ACTIVITY TITLE
Enhancing Safety, Security, and Sustainability of Apia Port Project
Reported by
Asian Development Bank XM-DAC-46004 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Single location 8 Multilateral (inflows) 2
Project-type interventions C01
Standard grant 110 ODA 10 Untied 1
Planned start date 2018-05-31
Planned end date 2021-12-31
Actual start date 2018-05-17
Actual end date 2022-03-08
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 2 )
PARTICIPATING ORG REFERENCE ROLE TYPE
Asian Development Bank
Accountable Multilateral
Ministry of Finance
Implementing Government
DESCRIPTION
The project delivers 4 key outputs: 1. Safety and capacity of port infrastructure enhanced. The project will upgrade the port terminal to enhance capacity and bring it to safe operating standards by procuring tugboats and implementing a wave-monitoring system. 2. Preparedness and resilience of port operations to climate change and natural hazards enhanced. The project will reconstruct the breakwater and repair damaged areas in the port by upgrading associated infrastructure, such as lighting, for port users' safe use of the Apia port and container handling. 3. Border security and trade facilitation capacity enhanced. The project will procure a new container x-ray scanner, which will be installed in the new customs examination facility to be financed under the project. 4. Gender-sensitive green port initiatives (GPIs) piloted. The project will deliver a gender-sensitive green port policy and will pilot at least three gender-sensitive GPIs. Green port practices will be mainstreamed into the operation of the Samoa Port Authority.
policy marker( 3 )
CODELIST SIGNIFICANCE VOCABULARY DESCRIPTION
Environmentally sustainable growth Inclusive economic growth Regional integration
CODE ENVIRONMENTALLY SUSTAINABLE GROWTH INCLUSIVE ECONOMIC GROWTH REGIONAL INTEGRATION
Reporting Organisation No description provided
Gender Equity and Mainstreaming Governance and capacity development
CODE GENDER EQUITY AND MAINSTREAMING GOVERNANCE AND CAPACITY DEVELOPMENT
Reporting Organisation No description provided
Some gender elements (SGE)
CODE SOME GENDER ELEMENTS (SGE)
Reporting Organisation No description provided
recipient country ( 1 )
SamoaWS
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Apia Harbour Beacon (historical)
ID 11612095 (Geonames)
-13.82609 -171.76182 Activity Approximate
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Water transport21040
100
GLOSSARY
Water transportHarbours and docks, harbour guidance systems, ships and boats; river and other inland water transport, inland barges and vessels.
capital spend
The percentage of the total commitment that is for capital spending
100
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 47 )
Outgoing Commitment
Disbursement
Transactions ( 48 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-05-17
Asian Development Bank
Multilateral
Ministry of Finance
Government
3,000,000
USD
Outgoing Commitment
Disbursement ( 47 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-05-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-06-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-07-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-08-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-09-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-10-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-11-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2018-12-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-01-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-02-28
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-03-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-04-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-05-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-06-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-07-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-08-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-09-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-10-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-11-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2019-12-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-01-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-02-29
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-03-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-04-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-05-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-06-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-07-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-08-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-09-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-10-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-11-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2020-12-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-01-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-02-28
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-03-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-04-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-05-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-06-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-07-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-08-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-09-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-10-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-11-30
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2021-12-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2022-01-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2022-02-28
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
2022-03-31
Asian Development Bank
Multilateral
Ministry of Finance
Government
0
USD
Disbursement
result( 2 )
output( 1 )
outcome( 1 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
OutcomeResults of the activity that produce an effect on the overall communities or issues you serve. For example lower rate of infection after a vaccination programme.
Output
indicator( 12 )
Project Output/s
Output/s as listed by the project staff.
INDICATOR
Output 1 Indicator 1
Output: Border security and trade facilitation capacity enhanced. Indicator: Of which 6 are women Data Source: Post-completion report by trainer Actual value:
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
0
6
Not provided
N/A
2023-01-01 : 2023-12-31
INDICATOR
Output 1 Indicator 1
Output: Border security and trade facilitation capacity enhanced. Indicator: One new container x-ray scanner commissioned Achievement: 0 Progress/Status: The X-ray scanner arrived in Samoa on 19 March 2024. The X-ray building was handed over in June 2024 and officially opened in July 2024. The X-ray building and x-ray scanner are operational. Data Source: Progress report by PMU
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
0
1 0
0%
2029-01-01 : 2029-12-31
INDICATOR
Output 1 Indicator 2
Output: Border security and trade facilitation capacity enhanced. Indicator: 100% of MFR staff (38 staff) upskilled to manage effective border control, including the use of an x-ray scanner, with all women staff (6) attending Achievement: 0 Progress/Status: An X-ray radiation expert was mobilized on 22 February 2024, and he completed the training for six MCR staff in 2024. The specialist supported MCR in developing a radiation safety plan in 2025. The radiation safety plan was endorsed, per SPA's update during the mission in October 2025. Data Source: Post-completion report by trainer
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
0
38 0
0%
2029-01-01 : 2029-12-31
INDICATOR
Output 1 Indicator 2
Output: Border security and trade facilitation capacity enhanced. Indicator: Of which 32 are men Data Source: Post-completion report by trainer Actual value:
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
0
32
Not provided
N/A
2023-01-01 : 2023-12-31
INDICATOR
Output 2 Indicator 1
Output: Gender-sensitive green port initiatives piloted. Indicator: Gender-responsive green port policy delivery by SPA Achievement: Y Progress/Status: GPI consultant (Royal Haskoningdhv Nederland B.V.: RHDHV) mobilized. The consultant produced most of the selected green port initiatives in 2024, and the integration of the initiatives in the SPA's operation is under discussion. The discussion is being led by the Principal Green Port Officer, SPA recruited in January 2026. Data Source: Progress report by PMU Baseline year: 2019 Baseline value: Not applicable Baseline year: 2019 Baseline value: Not applicable Target year: 2029 Target value: Y Actual value: Y
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 2 Indicator 2
Output: Gender-sensitive green port initiatives piloted. Indicator: At least three new proposals to promote gender-responsive green port policy completed by SPA. Achievement: 3 Progress/Status: SPA accepted the gender action plan in April 2026. Data Source: Progress report by PMU Baseline year: 2019 Baseline value: Not applicable Baseline year: 2019 Baseline value: Not applicable Target year: 2029 Target value: 3 Actual value: 3
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 3 Indicator 1
Output: Preparedness and resilience of port operations