the international supply chain. International standards will be adopted to ensure regional interoperability.  The subcomponents of NSW facilities in the two countries include (i) single window and trade portal software development; (ii) single window backup system and hardware, regional centers, and trade portal hardware; (iii) certificate of origin and licensed track and trace of system development; (iv) operating assistance to the single window governance and working groups; (v) business process analysis and re-engineering (for up to 10 government agencies); (vi) legal and regulatory framework review; (vii) stakeholder engagement and public awareness activities; and (viii) market study and research. In terms of sequencing, a flexible software development process will incorporate possible policy and regulatory changes resulting from subcomponents (v) and (vi).","commitment":4202000,"spend":2928542.8,"commitment_eur":3234147.5,"spend_eur":2614334.5,"commitment_gbp":2745602,"spend_gbp":2121398.2,"commitment_cad":4284357,"spend_cad":3808194.5,"flags":0},
{"aid":"XM-DAC-46004-46124-001-LN2995","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Regional Improvement of Border Services Project (RIBS)","slug":"asdb-kg","status_code":3,"day_start":15847,"day_end":19552,"day_length":3705,"description":"The project will support the construction and renovation of border crossing points (BCPs) in cases where investments to upgrade complementary facilities on the other side of the border have been completed or are nearing completion. National single windows (NSWs) alone would not be enough to achieve best results because all CAREC countries are transit countries and shipments have to cross multiple borders. This requires networking and the interoperability of NSWs at the CAREC regional level. \n\nThe project will benefit from ongoing and proposed CAREC Customs Cooperation Committee initiatives, including joint customs control, simplification of customs procedures, and the development of information and communication technology for customs modernization. Specifically, the project will focus on the following:\n\n1. BCP improvement. The project will improve infrastructure at two road BCPs to improve working conditions and performance of border management personnel, and reduce processing time and cost: \n(i) In the Kyrgyz Republic, at the Karamyk BCP, located along CAREC corridors 3b and 5, (a) the inspection facilities including customs, sanitary and quarantine, and veterinary checkpoints will be improved to handle traffic growth and improve the inspection process; and (b) power, water supply and sewerage facilities, communication facilities, and office and inspection equipment will be provided. \n(ii) In Tajikistan, at the Guliston BCP, located in a key conduit of the regional Osh-Khujand highway, facilities will be upgraded and equipped, including infrastructure for vehicle inspection and two new border check posts, and water supply and sewerage facilities provided.\n\n2. NSW development. This project will support the establishment of NSW facilities to streamline data submission to international trade regulators, and ensure conformity of submitted data with the requirements of business processes in various stages of trade and transport in the international supply chain. International standards will be adopted to ensure regional interoperability.  The subcomponents of NSW facilities in the two countries include (i) single window and trade portal software development; (ii) single window backup system and hardware, regional centers, and trade portal hardware; (iii) certificate of origin and licensed track and trace of system development; (iv) operating assistance to the single window governance and working groups; (v) business process analysis and re-engineering (for up to 10 government agencies); (vi) legal and regulatory framework review; (vii) stakeholder engagement and public awareness activities; and (viii) market study and research. In terms of sequencing, a flexible software development process will incorporate possible policy and regulatory changes resulting from subcomponents (v) and (vi).","commitment":4202000,"spend":3616554.2,"commitment_eur":3234147.5,"spend_eur":3196189,"commitment_gbp":2745602,"spend_gbp":2831635.5,"commitment_cad":4284357,"spend_cad":4757158,"flags":0},
{"aid":"XM-DAC-46004-46348-003-GRNT0419","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Toktogul Rehabilitation Phase 2 Project","slug":"asdb-kg","status_code":2,"day_start":16430,"day_end":19173,"day_length":2743,"description":"The project will (i) continue the phased rehabilitation of Toktogul hydroelectric power plant (HPP) by replacing two of the four existing generator and turbine units and associated auxiliary equipment; (ii) implement a business process improvement project for the main generation company, open joint-stock company Electric Power Plants (EPP); (iii) prepare an asset inventory and revaluation for the seven power companies,  and Bishkekteploset (heat and hot water distribution company); and (iv) prepare a power sector master plan to include a due diligence study for the rehabilitation of Uch Kurgan HPP. The project will increase domestic energy supply and international electricity trade, improve asset management and sector planning, and strengthen sector operational performance.","commitment":44500000,"spend":21804420,"commitment_eur":36089736,"spend_eur":19563074,"commitment_gbp":28442282,"spend_gbp":16620321,"commitment_cad":51319744,"spend_cad":28475348,"flags":0},
{"aid":"XM-DAC-46004-46348-003-LN3212","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Toktogul Rehabilitation Phase 2 Project","slug":"asdb-kg","status_code":2,"day_start":16430,"day_end":19173,"day_length":2743,"description":"The project will (i) continue the phased rehabilitation of Toktogul hydroelectric power plant (HPP) by replacing two of the four existing generator and turbine units and associated auxiliary equipment; (ii) implement a business process improvement project for the main generation company, open joint-stock company Electric Power Plants (EPP); (iii) prepare an asset inventory and revaluation for the seven power companies,  and Bishkekteploset (heat and hot water distribution company); and (iv) prepare a power sector master plan to include a due diligence study for the rehabilitation of Uch Kurgan HPP. The project will increase domestic energy supply and international electricity trade, improve asset management and sector planning, and strengthen sector operational performance.","commitment":65500000,"spend":31780786,"commitment_eur":53120848,"spend_eur":28307438,"commitment_gbp":41864480,"spend_gbp":24448356,"commitment_cad":75538050,"spend_cad":41746292,"flags":0},
{"aid":"XM-DAC-46004-46537-002-GRNT0407","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Strengthening Education System Sector Development Program","slug":"asdb-kg","status_code":3,"day_start":16458,"day_end":17905,"day_length":1447,"description":"The sector development program (SDP) will support the government's plans to improve school education quality as enunciated in the Education Development Strategy for 2012-2020, and the National Strategy for Sustainable Development launched in 2013, which recognizes \"\"the quality of education\"\" as \"\"one of the most reliable indicators of the future development of any nation\"\".  The SDP is reflected in the draft COBP 2014-2016 and in the draft KGZ CPS 2013-17. The SDP will also support the Kyrgyz Republic's plans to join the European Higher Education Area and steps taken to implement the Bologna 3-cycle academic process, curriculum development for a Master degree program in pedagogy and supporting reforms in the quality assurance system. \nThe program component under the SDP will include: (i) creation of an independent curriculum and textbooks review mechanism in MOES by establishing a consultative council; (ii) approval of quality assurance standards and accreditation system for pedagogy programs; (iii) regulations for delivery of MA/MS program in pedagogy in universities; (iv) defining e-education standards for institutions providing distance education option to students; (v) establishing a school development fund to rehabilitate selected schools; and (vi) strengthening community participation in schools. The SDP will aim to create sustainable reforms process and accrual of long term benefits to the country.\nThe investment component under the SDP will aim at improving the quality of education, including support for: (i) full implementation of curricula developed under the SEP; (ii) development and printing of LTMs for grades 7-9 and teacher training for the new curriculum; (iii) strengthened pre- and in-service teacher training systems; (iv) improved learning environment in selected innovative resource schools through showcasing of reforms and provision of additional infrastructure; (v) support for a Bologna process compliant quality assurance system for pedagogical programs; (vi) improved community participation in schools; and (vii) consultancy services, studies, surveys, and stakeholder consultation workshops.\nTextbook printing, financed by the project component will follow implementation of an effective textbook rental scheme and commitment to reprint textbooks using textbook revolving fund. In March 2013, the World Bank approved the Sector Support for Education Reform Project for Kyrgyz Republic. This $16.5 million project will primarily focus on primary and lower secondary education and support improved learning outcomes in the education sector including improved teacher training, revision of curricular, printing and provision of learning and teaching materials up to grade 6. The SDP will be developed in close coordination with the World Bank project to ensure synergies and support.\nImpact, Outcome, and Outputs\nThe impact will be strengthened and coherently functioning school education system in Kyrgyz Republic. The outcome will be learning environment and key quality aspects of school education improved in Kyrgyz Republic. The four outputs are: (i) curricula and LTMs for secondary schools developed, piloted, and printed; (ii) improved access to quality teacher education and training programs; (iii) improved learning environment in innovative resource schools; and (iv) greater community involvement in school management.","commitment":10000000,"spend":3000000,"commitment_eur":8620452,"spend_eur":2672765,"commitment_gbp":6603029.5,"spend_gbp":1953643.8,"commitment_cad":12150523,"spend_cad":3980083.2,"flags":0},
{"aid":"XM-DAC-46004-46537-002-GRNT0408","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Strengthening Education System Sector Development Program","slug":"asdb-kg","status_code":3,"day_start":16458,"day_end":19292,"day_length":2834,"description":"The sector development program (SDP) will support the government's plans to improve school education quality as enunciated in the Education Development Strategy for 2012-2020, and the National Strategy for Sustainable Development launched in 2013, which recognizes \"\"the quality of education\"\" as \"\"one of the most reliable indicators of the future development of any nation\"\".  The SDP is reflected in the draft COBP 2014-2016 and in the draft KGZ CPS 2013-17. The SDP will also support the Kyrgyz Republic's plans to join the European Higher Education Area and steps taken to implement the Bologna 3-cycle academic process, curriculum development for a Master degree program in pedagogy and supporting reforms in the quality assurance system. \nThe program component under the SDP will include: (i) creation of an independent curriculum and textbooks review mechanism in MOES by establishing a consultative council; (ii) approval of quality assurance standards and accreditation system for pedagogy programs; (iii) regulations for delivery of MA/MS program in pedagogy in universities; (iv) defining e-education standards for institutions providing distance education option to students; (v) establishing a school development fund to rehabilitate selected schools; and (vi) strengthening community participation in schools. The SDP will aim to create sustainable reforms process and accrual of long term benefits to the country.\nThe investment component under the SDP will aim at improving the quality of education, including support for: (i) full implementation of curricula developed under the SEP; (ii) development and printing of LTMs for grades 7-9 and teacher training for the new curriculum; (iii) strengthened pre- and in-service teacher training systems; (iv) improved learning environment in selected innovative resource schools through showcasing of reforms and provision of additional infrastructure; (v) support for a Bologna process compliant quality assurance system for pedagogical programs; (vi) improved community participation in schools; and (vii) consultancy services, studies, surveys, and stakeholder consultation workshops.\nTextbook printing, financed by the project component will follow implementation of an effective textbook rental scheme and commitment to reprint textbooks using textbook revolving fund. In March 2013, the World Bank approved the Sector Support for Education Reform Project for Kyrgyz Republic. This $16.5 million project will primarily focus on primary and lower secondary education and support improved learning outcomes in the education sector including improved teacher training, revision of curricular, printing and provision of learning and teaching materials up to grade 6. The SDP will be developed in close coordination with the World Bank project to ensure synergies and support.\nImpact, Outcome, and Outputs\nThe impact will be strengthened and coherently functioning school education system in Kyrgyz Republic. The outcome will be learning environment and key quality aspects of school education improved in Kyrgyz Republic. The four outputs are: (i) curricula and LTMs for secondary schools developed, piloted, and printed; (ii) improved access to quality teacher education and training programs; (iii) improved learning environment in innovative resource schools; and (iv) greater community involvement in school management.","commitment":12000000,"spend":5658852.5,"commitment_eur":10344543,"spend_eur":5016963.5,"commitment_gbp":7923635.5,"spend_gbp":4215283.5,"commitment_cad":14580628,"spend_cad":7366732.5,"flags":0},
{"aid":"XM-DAC-46004-48401-007-GRNT0496","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project","slug":"asdb-kg","status_code":2,"day_start":17137,"day_end":19023,"day_length":1886,"description":"The project will connect two major CAREC regional corridors by rehabilitating a crucial connector road, part of the North-South Alternate Corridor, which is a priority in the National Sustainable Development Strategy.  It will improve connectivity and mobility in the country and link the economic underprivileged regions with the economic hubs, as well as strengthen road maintenance practices and institutional capacity by introducing and implementing a road asset management system and a project implementation unit administrative manual and procedure.","commitment":36720000,"spend":24963606,"commitment_eur":34833956,"spend_eur":22747234,"commitment_gbp":29427446,"spend_gbp":19469754,"commitment_cad":48998948,"spend_cad":33630388,"flags":0},
{"aid":"XM-DAC-46004-48401-007-GRNT0621","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project","slug":"asdb-kg","status_code":2,"day_start":17893,"day_end":21183,"day_length":3290,"description":"The project will connect two major CAREC regional corridors by rehabilitating a crucial connector road, part of the North-South Alternate Corridor, which is a priority in the National Sustainable Development Strategy. It will improve connectivity and mobility in the country and link the economic underprivileged regions with the economic hubs, as well as strengthen road maintenance practices and institutional capacity by introducing and implementing a road asset management system and a project implementation unit administrative manual and procedure.","commitment":9500000,"spend":1488757.6,"commitment_eur":8344794.5,"spend_eur":1283187.9,"commitment_gbp":7491533,"spend_gbp":1112169.1,"commitment_cad":12763366,"spend_cad":2058773.2,"flags":0},
{"aid":"XM-DAC-46004-48401-007-GRNT6002","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project","slug":"asdb-kg","status_code":3,"day_start":16601,"day_end":17365,"day_length":764,"description":"The project will connect two major CAREC regional corridors by rehabilitating a crucial connector road, part of the North-South Alternate Corridor, which is a priority in the National Sustainable Development Strategy. It will improve connectivity and mobility in the country and link the economic underprivileged regions with the economic hubs, as well as strengthen road maintenance practices and institutional capacity by introducing and implementing a road asset management system and a project implementation unit administrative manual and procedure.","commitment":3000000,"spend":0,"commitment_eur":2675611.2,"spend_eur":0,"commitment_gbp":1929034.8,"spend_gbp":0,"commitment_cad":3709813.8,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-48401-007-LN3432","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project","slug":"asdb-kg","status_code":2,"day_start":17137,"day_end":19023,"day_length":1886,"description":"The project will connect two major CAREC regional corridors by rehabilitating a crucial connector road, part of the North-South Alternate Corridor, which is a priority in the National Sustainable Development Strategy.  It will improve connectivity and mobility in the country and link the economic underprivileged regions with the economic hubs, as well as strengthen road maintenance practices and institutional capacity by introducing and implementing a road asset management system and a project implementation unit administrative manual and procedure.","commitment":58390000,"spend":35516412,"commitment_eur":55390924,"spend_eur":32224636,"commitment_gbp":46793808,"spend_gbp":27690708,"commitment_cad":77915264,"spend_cad":47917064,"flags":0},
{"aid":"XM-DAC-46004-48401-007-LN3730","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project","slug":"asdb-kg","status_code":2,"day_start":17893,"day_end":21183,"day_length":3290,"description":"The project will connect two major CAREC regional corridors by rehabilitating a crucial connector road, part of the North-South Alternate Corridor, which is a priority in the National Sustainable Development Strategy. It will improve connectivity and mobility in the country and link the economic underprivileged regions with the economic hubs, as well as strengthen road maintenance practices and institutional capacity by introducing and implementing a road asset management system and a project implementation unit administrative manual and procedure.","commitment":68500000,"spend":4729303,"commitment_eur":60170360,"spend_eur":4073153.2,"commitment_gbp":54017896,"spend_gbp":3540714,"commitment_cad":92030590,"spend_cad":6556700.5,"flags":0},
{"aid":"XM-DAC-46004-49013-002-GRNT0494","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Toktogul Rehabilitation Phase 3 Project","slug":"asdb-kg","status_code":2,"day_start":17148,"day_end":19538,"day_length":2390,"description":"The Asian Development Bank (ADB) financed the rehabilitation of the first two turbine-generator units and secondary electrical equipment of the largest and most important power plant in the Kyrgyz Republic under the Power Sector Rehabilitation Project (Phase 1) and the Toktogul Rehabilitation Phase 2 Project.  The proposed phase 3 project aims to (i) complete the rehabilitation of the Toktogul hydroelectric power plant (HPP) by replacing the two remaining turbine-generator units and refurbishing the civil structures of Toktogul dam, (ii) overhaul the dam monitoring systems at five dams along the Naryn cascade, (iii) continue the information campaign to educate the public on sector reforms, (iv) conduct corporate financial audits and business operation assessments of eight state-owned power and heat companies, and (v) implement a management modernization program for the power generation company.","commitment":50000000,"spend":19855582,"commitment_eur":47431860,"spend_eur":17971460,"commitment_gbp":40070052,"spend_gbp":15429329,"commitment_cad":66719700,"spend_cad":27006106,"flags":0},
{"aid":"XM-DAC-46004-49013-002-LN3422","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Toktogul Rehabilitation Phase 3 Project","slug":"asdb-kg","status_code":2,"day_start":17148,"day_end":19538,"day_length":2390,"description":"The Asian Development Bank (ADB) financed the rehabilitation of the first two turbine-generator units and secondary electrical equipment of the largest and most important power plant in the Kyrgyz Republic under the Power Sector Rehabilitation Project (Phase 1) and the Toktogul Rehabilitation Phase 2 Project.  The proposed phase 3 project aims to (i) complete the rehabilitation of the Toktogul hydroelectric power plant (HPP) by replacing the two remaining turbine-generator units and refurbishing the civil structures of Toktogul dam, (ii) overhaul the dam monitoring systems at five dams along the Naryn cascade, (iii) continue the information campaign to educate the public on sector reforms, (iv) conduct corporate financial audits and business operation assessments of eight state-owned power and heat companies, and (v) implement a management modernization program for the power generation company.","commitment":60000000,"spend":18430578,"commitment_eur":56918228,"spend_eur":16839004,"commitment_gbp":48084064,"spend_gbp":14470034,"commitment_cad":80063640,"spend_cad":25069112,"flags":0},
{"aid":"XM-DAC-46004-49240-002-GRNT0643","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Uch-Kurgan Hydropower Plant Modernization Project","slug":"asdb-kg","status_code":2,"day_start":18201,"day_end":20269,"day_length":2068,"description":"The proposed project will replace ageing electrical and mechanical equipment for power generation and transmission at the Uch-Kurgan hydropower plant (HPP) in the Naryn River cascade and undertake silt and sedimentation removal which hinders the proper operation of hydromechanical equipment of the HPP. This will (i) increase the availability of clean hydropower for domestic use and potential export to Uzbekistan and Kazakhstan, (ii) enhance the integrity of hydromechanical structures and, ensure safe and optimal reservoir operation, and (iii) contribute to multiyear water supply management from the Naryn River cascade, which is essential for downstream agriculture mainly in Uzbekistan.","commitment":40000000,"spend":24754156,"commitment_eur":36194396,"spend_eur":21623374,"commitment_gbp":31042764,"spend_gbp":18526544,"commitment_cad":52952188,"spend_cad":33251044,"flags":0},
{"aid":"XM-DAC-46004-49240-002-LN3778","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Uch-Kurgan Hydropower Plant Modernization Project","slug":"asdb-kg","status_code":2,"day_start":18201,"day_end":20269,"day_length":2068,"description":"The proposed project will replace ageing electrical and mechanical equipment for power generation and transmission at the Uch-Kurgan hydropower plant (HPP) in the Naryn River cascade and undertake silt and sedimentation removal which hinders the proper operation of hydromechanical equipment of the HPP. This will (i) increase the availability of clean hydropower for domestic use and potential export to Uzbekistan and Kazakhstan, (ii) enhance the integrity of hydromechanical structures and, ensure safe and optimal reservoir operation, and (iii) contribute to multiyear water supply management from the Naryn River cascade, which is essential for downstream agriculture mainly in Uzbekistan.","commitment":60000000,"spend":34626652,"commitment_eur":54291592,"spend_eur":30195180,"commitment_gbp":46564144,"spend_gbp":25970872,"commitment_cad":79428280,"spend_cad":46871328,"flags":0},
{"aid":"XM-DAC-46004-50024-002-GRNT0552","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Skills for Inclusive Growth Sector Development Program","slug":"asdb-kg","status_code":3,"day_start":17513,"day_end":19030,"day_length":1517,"description":"The program is aligned with the following impact: government strategies to achieve inclusive growth through improved workforce skills and productivity in the country's key economic sectors, specifically the National Sustainable Development Strategy, 2013-2017; Education Development Strategy, 2012-2020; and the new Regional Policy of the Kyrgyz Republic 2018-2022.   The program will have the following outcome: an established market-responsive, entrepreneurial, and inclusive TVET system. The program includes three outputs: (i) TVET governance and finance strengthened, (ii) teaching quality and learning environments improved, and (iii) cooperation with industry increased and entrepreneurship skills developed.","commitment":12000000,"spend":20000000,"commitment_eur":10131068,"spend_eur":17527924,"commitment_gbp":8949079,"spend_gbp":14899213,"commitment_cad":15304619,"spend_cad":25447130,"flags":0},
{"aid":"XM-DAC-46004-50024-002-GRNT0553","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Skills for Inclusive Growth Sector Development Program","slug":"asdb-kg","status_code":3,"day_start":17513,"day_end":20194,"day_length":2681,"description":"The program is aligned with the following impact: government strategies to achieve inclusive growth through improved workforce skills and productivity in the country's key economic sectors, specifically the National Sustainable Development Strategy, 2013-2017; Education Development Strategy, 2012-2020; and the new Regional Policy of the Kyrgyz Republic 2018-2022.   The program will have the following outcome: an established market-responsive, entrepreneurial, and inclusive TVET system. The program includes three outputs: (i) TVET governance and finance strengthened, (ii) teaching quality and learning environments improved, and (iii) cooperation with industry increased and entrepreneurship skills developed.","commitment":18000000,"spend":11931689,"commitment_eur":15196601,"spend_eur":10867684,"commitment_gbp":13423619,"spend_gbp":9315767,"commitment_cad":22956928,"spend_cad":15455182,"flags":0},
{"aid":"XM-DAC-46004-50176-002-GRNT0628","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Wastewater Management Project","slug":"asdb-kg","status_code":2,"day_start":17893,"day_end":20269,"day_length":2376,"description":"The project will improve wastewater services in two lakeshore cities on Issyk-Kul lake, in the eastern region of the Kyrgyz Republic. It will upgrade and expand the existing wastewater systems, build institutional capacity, and strengthen the sustainability of the water supply and sanitation (WSS) utilities in Balykchy and Karakol.","commitment":12840000,"spend":8890750,"commitment_eur":11278649,"spend_eur":8011721,"commitment_gbp":10125398,"spend_gbp":6887256.5,"commitment_cad":17250698,"spend_cad":12052160,"flags":0},
{"aid":"XM-DAC-46004-50176-002-LN3742","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Wastewater Management Project","slug":"asdb-kg","status_code":2,"day_start":17893,"day_end":20269,"day_length":2376,"description":"The project will improve wastewater services in two lakeshore cities on Issyk-Kul lake, in the eastern region of the Kyrgyz Republic. It will upgrade and expand the existing wastewater systems, build institutional capacity, and strengthen the sustainability of the water supply and sanitation (WSS) utilities in Balykchy and Karakol.","commitment":23680000,"spend":19034436,"commitment_eur":20800498,"spend_eur":17261838,"commitment_gbp":18673632,"spend_gbp":14847782,"commitment_cad":31814370,"spend_cad":26047440,"flags":0},
{"aid":"XM-DAC-46004-51081-002-GRNT0632","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change and Disaster-Resilient Water Resources Sector Project","slug":"asdb-kg","status_code":2,"day_start":17896,"day_end":20361,"day_length":2465,"description":"The project will strengthen the climate change and disaster resilience of the water sector through: modernized and well-maintained infrastructure, enhanced agricultural and on-farm water management, and improved disaster risk management.  The project interventions will be both structural (including civil works and equipment) and non-structural (including capacity building and demonstration activities). The interventions will be focused in the Ferghana Valley in the southwest of the country and the Chui River Basin in the north of the country, which are vulnerable to flooding, landslides (including mudflows), and drought risks that are likely to be exacerbated by climate change.","commitment":16800000,"spend":13938443,"commitment_eur":14757110,"spend_eur":12309641,"commitment_gbp":13248185,"spend_gbp":10488532,"commitment_cad":22571006,"spend_cad":17736918,"flags":0},
{"aid":"XM-DAC-46004-51081-002-GRNT1041","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change and Disaster-Resilient Water Resources Sector Project","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22644,"day_length":2232,"description":"The project will strengthen the climate change and disaster resilience of the water sector through: modernized and well-maintained infrastructure, enhanced agricultural and on-farm water management, and improved disaster risk management. The project interventions will be both structural (including civil works and equipment) and non-structural (including capacity building and demonstration activities). The interventions will be focused in the Ferghana Valley in the southwest of the country and the Chui River Basin in the north of the country, which are vulnerable to flooding, landslides (including mudflows), and drought risks that are likely to be exacerbated by climate change.","commitment":27000000,"spend":0,"commitment_eur":23354880,"spend_eur":0,"commitment_gbp":20571726,"spend_gbp":0,"commitment_cad":37952036,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-51081-002-LN3746","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change and Disaster-Resilient Water Resources Sector Project","slug":"asdb-kg","status_code":2,"day_start":17896,"day_end":20361,"day_length":2465,"description":"The project will strengthen the climate change and disaster resilience of the water sector through: modernized and well-maintained infrastructure, enhanced agricultural and on-farm water management, and improved disaster risk management.  The project interventions will be both structural (including civil works and equipment) and non-structural (including capacity building and demonstration activities). The interventions will be focused in the Ferghana Valley in the southwest of the country and the Chui River Basin in the north of the country, which are vulnerable to flooding, landslides (including mudflows), and drought risks that are likely to be exacerbated by climate change.","commitment":21800000,"spend":21391406,"commitment_eur":19149108,"spend_eur":19594996,"commitment_gbp":17191098,"spend_gbp":16796428,"commitment_cad":29288568,"spend_cad":29065702,"flags":0},
{"aid":"XM-DAC-46004-51081-002-LN4646","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change and Disaster-Resilient Water Resources Sector Project","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22644,"day_length":2232,"description":"The project will strengthen the climate change and disaster resilience of the water sector through: modernized and well-maintained infrastructure, enhanced agricultural and on-farm water management, and improved disaster risk management. The project interventions will be both structural (including civil works and equipment) and non-structural (including capacity building and demonstration activities). The interventions will be focused in the Ferghana Valley in the southwest of the country and the Chui River Basin in the north of the country, which are vulnerable to flooding, landslides (including mudflows), and drought risks that are likely to be exacerbated by climate change.","commitment":20000000,"spend":0,"commitment_eur":17299910,"spend_eur":0,"commitment_gbp":15238315,"spend_gbp":0,"commitment_cad":28112618,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-51081-003-GRNT1041","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change- and Disaster-Resilient Water Resources Sector Project - Additional Financing","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22644,"day_length":2232,"description":"The proposed additional financing will expand the project's scope by (i) modernizing irrigation infrastructure, (ii) integrating automation systems, (iii) adopting advanced water management technologies, (iv) introducing nature-based solutions and watershed management planning, (v) enhancing early warning systems and precipitation monitoring, and (vi) strengthening institutional capacity for sustainable operations.","commitment":27000000,"spend":5475612,"commitment_eur":23354880,"spend_eur":4703433,"commitment_gbp":20571726,"spend_gbp":4100979.5,"commitment_cad":37952036,"spend_cad":7588728.5,"flags":0},
{"aid":"XM-DAC-46004-51081-003-LN4646","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate Change- and Disaster-Resilient Water Resources Sector Project - Additional Financing","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22644,"day_length":2232,"description":"The proposed additional financing will expand the project's scope by (i) modernizing irrigation infrastructure, (ii) integrating automation systems, (iii) adopting advanced water management technologies, (iv) introducing nature-based solutions and watershed management planning, (v) enhancing early warning systems and precipitation monitoring, and (vi) strengthening institutional capacity for sustainable operations.","commitment":20000000,"spend":0,"commitment_eur":17299910,"spend_eur":0,"commitment_gbp":15238315,"spend_gbp":0,"commitment_cad":28112618,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-51276-001-GRNT0925","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate-Resilient Agricultural Value Chain Development Project","slug":"asdb-kg","status_code":2,"day_start":19704,"day_end":21730,"day_length":2026,"description":"The proposed project will enhance food security, within households and nationally, through resilient, climate-adaptive horticultural value chains. The project will assist participating financial institutions (PFIs) to provide better-structured loan products to small and medium-sized agribusiness enterprises‚Äîincluding aggregators, collectors, processors, and export enterprises‚Äîfor horticulture products, including apple, apricot, cucumber, garlic, onion, pear, and potato. This will improve processing and storage capacity and reduce post-harvest handling and storage losses by establishing modern and efficient processing, storage, and refrigerated facilities. The project will also (i) establish contract farming arrangements between farmers and processors and/or exporters, (ii) promote climate-adaptive agronomic techniques and product-handling practices to reduce food losses, (iii) train women enterprise owners and/or managers in business management and entrepreneurship, (iv) implement measures to facilitate cross-border trade for the Kyrgyz Republic‚Äôs agricultural produce, (v) build the institutional capacity and governance of PFIs, and (vi) promote private sector participation. This will increase profitability for horticultural producers and agribusiness enterprises and strengthen market linkages to increase national food security.","commitment":20000000,"spend":11812704,"commitment_eur":18321492,"spend_eur":10180825,"commitment_gbp":15791392,"spend_gbp":8868110,"commitment_cad":26820466,"spend_cad":16407773,"flags":0},
{"aid":"XM-DAC-46004-51276-001-LN4413","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Climate-Resilient Agricultural Value Chain Development Project","slug":"asdb-kg","status_code":2,"day_start":19704,"day_end":21730,"day_length":2026,"description":"The proposed project will enhance food security, within households and nationally, through resilient, climate-adaptive horticultural value chains. The project will assist participating financial institutions (PFIs) to provide better-structured loan products to small and medium-sized agribusiness enterprises. This will improve processing and storage capacity and reduce post-harvest handling and storage losses by establishing modern and efficient processing, storage, and refrigerated facilities.","commitment":20000000,"spend":1530000,"commitment_eur":18321492,"spend_eur":1328458.9,"commitment_gbp":15791392,"spend_gbp":1128376.2,"commitment_cad":26820466,"spend_cad":2091694.5,"flags":0},
{"aid":"XM-DAC-46004-52225-001-GRNT0657","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Promoting Economic Diversification Program, Phase 1","slug":"asdb-kg","status_code":3,"day_start":18177,"day_end":18352,"day_length":175,"description":"Trade and investment competitiveness to develop non-mineral sector and diversify exports and investments improved.\n\nSME development to broaden the economic base and promote entrepreneurship improved.\n\nPublic private partnership to develop social and economic infrastructure improved.\n\nIndustry-linked skills development through enhanced internal efficiency and qualifications structure improved.","commitment":50000000,"spend":0,"commitment_eur":45236700,"spend_eur":0,"commitment_gbp":39588996,"spend_gbp":0,"commitment_cad":65952360,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-52225-003-GRNT0800","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Promoting Economic Diversification Program (Subprogram 2)","slug":"asdb-kg","status_code":3,"day_start":18904,"day_end":18992,"day_length":88,"description":"The program continues to support the implementation of reforms in the National Development Strategy of the Kyrgyz Republic for 2018-2040 (NDS 2040) and its overarching objective of gradually diversifying the Kyrgyz economy away from an over-reliance on gold production and exports (about 6%-10% of gross domestic product each year) and remittance-led consumption (about 30% of GDP). The program is a continuation of past reform support efforts from the Asian Development Bank (ADB) to the Government of Kyrgyz Republic on trade and investment competitiveness, small and medium-sized enterprise (SME) development, infrastructure development (including through public-private partnerships), and industry-based skills development. While the Kyrgyz Republic is still recovering from the coronavirus disease (COVID-19) pandemic outbreak that began in March 2020 and the severe economic and employment contraction and fiscal difficulties that was already underway, this program helps the government stay on the reform course, by (i) insulating the originally planned and needed medium-term reform efforts from the current crisis effects, (ii) while adding urgent reforms to improve the fiscal management (and buffers) and social protection mechanisms that have now been agreed to be crucial enablers of the original medium-term reform agenda.","commitment":10700000,"spend":10816808,"commitment_eur":9220337,"spend_eur":9566205,"commitment_gbp":7808804.5,"spend_gbp":8124476.5,"commitment_cad":13304730,"spend_cad":13863093,"flags":0},
{"aid":"XM-DAC-46004-52225-003-LN4114","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Promoting Economic Diversification Program (Subprogram 2)","slug":"asdb-kg","status_code":3,"day_start":18904,"day_end":18992,"day_length":88,"description":"The program continues to support the implementation of reforms in the National Development Strategy of the Kyrgyz Republic for 2018-2040 (NDS 2040) and its overarching objective of gradually diversifying the Kyrgyz economy away from an over-reliance on gold production and exports (about 6%-10% of gross domestic product each year) and remittance-led consumption (about 30% of GDP). The program is a continuation of past reform support efforts from the Asian Development Bank (ADB) to the Government of Kyrgyz Republic on trade and investment competitiveness, small and medium-sized enterprise (SME) development, infrastructure development (including through public-private partnerships), and industry-based skills development. While the Kyrgyz Republic is still recovering from the coronavirus disease (COVID-19) pandemic outbreak that began in March 2020 and the severe economic and employment contraction and fiscal difficulties that was already underway, this program helps the government stay on the reform course, by (i) insulating the originally planned and needed medium-term reform efforts from the current crisis effects, (ii) while adding urgent reforms to improve the fiscal management (and buffers) and social protection mechanisms that have now been agreed to be crucial enablers of the original medium-term reform agenda.","commitment":69300000,"spend":69300000,"commitment_eur":59716760,"spend_eur":61305992,"commitment_gbp":50574780,"spend_gbp":52051744,"commitment_cad":86169890,"spend_cad":88736136,"flags":0},
{"aid":"XM-DAC-46004-52225-004-GRNT0853","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Promoting Economic Diversification Program - Subprogram 3","slug":"asdb-kg","status_code":3,"day_start":19268,"day_end":19661,"day_length":393,"description":"Subprogram 3 is the final subprogram in a programmatic series that was approved in 2019 with the financing of $50 million for subprogram 1. The program was originally designed with two subprograms. However, in 2021, it was restructured resulting in an additional subprogram and a new reform area. The proposed subprogram 3 remains fully aligned with the original program outcome and outputs, which supports the implementation of the long-term National Development Strategy of the Kyrgyz Republic for 2018-2040 (NDS 2040) and, more recently, the medium-term National Development Program of the Kyrgyz Republic until 2026.\n\nThe government plans to accelerate its economic diversification efforts and has prioritized the implementation of structural reforms to improve (i) trade and investment competitiveness, (ii) small and medium-sized enterprises (SMEs) development, (iii) infrastructure development (including through public-private partnerships [PPPs]), (iv) industry-based skills development, and (v) fiscal management and social protection. These efforts will enable the economy and the population to be more resilient to exogenous shocks in the future and will help improve the economy's medium-to long-term trajectory. This subprogram will continue to support the government in implementing complex reforms against the backdrop of significant macroeconomic challenges and constitutional changes by ensuring that planned reform efforts are supported.  The government's overarching objective is to diversify the Kyrgyz economy away from over-reliance on gold production and remittance-led consumption. The scope and coverage of the program are even more important given the continuum of shocks to the economy that began in March 2020 with the onset of the coronavirus disease (COVID-19) pandemic, continued with post-pandemic disruptions in global supply chains in late 2021, and the Russian invasion of Ukraine in February 2022, which is adversely impacting the economy through increased food and fuel prices, lower remittances, fewer job opportunities, trade disruptions, and low investor confidence.","commitment":25000000,"spend":-24751628,"commitment_eur":25429410,"spend_eur":-23382686,"commitment_gbp":22137790,"spend_gbp":-20353138,"commitment_cad":34247880,"spend_cad":-33626268,"flags":0},
{"aid":"XM-DAC-46004-52225-004-LN4221","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Promoting Economic Diversification Program - Subprogram 3","slug":"asdb-kg","status_code":3,"day_start":19268,"day_end":19661,"day_length":393,"description":"Subprogram 3 is the final subprogram in a programmatic series that was approved in 2019 with the financing of $50 million for subprogram 1. The program was originally designed with two subprograms. However, in 2021, it was restructured resulting in an additional subprogram and a new reform area. The proposed subprogram 3 remains fully aligned with the original program outcome and outputs, which supports the implementation of the long-term National Development Strategy of the Kyrgyz Republic for 2018-2040 (NDS 2040) and, more recently, the medium-term National Development Program of the Kyrgyz Republic until 2026.\n\nThe government plans to accelerate its economic diversification efforts and has prioritized the implementation of structural reforms to improve (i) trade and investment competitiveness, (ii) small and medium-sized enterprises (SMEs) development, (iii) infrastructure development (including through public-private partnerships [PPPs]), (iv) industry-based skills development, and (v) fiscal management and social protection. These efforts will enable the economy and the population to be more resilient to exogenous shocks in the future and will help improve the economy's medium-to long-term trajectory. This subprogram will continue to support the government in implementing complex reforms against the backdrop of significant macroeconomic challenges and constitutional changes by ensuring that planned reform efforts are supported. The government's overarching objective is to diversify the Kyrgyz economy away from over-reliance on gold production and remittance-led consumption. The scope and coverage of the program are even more important given the continuum of shocks to the economy that began in March 2020 with the onset of the coronavirus disease (COVID-19) pandemic, continued with post-pandemic disruptions in global supply chains in late 2021, and the Russian invasion of Ukraine in February 2022, which is adversely impacting the economy through increased food and fuel prices, lower remittances, fewer job opportunities, trade disruptions, and low investor confidence.","commitment":25000000,"spend":25000000,"commitment_eur":25429410,"spend_eur":23596356,"commitment_gbp":22137790,"spend_gbp":20539462,"commitment_cad":34247880,"spend_cad":33971012,"flags":0},
{"aid":"XM-DAC-46004-52256-001-GRNT0676","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":18255,"day_end":21363,"day_length":3108,"description":"The ADB program will focus on RWSS provision for 42 villages in Naryn Oblast. The indicative program scope will include: (i) development and rehabilitation of water supply networks and related infrastructure; (ii) piloting of non-networked sanitation solutions; and (iii) establishment of sustainable operational models, including development of local capacity and community-based operational management.","commitment":13700000,"spend":8638557,"commitment_eur":12328379,"spend_eur":7697754.5,"commitment_gbp":10440471,"spend_gbp":6654116.5,"commitment_cad":18040622,"spend_cad":11820039,"flags":0},
{"aid":"XM-DAC-46004-52256-001-GRNT0971","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":20031,"day_end":21914,"day_length":1883,"description":"Naryn is a mountainous province and one of the poorest in the Kyrgyz Republic, with a poverty rate of 29% in 2017. Naryn's resident population was estimated at 287,000 in 2018 across Naryn township and 165 villages. In 2009, the urban population share was 15.3%. The ADB-supported Bishkek-Torugart road traverses through Naryn and connects Bishkek to the People's Republic of China (PRC), providing regional connectivity with Central Asian neighbors and opportunities for rural development. Most villages in Naryn have unprotected water sources. Incidences of waterborne diseases are high in Naryn. The program will cover 64,000 people in Naryn and will support the design, construction, and rehabilitation of WSS facilities; and institutional capacity to provide sustainable and safe WSS services across 31 program villages. In addition, the program will ensure that detailed designs are completed for 12 program villages and ready them for implementation when additional financing becomes available.\n\nThe RBL program's impacts will be (i) health and quality of life of residents improved and (ii) adverse environmental impacts reduced by 2026. The outcome will be inclusive and reliable access to safe WSS for rural communities in Naryn improved. Two outputs will contribute to the outcome:\n\n(i)Output 1: Water supply and sanitation infrastructure expanded and sanitation solutions piloted. The program will include the following infrastructure components: (a) safe water sources, water storage, and treatment and disinfection systems; (b) distribution networks for the target population of 64,000; (c) gender-sensitive safe water and sanitation facilities in selected kindergartens, schools, and health facilities; and (d) piloting of non-networked household sanitation solutions.\n\n(ii)Output 2: Institutional capacities strengthened for enhanced sustainability in the rural water supply services and sanitation subsector. Output 2 focuses on institutional measures to strengthen WSS systems and improve service delivery. It will (a) establish and strengthen WSUs and secure at least 20% female participation across all WSUs by 2025, and 40% female participation in WSU-related trainings and public consultations; (b) deliver financial management training to further enhance internal control processes and procedures for ARIS and WSUs; (c) adopt and apply a procurement manual and a multiyear procurement action plan; and (d) develop and implement an M&E framework to improve knowledge of asset inventory and data management.","commitment":0,"spend":0,"commitment_eur":0,"spend_eur":0,"commitment_gbp":0,"spend_gbp":0,"commitment_cad":0,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-52256-001-LN3854","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":18255,"day_end":21365,"day_length":3110,"description":"The ADB program will focus on RWSS provision for 42 villages in Naryn Oblast. The indicative program scope will include: (i) development and rehabilitation of water supply networks and related infrastructure; (ii) piloting of non-networked sanitation solutions; and (iii) establishment of sustainable operational models, including development of local capacity and community-based operational management.","commitment":13700000,"spend":10197268,"commitment_eur":12328379,"spend_eur":9343820,"commitment_gbp":10440471,"spend_gbp":8002285.5,"commitment_cad":18040622,"spend_cad":13952780,"flags":0},
{"aid":"XM-DAC-46004-52256-001-LN4494","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":20031,"day_end":21914,"day_length":1883,"description":"Naryn is a mountainous province and one of the poorest in the Kyrgyz Republic, with a poverty rate of 29% in 2017. Naryn's resident population was estimated at 287,000 in 2018 across Naryn township and 165 villages. In 2009, the urban population share was 15.3%. The ADB-supported Bishkek-Torugart road traverses through Naryn and connects Bishkek to the People's Republic of China (PRC), providing regional connectivity with Central Asian neighbors and opportunities for rural development. Most villages in Naryn have unprotected water sources. Incidences of waterborne diseases are high in Naryn. The program will cover 64,000 people in Naryn and will support the design, construction, and rehabilitation of WSS facilities; and institutional capacity to provide sustainable and safe WSS services across 31 program villages. In addition, the program will ensure that detailed designs are completed for 12 program villages and ready them for implementation when additional financing becomes available.\n\nThe RBL program's impacts will be (i) health and quality of life of residents improved and (ii) adverse environmental impacts reduced by 2026. The outcome will be inclusive and reliable access to safe WSS for rural communities in Naryn improved. Two outputs will contribute to the outcome:\n\n(i)Output 1: Water supply and sanitation infrastructure expanded and sanitation solutions piloted. The program will include the following infrastructure components: (a) safe water sources, water storage, and treatment and disinfection systems; (b) distribution networks for the target population of 64,000; (c) gender-sensitive safe water and sanitation facilities in selected kindergartens, schools, and health facilities; and (d) piloting of non-networked household sanitation solutions.\n\n(ii)Output 2: Institutional capacities strengthened for enhanced sustainability in the rural water supply services and sanitation subsector. Output 2 focuses on institutional measures to strengthen WSS systems and improve service delivery. It will (a) establish and strengthen WSUs and secure at least 20% female participation across all WSUs by 2025, and 40% female participation in WSU-related trainings and public consultations; (b) deliver financial management training to further enhance internal control processes and procedures for ARIS and WSUs; (c) adopt and apply a procurement manual and a multiyear procurement action plan; and (d) develop and implement an M&E framework to improve knowledge of asset inventory and data management.","commitment":0,"spend":0,"commitment_eur":0,"spend_eur":0,"commitment_gbp":0,"spend_gbp":0,"commitment_cad":0,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-52256-003-GRNT0001","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Multisector Activities Support Facility","slug":"asdb-kg","status_code":2,"day_start":18255,"day_end":20012,"day_length":1757,"description":"The facility will finance a series of small-value activities to support and complement larger projects financed by the Asian Development Bank (ADB) in the country. In particular, the facility will fund (i) project preparatory support for design and procurement readiness of ensuing projects; (ii) small pilot projects to demonstrate new technologies, international standards, and management approaches for potential scale-up under ensuing projects; (iii) project implementation support for ongoing ADB projects to ensure the efficient delivery of project outcomes; and (iv) capacity building and supplemental support for completed ADB projects in operation and maintenance (O&M), asset management, facility upgrading to meet critical needs, and post-disaster rehabilitation assistance.\n\nActivities under the facility will improve the efficiency, sustainability, responsiveness, and readiness of ADB-financed operations. They will contribute to the achievement of the outputs and outcomes of the linked ADB-financed projects. Each activity will be linked to a planned, ongoing, or completed ADB-financed project. Under the current CPS, priority sectors are agriculture, natural resources, and rural development; education; energy; public sector management; transport; and water and other urban infrastructure and services.\n\nThe following outputs will contribute to the achievement of the outputs and outcomes of the linked ADB-financed projects.\n\nOutput 1: Project implementation readiness for ensuing projects improved. The facility will support project preparation, design activities, and institutional strengthening for investments to be financed under one or more ensuing ADB-financed projects, including the Naryn Rural Water Supply and Sanitation Development Programthe country's first results-based lending operationplanned for 2019 approval.\n\nOutput 2: New technology, innovation, or improvement in design standards pilot-tested. The facility will support pilot-testing advanced technologies and management approaches to reduce life-cycle costs, improve service efficiency and quality, and minimize negative environmental and social impacts. Development of road asset management is an example of a new technology or management approaches activity under the facility.\n\nOutput 3: Project efficiency and sustainability enhanced. The facility will enhance project efficiency and sustainability, including capacity and implementation support for ongoing projects, post-disaster rehabilitation, O&M, and upgrading of completed infrastructure investments to conform with up-to-date performance standards.\n\nThe first activity to be financed under the facility and under Output 3 will enhance the sustainability of a completed ADB-financed investment in urban water project. It will support the physical upgrades of the chlorine neutralization unit at the Osh-Plotina water treatment plant, completed in September 2016 under the Emergency Assistance for Recovery and Construction project. The unit will be upgraded to a higher international standard and provide 400,000 people with access to safe and reliable water supply.","commitment":10000000,"spend":0,"commitment_eur":8998817,"spend_eur":0,"commitment_gbp":7620781.5,"spend_gbp":0,"commitment_cad":13168338,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-52256-006-GRNT0704","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Osh-Plotina Water Treatment Plant Chlorine Neutralization Unit","slug":"asdb-kg","status_code":3,"day_start":18583,"day_end":18897,"day_length":314,"description":"The first activity under the facility will support the physical upgrade of the chlorine neutralization unit at the Osh-Plotina WTP, completed in September 2016 under the Emergency Assistance for Recovery and Reconstruction project. The unit will be upgraded to a higher international standard and provide 400,000 people with access to safe and reliable water supply. The activity will improve the development impact and sustainability of the project.","commitment":500000,"spend":315829.62,"commitment_eur":422664.25,"spend_eur":265290.03,"commitment_gbp":378781.22,"spend_gbp":227826.2,"commitment_cad":653805.25,"spend_cad":396940.12,"flags":0},
{"aid":"XM-DAC-46004-52256-007-GRNT0783","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Naryn Program Readiness","slug":"asdb-kg","status_code":2,"day_start":18627,"day_end":20999,"day_length":2372,"description":"Activity 2 will support ADBs ongoing Naryn Rural Water Supply and Sanitation Development Program (the Naryn Program), which uses the results-based lending (RBL) modality, in the following areas: (i) component 1: recruitment of the independent verification agent (IVA) for the Naryn Program to validate the disbursement linked indicators (DLIs), and (ii) component 2: capacity development of the Naryn Programs executing and implementing agencies to support the overall program implementation and to achieve the program results framework. A consulting firm will be recruited for the IVA, while individual consultants will be engaged for the component 2 (implementation support to the Naryn Program). Activity 2 will also finance the consulting services of an independent external auditor to carry out the Naryn Program audit.","commitment":2500000,"spend":158059.84,"commitment_eur":2054980.4,"spend_eur":149209.08,"commitment_gbp":1864515,"spend_gbp":130708.85,"commitment_cad":3202402.8,"spend_cad":218668.55,"flags":0},
{"aid":"XM-DAC-46004-52256-008-GRNT0835","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Project Readiness for the Issyk-Kul Environmental Management and Sustainable Tourism Development","slug":"asdb-kg","status_code":3,"day_start":19192,"day_end":20377,"day_length":1185,"description":"SEFF Activity 3 for Project Readiness for the Issyk-Kul Environmental Management and Sustainable Tourism Development will finance project preparation activities for the Issyk-Kul Environmental Management and Sustainable Tourism Development Project (the Issyk-Kul project), namely: (i) the consulting services (firm) for the preparation of preliminary design and detailed engineering design (DED) for the Issyk-Kul project, and (ii) the consulting services (individual consultants) to support the project management unit (PMU) for the implementation of Activity 3 and the start-up activities of Issyk-Kul project (implementation support consultants).","commitment":1500000,"spend":1516344.5,"commitment_eur":1475526.2,"spend_eur":1413405,"commitment_gbp":1250774.6,"spend_gbp":1206967.4,"commitment_cad":1940713.8,"spend_cad":2083484.2,"flags":0},
{"aid":"XM-DAC-46004-52256-009-GRNT0913","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Almaty-Bishkek Economic Corridor Regional Improvement of Border Services Project Readiness","slug":"asdb-kg","status_code":2,"day_start":19675,"day_end":20088,"day_length":413,"description":"Activity 4, through the engagement of project management consultants and a design firm, will support the preparation of the detailed engineering design (DED) of the project facilities, procurement documents, and due diligence documents of the ensuing Almaty-Bishkek Economic Corridor Regional Improvement of Border Services Project (ABEC RIBS). This will enhance project readiness and improve the executing agency's capacity to implement the ensuing project.","commitment":800000,"spend":709165.75,"commitment_eur":740525.44,"spend_eur":638807.56,"commitment_gbp":644873.9,"spend_gbp":545566.94,"commitment_cad":1097001.2,"spend_cad":986026.3,"flags":0},
{"aid":"XM-DAC-46004-52256-010-GRNT0924","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"New Water Intake to the City of Osh","slug":"asdb-kg","status_code":2,"day_start":19797,"day_end":20452,"day_length":655,"description":"The activity under the facility will support the development of an additional water intake for the city of Osh. Existing intake was completed in September 2016 under the Emergency Assistance for Recovery and Reconstruction project, but was not enough to cope with the needed demand in clean and uninterrupted water supply during rainy season and related high water turbidity. The new water unit will be located upstream of the existing one, in a section of the river that will not be affected by the torrential rains that cause the water turbidity on the existing intake, provide 400,000 people with access to safe, clean and reliable water supply. The activity will improve the development impact and sustainability of the project.","commitment":3000000,"spend":2783999.2,"commitment_eur":2761022.2,"spend_eur":2575621,"commitment_gbp":2361105,"spend_gbp":2160204.8,"commitment_cad":4062149.2,"spend_cad":3906555.2,"flags":0},
{"aid":"XM-DAC-46004-52256-011-GRNT0941","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Enhancing climate-resilient ground water management approaches","slug":"asdb-kg","status_code":2,"day_start":19838,"day_end":20361,"day_length":523,"description":"The proposed sixth subgrant, Activity 6: Enhancing Climate-Resilient Ground Water Management Approaches, will reinvigorate on-farm ground water management approaches and improve service efficiency of the Water Resources Service (WRS), the executing agency (EA) of Activity 6. It is the same EA that is implementing the ongoing project L3746/G0632 Climate Change and Disaster-Resilient Water Resources Sector Project (the linked project). Due to significant decline of water resources, water from irrigation systems have become insufficient and its scarcity is exacerbated by climate change impacts. A decrease in summer precipitation by 10% and an increase in air temperature by 5C will increase crop water requirements by 15-20%, higher evaporation rates from surface water (especially during summer), and soil moisture depletion, which can lead to drought-like conditions. Shifts in the seasonal cropping season and increases in water use for agriculture may lead to crop failure when irrigation water demand is unmet due to changes in the amount of streamflow. Farmers at the lower end of irrigation schemes are experiencing frequent water shortages, affecting agricultural livelihoods. Because of the water scarcity, previously irrigated land becomes saline and inadequate, reducing agricultural productivity and causing displacement of rural population. A solution to address this shortage is to use ground water as an alternative reliable water source. The proposed project will increase climate and disaster resilience, water productivity and income of agricultural communities in four districts (Aravan, Nookat, Leilek and Panfilov) and contribute to addressing rural poverty. While the linked project focuses on surface water irrigation schemes, Activity 6 will enhance water availability by introducing sustainable use of groundwater resources and improved water efficiency on farms.","commitment":1884170,"spend":1784277.6,"commitment_eur":1756397.5,"spend_eur":1570924.4,"commitment_gbp":1504520.8,"spend_gbp":1345456,"commitment_cad":2576011.2,"spend_cad":2461720.5,"flags":0},
{"aid":"XM-DAC-46004-52256-012-GRNT0971","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Additional Financing for Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":20031,"day_end":21914,"day_length":1883,"description":"The Asian Development Bank (ADB) approved the Naryn Rural Water Supply and Sanitation Development Program (the ongoing results-based lending [RBL] program) on 8 November 2019, with a total ADB financing amount of $27.4 million. The ongoing RBL program aims to provide potable water and sanitation to 64,000 rural population and benefit 21 education and health facilities in Naryn province. The additional financing will scale up the existing scope of the ongoing RBL program to reach 100,000 people and 37 education and health facilities, while also supporting sector reform and climate change initiatives using the same financing modality.","commitment":5350000,"spend":1337500,"commitment_eur":5033572.5,"spend_eur":1149751.1,"commitment_gbp":4199327,"spend_gbp":1001771.7,"commitment_cad":7478172,"spend_cad":1871429.9,"flags":0},
{"aid":"XM-DAC-46004-52256-012-LN4494","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Additional Financing for Naryn Rural Water Supply and Sanitation Development Program","slug":"asdb-kg","status_code":2,"day_start":20031,"day_end":21914,"day_length":1883,"description":"The Asian Development Bank (ADB) approved the Naryn Rural Water Supply and Sanitation Development Program (the ongoing results-based lending [RBL] program) on 8 November 2019, with a total ADB financing amount of $27.4 million. The ongoing RBL program aims to provide potable water and sanitation to 64,000 rural population and benefit 21 education and health facilities in Naryn province. The additional financing will scale up the existing scope of the ongoing RBL program to reach 100,000 people and 37 education and health facilities, while also supporting sector reform and climate change initiatives using the same financing modality.","commitment":27000000,"spend":6750000,"commitment_eur":25403076,"spend_eur":5802482.5,"commitment_gbp":21192866,"spend_gbp":5055670,"commitment_cad":37740308,"spend_cad":9444599,"flags":0},
{"aid":"XM-DAC-46004-52337-001-GRNT0851","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"School Education Reform Sector Development Program","slug":"asdb-kg","status_code":2,"day_start":19559,"day_end":21365,"day_length":1806,"description":"The program is aligned with the following impact: Human capital that contributes to the country's development and economic growth strengthened. The program will have the following outcome: the ability of the school education system to prepare graduates with subject knowledge and competencies improved. Program and project components both support the following three outputs: Output 1: Quality and relevance of curricula with priority on interdisciplinary approaches improved. The policy-based program component under tranche one supported the government to (i) revise the state standard of general school education, and (ii) set up a regulatory framework for curriculum development. Under tranche two, the program will (iii) approve and roll out new 12-year subject curricula. The project component will help to (i) strengthen the capacity of MES staff and experts on textbook assessment, (ii) build the capacity of the curriculum developers (both institutions and individual experts), (iii) design and implement a step-by-step model for curriculum development review and approval, and (iv) revise the curricula for grades 612. Output 2: Quality of teaching improved. Under tranche one, the policy-based program component supported the government to (i) revise the teacher salary structure and increase teacher salaries; (ii) approve teacher professional standards; and (iii) revise pedagogical university education standards. Under tranche two, the program will (i) incorporate incentives into the teacher salary structure for better performance and continuous professional development, (ii) reform the INSETT system to allow universities to deliver INSETT, and (iii) introduce a fast-track teacher qualification program in universities to bring mid-career professionals into teaching. The project component will (i) help to upgrade pedagogical programs in universities to meet the revised standards and establish international partnerships, (ii) launch INSETT school management and instructional leadership training programs, and (iii) train 10,000 teachers to implement the revised curriculum in schools with a focus on language and STEM.Output 3: Network of Innovative schools strengthened. The policy-based program component supported the government to (i) expand the network of innovative school clusters nationwide (under tranche one); and (ii) provide innovative schools with a special status giving them administrative, academic, and financial autonomy (under tranche two). The project will (i) rehabilitate 23 innovative schools and KAE; (ii) upgrade the STEM and information and communication technology equipment of 23 new and 30 innovative schools, and provide laboratory equipment to 220 cluster schools; (iii) design and implement a training program on school management, instructional leadership, and communication for the school principals and deputy principals of innovative schools; and (iv) train innovative schools and district education managers on effective networking.","commitment":5000000,"spend":1104201.1,"commitment_eur":4518349,"spend_eur":999086.94,"commitment_gbp":3878489.5,"spend_gbp":848783.3,"commitment_cad":6607902,"spend_cad":1540530.1,"flags":0},
{"aid":"XM-DAC-46004-52337-001-GRNT0852","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"School Education Reform Sector Development Program","slug":"asdb-kg","status_code":2,"day_start":19559,"day_end":20453,"day_length":894,"description":"The program is aligned with the following impact: Human capital that contributes to the country's development and economic growth strengthened. The program will have the following outcome: the ability of the school education system to prepare graduates with subject knowledge and competencies improved. Program and project components both support the following three outputs: Output 1: Quality and relevance of curricula with priority on interdisciplinary approaches improved. The policy-based program component under tranche one supported the government to (i) revise the state standard of general school education, and (ii) set up a regulatory framework for curriculum development. Under tranche two, the program will (iii) approve and roll out new 12-year subject curricula. The project component will help to (i) strengthen the capacity of MES staff and experts on textbook assessment, (ii) build the capacity of the curriculum developers (both institutions and individual experts), (iii) design and implement a step-by-step model for curriculum development review and approval, and (iv) revise the curricula for grades 612. Output 2: Quality of teaching improved. Under tranche one, the policy-based program component supported the government to (i) revise the teacher salary structure and increase teacher salaries; (ii) approve teacher professional standards; and (iii) revise pedagogical university education standards. Under tranche two, the program will (i) incorporate incentives into the teacher salary structure for better performance and continuous professional development, (ii) reform the INSETT system to allow universities to deliver INSETT, and (iii) introduce a fast-track teacher qualification program in universities to bring mid-career professionals into teaching. The project component will (i) help to upgrade pedagogical programs in universities to meet the revised standards and establish international partnerships, (ii) launch INSETT school management and instructional leadership training programs, and (iii) train 10,000 teachers to implement the revised curriculum in schools with a focus on language and STEM.Output 3: Network of Innovative schools strengthened. The policy-based program component supported the government to (i) expand the network of innovative school clusters nationwide (under tranche one); and (ii) provide innovative schools with a special status giving them administrative, academic, and financial autonomy (under tranche two). The project will (i) rehabilitate 23 innovative schools and KAE; (ii) upgrade the STEM and information and communication technology equipment of 23 new and 30 innovative schools, and provide laboratory equipment to 220 cluster schools; (iii) design and implement a training program on school management, instructional leadership, and communication for the school principals and deputy principals of innovative schools; and (iv) train innovative schools and district education managers on effective networking.","commitment":15000000,"spend":6327140.5,"commitment_eur":13555047,"spend_eur":5681211.5,"commitment_gbp":11635469,"spend_gbp":4860001,"commitment_cad":19823706,"spend_cad":8668065,"flags":0},
{"aid":"XM-DAC-46004-52337-001-LN4217","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"School Education Reform Sector Development Program","slug":"asdb-kg","status_code":2,"day_start":19559,"day_end":21365,"day_length":1806,"description":"The program is aligned with the following impact: Human capital that contributes to the country's development and economic growth strengthened. The program will have the following outcome: the ability of the school education system to prepare graduates with subject knowledge and competencies improved. Program and project components both support the following three outputs: Output 1: Quality and relevance of curricula with priority on interdisciplinary approaches improved. The policy-based program component under tranche one supported the government to (i) revise the state standard of general school education, and (ii) set up a regulatory framework for curriculum development. Under tranche two, the program will (iii) approve and roll out new 12-year subject curricula. The project component will help to (i) strengthen the capacity of MES staff and experts on textbook assessment, (ii) build the capacity of the curriculum developers (both institutions and individual experts), (iii) design and implement a step-by-step model for curriculum development review and approval, and (iv) revise the curricula for grades 612. Output 2: Quality of teaching improved. Under tranche one, the policy-based program component supported the government to (i) revise the teacher salary structure and increase teacher salaries; (ii) approve teacher professional standards; and (iii) revise pedagogical university education standards. Under tranche two, the program will (i) incorporate incentives into the teacher salary structure for better performance and continuous professional development, (ii) reform the INSETT system to allow universities to deliver INSETT, and (iii) introduce a fast-track teacher qualification program in universities to bring mid-career professionals into teaching. The project component will (i) help to upgrade pedagogical programs in universities to meet the revised standards and establish international partnerships, (ii) launch INSETT school management and instructional leadership training programs, and (iii) train 10,000 teachers to implement the revised curriculum in schools with a focus on language and STEM.Output 3: Network of Innovative schools strengthened. The policy-based program component supported the government to (i) expand the network of innovative school clusters nationwide (under tranche one); and (ii) provide innovative schools with a special status giving them administrative, academic, and financial autonomy (under tranche two). The project will (i) rehabilitate 23 innovative schools and KAE; (ii) upgrade the STEM and information and communication technology equipment of 23 new and 30 innovative schools, and provide laboratory equipment to 220 cluster schools; (iii) design and implement a training program on school management, instructional leadership, and communication for the school principals and deputy principals of innovative schools; and (iv) train innovative schools and district education managers on effective networking.","commitment":20000000,"spend":7274083.5,"commitment_eur":18073396,"spend_eur":6292000,"commitment_gbp":15513958,"spend_gbp":5464324,"commitment_cad":26431608,"spend_cad":10070045,"flags":0},
{"aid":"XM-DAC-46004-53022-001-GRNT0793","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Landslide Risk Management Sector Project","slug":"asdb-kg","status_code":2,"day_start":18886,"day_end":21427,"day_length":2541,"description":"This project is ADB's first integrated preemptive landslide risk reduction investment to safeguard rural communities in the Kyrgyz Republic. This innovative project will embed international best practices and advanced technologies for improved risk reduction and monitoring. It will combine engineering and nature-based solutions with community-based planning and capacity building for sustainable long-term landslide safety. The project will reduce the risk to communities and infrastructure from landslide events by: (i) implementing landslide mitigation engineering measures, (ii) improving landslide monitoring systems, and (iii) strengthening capacity for landslide risk management.\n\nThe project is aligned with the following impacts: (i) human and material loss from climate- and geophysical-related disasters reduced, and (ii) level of protection of the population and territories from emergency situations increased for sustainable development. The project will have the following outcome: vulnerability and exposure of communities and infrastructure to landslide events reduced.","commitment":23500000,"spend":6833044.5,"commitment_eur":19971970,"spend_eur":6176390,"commitment_gbp":17108712,"spend_gbp":5301175,"commitment_cad":29774618,"spend_cad":9318577,"flags":0},
{"aid":"XM-DAC-46004-53022-001-LN4085","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Landslide Risk Management Sector Project","slug":"asdb-kg","status_code":2,"day_start":18886,"day_end":21427,"day_length":2541,"description":"This project is ADB's first integrated preemptive landslide risk reduction investment to safeguard rural communities in the Kyrgyz Republic. This innovative project will embed international best practices and advanced technologies for improved risk reduction and monitoring. It will combine engineering and nature-based solutions with community-based planning and capacity building for sustainable long-term landslide safety. The project will reduce the risk to communities and infrastructure from landslide events by: (i) implementing landslide mitigation engineering measures, (ii) improving landslide monitoring systems, and (iii) strengthening capacity for landslide risk management.\n\nThe project is aligned with the following impacts: (i) human and material loss from climate- and geophysical-related disasters reduced, and (ii) level of protection of the population and territories from emergency situations increased for sustainable development. The project will have the following outcome: vulnerability and exposure of communities and infrastructure to landslide events reduced.","commitment":11500000,"spend":3619801.8,"commitment_eur":9773517,"spend_eur":3156459.2,"commitment_gbp":8372348.5,"spend_gbp":2721345.8,"commitment_cad":14570558,"spend_cad":4979571,"flags":0},
{"aid":"XM-DAC-46004-53319-001-LN3898","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Rural Financial Inclusion for Women Project","slug":"asdb-kg","status_code":2,"day_start":18099,"day_end":null,"day_length":0,"description":"CJSC FINCA Bank decided not to proceed with the project due to impact of COVID-19 on the Kyrgyzstan economy and their ample liquidity.","commitment":5011000,"spend":0,"commitment_eur":4468165,"spend_eur":0,"commitment_gbp":4018768.8,"spend_gbp":0,"commitment_cad":6566551,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-54123-001-GRNT0808","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Urban Transport Electrification Project","slug":"asdb-kg","status_code":2,"day_start":18989,"day_end":20634,"day_length":1645,"description":"The proposed project will jumpstart a long-term transition towards a zero tailpipe-emission transport sector in the Kyrgyz Republic. It will comprise four interlinked outputs: (i) zero-emission tailpipe bus fleet in Bishkek municipality upgraded; (ii) bus depot infrastructure upgraded; (iii) pilot green mobility corridor established; and (iv) Bishkek bus operation sustainability improved. The project is economically justified by the reduced need for fossil fuel imports, vehicle operating cost savings, better air quality, and reduced carbon emissions, which will promote energy security, improve public health, and contribute to climate change mitigation. The project will also make Bishkek more livable and foster gender equity.","commitment":25000000,"spend":19566238,"commitment_eur":22116160,"spend_eur":17042758,"commitment_gbp":18777686,"spend_gbp":14856271,"commitment_cad":32011594,"spend_cad":27219118,"flags":0},
{"aid":"XM-DAC-46004-54123-001-LN4149","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Urban Transport Electrification Project","slug":"asdb-kg","status_code":2,"day_start":18989,"day_end":20634,"day_length":1645,"description":"The proposed project will jumpstart a long-term transition towards a zero tailpipe-emission transport sector in the Kyrgyz Republic. It will comprise four interlinked outputs: (i) zero-emission tailpipe bus fleet in Bishkek municipality upgraded; (ii) bus depot infrastructure upgraded; (iii) pilot green mobility corridor established; and (iv) Bishkek bus operation sustainability improved. The project is economically justified by the reduced need for fossil fuel imports, vehicle operating cost savings, better air quality, and reduced carbon emissions, which will promote energy security, improve public health, and contribute to climate change mitigation. The project will also make Bishkek more livable and foster gender equity.","commitment":25000000,"spend":20282216,"commitment_eur":22116160,"spend_eur":17676012,"commitment_gbp":18777686,"spend_gbp":15517672,"commitment_cad":32011594,"spend_cad":28254516,"flags":0},
{"aid":"XM-DAC-46004-54169-001-GRNT0699","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"COVID-19: Active Response and Expenditure Support Program","slug":"asdb-kg","status_code":3,"day_start":18387,"day_end":18627,"day_length":240,"description":"The Program will, in the short term, help the Government of Kyrgyz Republic mitigate the significant negative economic and fiscal impact of the coronavirus COVID-19 pandemic. The government's planned fiscal stimulus package will protect essential social services, while taking credible steps to contain the spread of the pandemic and to mitigate its impact on the population. The Program was developed in close coordination and consultation with the International Monetary Fund (IMF), which confirmed in its 2020 Debt Sustainability Analysis (DSA) that the country remains at moderate risk of debt distress, with some room for concessional borrowing.","commitment":25000000,"spend":25000000,"commitment_eur":22901672,"spend_eur":22901672,"commitment_gbp":20308494,"spend_gbp":20308494,"commitment_cad":34904616,"spend_cad":34904616,"flags":0},
{"aid":"XM-DAC-46004-54169-001-LN3913","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"COVID-19: Active Response and Expenditure Support Program","slug":"asdb-kg","status_code":3,"day_start":18387,"day_end":18627,"day_length":240,"description":"The Program will, in the short term, help the Government of Kyrgyz Republic mitigate the significant negative economic and fiscal impact of the coronavirus COVID-19 pandemic. The government's planned fiscal stimulus package will protect essential social services, while taking credible steps to contain the spread of the pandemic and to mitigate its impact on the population. The Program was developed in close coordination and consultation with the International Monetary Fund (IMF), which confirmed in its 2020 Debt Sustainability Analysis (DSA) that the country remains at moderate risk of debt distress, with some room for concessional borrowing.","commitment":25000000,"spend":25000000,"commitment_eur":22901672,"spend_eur":22213872,"commitment_gbp":20308494,"spend_gbp":19966990,"commitment_cad":34904616,"spend_cad":33876164,"flags":0},
{"aid":"XM-DAC-46004-54175-001-GRNT0705","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"COVID-19: Pandemic Emergency Project","slug":"asdb-kg","status_code":3,"day_start":18429,"day_end":19556,"day_length":1127,"description":"An emergency assistance loan and grant using streamlined procedures and the one ADB approach is an appropriate modality to respond to the COVID-19 crisis in the Kyrgyz Republic. ADB?s 2004 Disaster and Emergency Assistance Policy permits the use of emergency assistance loans and grants in response to health emergencies. The eligibility criteria for emergency assistance have been met as (i) the government has made an official request to ADB for assistance, (ii) the potential impact on economic, social, and governance needs and priorities have been identified, (iii) the event involves significant economic dislocation and the EAL addresses immediate needs (iv) the proposed emergency assistance addresses immediate needs, (v) the UN has not signaled substantial  security risks to staff, and (vi) local and development partners are sharing the response burden. The project is aligned with the following impact: Mitigate the impact of COVID-19 outbreak in Kyrgyzstan (Kyrgyz National Contingency Action Plan).  The project will have the following outcome: management of persons exposed with COVID-19 improved.","commitment":10000000,"spend":-356392.4,"commitment_eur":8885549,"spend_eur":-204149.56,"commitment_gbp":7986796,"spend_gbp":-198192.06,"commitment_cad":13550466,"spend_cad":-580163.94,"flags":0},
{"aid":"XM-DAC-46004-54175-001-LN3934","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"COVID-19: Pandemic Emergency Project","slug":"asdb-kg","status_code":3,"day_start":18429,"day_end":19556,"day_length":1127,"description":"The project is aligned with the following impact: Mitigate the impact of COVID-19 outbreak in Kyrgyzstan (Kyrgyz National Contingency Action Plan).","commitment":10000000,"spend":9794698,"commitment_eur":8885549,"spend_eur":9238912,"commitment_gbp":7986796,"spend_gbp":7959965,"commitment_cad":13550466,"spend_cad":12811141,"flags":0},
{"aid":"XM-DAC-46004-54439-001-GRNT1039","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Almaty‚ÄìBishkek Economic Corridor Regional Improvement of Border Services Project","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22095,"day_length":1683,"description":"The project scope entails the construction of three border crossing points (BCPs) at Ak-Tilek, Chui; Karkyra, Issyk-Kul; and Kichi-Kapka, Talas oblasts of the Kyrgyz Republic. The project is designed to address the border crossing transport and tourism constraints caused by (i) underdeveloped infrastructure and facilities of road BCPs, (ii) lack of modern border control technologies resulting in slow border control procedures, and (iii) lack of knowledge of and experience in using modern risk-based border control procedures and equipment by the border management agencies. While addressing these primary constraints, the project will concurrently help (i) enhance the climate resilience and environmental friendliness of the BCP infrastructure and cross-border transport operations, and (ii) reduce risks of human trafficking and improve the border-crossing experience for vulnerable travelers.","commitment":15684170,"spend":0,"commitment_eur":13566737,"spend_eur":0,"commitment_gbp":11950016,"spend_gbp":0,"commitment_cad":22046154,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-54439-001-LN4637","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Almaty‚ÄìBishkek Economic Corridor Regional Improvement of Border Services Project","slug":"asdb-kg","status_code":2,"day_start":20412,"day_end":22095,"day_length":1683,"description":"The project scope entails the construction of three border crossing points (BCPs) at Ak-Tilek, Chui; Karkyra, Issyk-Kul; and Kichi-Kapka, Talas oblasts of the Kyrgyz Republic. The project is designed to address the border crossing transport and tourism constraints caused by (i) underdeveloped infrastructure and facilities of road BCPs, (ii) lack of modern border control technologies resulting in slow border control procedures, and (iii) lack of knowledge of and experience in using modern risk-based border control procedures and equipment by the border management agencies. While addressing these primary constraints, the project will concurrently help (i) enhance the climate resilience and environmental friendliness of the BCP infrastructure and cross-border transport operations, and (ii) reduce risks of human trafficking and improve the border-crossing experience for vulnerable travelers.","commitment":15006155,"spend":0,"commitment_eur":12980257,"spend_eur":0,"commitment_gbp":11433426,"spend_gbp":0,"commitment_cad":21093116,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-55131-001-GRNT0847","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Strengthening Regional Health Security Project","slug":"asdb-kg","status_code":2,"day_start":19333,"day_end":21274,"day_length":1941,"description":"The proposed project follows the Asian Development Bank‚Äôs (ADB‚Äôs) COVID-19 emergency assistance and vaccine projects in the Kyrgyz Republic and ongoing regional support. 1 It will be part of a continuum of support to health sector building on good relations and policy dialogue built over the years. It contributes to regional health security (RHS) by improving health sector resilience to outbreaks of emerging and re-emerging infectious diseases in the country. The project addresses critical bottlenecks in RHS and the country‚Äôs International Health Regulations (IHR) compliance, namely diagnostic capacities and regional linkages of laboratories, and hospitals in busy border zones.\n\nThe project is aligned with the following impact: improved public health and regional health security in the Kyrgyz Republic.2 The project outcome is enhanced coverage of effective laboratory and border hospital services in Chui and Osh oblasts.","commitment":20000000,"spend":4261682,"commitment_eur":18877086,"spend_eur":3675869.8,"commitment_gbp":16431570,"spend_gbp":3199971.2,"commitment_cad":27176810,"spend_cad":5910973,"flags":0},
{"aid":"XM-DAC-46004-55131-001-LN4212","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Strengthening Regional Health Security Project","slug":"asdb-kg","status_code":2,"day_start":19333,"day_end":21274,"day_length":1941,"description":"The proposed project follows the Asian Development Bank‚Äôs (ADB‚Äôs) COVID-19 emergency assistance and vaccine projects in the Kyrgyz Republic and ongoing regional support. 1 It will be part of a continuum of support to health sector building on good relations and policy dialogue built over the years. It contributes to regional health security (RHS) by improving health sector resilience to outbreaks of emerging and re-emerging infectious diseases in the country. The project addresses critical bottlenecks in RHS and the country‚Äôs International Health Regulations (IHR) compliance, namely diagnostic capacities and regional linkages of laboratories, and hospitals in busy border zones.\n\nThe project is aligned with the following impact: improved public health and regional health security in the Kyrgyz Republic.2 The project outcome is enhanced coverage of effective laboratory and border hospital services in Chui and Osh oblasts.","commitment":10000000,"spend":2669085,"commitment_eur":9438543,"spend_eur":2320719,"commitment_gbp":8215785,"spend_gbp":2009895.4,"commitment_cad":13588405,"spend_cad":3698001.8,"flags":0},
{"aid":"XM-DAC-46004-55250-001-GRNT0949","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Environmental Management and Sustainable Tourism Development Project","slug":"asdb-kg","status_code":2,"day_start":19908,"day_end":22279,"day_length":2371,"description":"The project will (i) strengthen the quality and sustainability of tourism infrastructure in Cholpon-Ata and enhance livability by developing green, climate-resilient, safe, and inclusive spaces, including universal access for people with disabilities and older people; (ii) improve the environmental and health conditions of Issyk-Kul District by ensuring that the wastewater generated in Cholpon-Ata is adequately treated to protect the Issyk-Kul biosphere; and (iii) provide planning and capacity building support to the Cholpon-Ata Mayor's Office to ensure sound tourism management, and to Cholpon-Ata Vodokanal to improve the quality and reliability of wastewater management services to both residents and tourists. The project will contribute to a more sustainable, balanced, and diversified economic development in the overall area of Issyk-Kul Lake and AlmatyBishkek Economic Corridor (ABEC).","commitment":31000000,"spend":6097732.5,"commitment_eur":28581984,"spend_eur":5329652,"commitment_gbp":24097180,"spend_gbp":4599693,"commitment_cad":42524628,"spend_cad":8513862,"flags":0},
{"aid":"XM-DAC-46004-55250-001-LN4454","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Environmental Management and Sustainable Tourism Development Project","slug":"asdb-kg","status_code":2,"day_start":19908,"day_end":22279,"day_length":2371,"description":"The project will (i) strengthen the quality and sustainability of tourism infrastructure in Cholpon-Ata and enhance livability by developing green, climate-resilient, safe, and inclusive spaces, including universal access for people with disabilities and older people; (ii) improve the environmental and health conditions of Issyk-Kul District by ensuring that the wastewater generated in Cholpon-Ata is adequately treated to protect the Issyk-Kul biosphere; and (iii) provide planning and capacity building support to the Cholpon-Ata Mayor's Office to ensure sound tourism management, and to Cholpon-Ata Vodokanal to improve the quality and reliability of wastewater management services to both residents and tourists. The project will contribute to a more sustainable, balanced, and diversified economic development in the overall area of Issyk-Kul Lake and AlmatyBishkek Economic Corridor (ABEC).","commitment":25000000,"spend":2970659.5,"commitment_eur":23049988,"spend_eur":2551063.2,"commitment_gbp":19433210,"spend_gbp":2219747.5,"commitment_cad":34294056,"spend_cad":4103964.5,"flags":0},
{"aid":"XM-DAC-46004-56005-001-LN4336","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Kompanion Bank Supporting Micro and Small Entrepreneurs Project","slug":"asdb-kg","status_code":2,"day_start":19688,"day_end":null,"day_length":0,"description":"In Kyrgyzstan, micro, small, and medium-sized enterprises (MSMEs) account a large portion of GDP and exports. However, their access to finance remains limited, with an estimated finance gap of more than $1.4 billion. Most banks, which are the major providers of capital in the country, consider MSME lending as high risk. In addition, women entrepreneurs face significant challenges in accessing financial services and credit. ADB`s loan is expected to provide medium-term local currency funding to Kompanion Bank, whose ability to access such funds has been constrained by the country`s low finance sector development, including the absence of a developed capital market. ADB structured the PSW grant to decrease ADB`s cost recovery loan margin to address affordability constraints. Kompanion Bank will use the loan proceeds to lend to eligible micro and small enterprises (at least 40% channeled to MSMEs led or owned by women). ADB will work with Kompanion Bank to expand access to credit for women and extend the coverage of nonfinancial services to support women entrepreneurship. ADB's support aims to contribute to empowering women and promoting inclusive economic growth.\n\nADB estimates the nominal grant element of PSW support to be 4% of the project cost of $5,000,000. This estimate is based on the difference between (i) a reference price (either a market price if available; the price calculated using ADB`s pricing model, which comprises three main elements: risk, cost, and profit; or a negotiated price) and (ii) the concessional price being charged by PSW.\n\nADB sized the PSW grant (loan guarantee solution) to cover a sufficiently large portion of ADB`s loan such that the credit profile of the transaction was equivalent to what it would have been prior to the Russian invasion of Ukraine.","commitment":4739592,"spend":0,"commitment_eur":4387235.5,"spend_eur":0,"commitment_gbp":3820548.8,"spend_gbp":0,"commitment_cad":6499173,"spend_cad":0,"flags":0},
{"aid":"XM-DAC-46004-56146-001-GRNT0965","reporting":"Asian Development Bank","reporting_ref":"XM-DAC-46004","funder_ref":"XM-DAC-46004","title":"Issyk-Kul Ring Road Improvement Project (Barskoon‚ÄìKarakol Section)","slug":"asdb-kg","status_code":2,"day_start":20031,"day_end":23375,"day_length":3344,"description":"The Issyk-Kul Ring Road Improvement Project will: (i) improve the 79-kilometer Barskoon-Karakol road, a part of the Issyk-Kul Ring Road, (ii) enhance the management of the road asset, (iii) improve road safety, and (iv) support the preparation of the climate strategy and action plan. The project derives synergies with earlier assistance and adopts a cross-sectoral approach to integrated development in the Issyk-Kul Lake area, with an integration of gender perspective.","commitment":22500000,"spend":8316409.5,"commitment_eur":21169230,"spend_eur":7157108.5,"commitment_gbp":17660722,"spend_gbp":6192351.5,"commitment_cad":31450256,"spend_cad":11461748,"flags":0}],
"count":100,"readonly":"PGRO","time":0.018,"dquery":"http://d-portal.org/dquery#%20SELECT%20%20aid%20%20,%20%20reporting%20%20,%20%20reporting_ref%20%20,%20%20funder_ref%20%20,%20%20title%20%20,%20%20slug%20%20,%20%20status_code%20%20,%20%20day_start%20%20,%20%20day_end%20%20,%20%20day_length%20%20,%20%20description%20%20,%20%20commitment%20%20,%20%20spend%20%20,%20%20commitment_eur%20%20,%20%20spend_eur%20%20,%20%20commitment_gbp%20%20,%20%20spend_gbp%20%20,%20%20commitment_cad%20%20,%20%20spend_cad%20%20,%20%20flags%20%20FROM%20act%20%20JOIN%20country%20USING%20(aid)%20%20WHERE%20%20reporting_ref%20=%20'XM-DAC-46004'%20%20AND%20%20country_code%20=%20'KG'%20%20LIMIT%20100%20"}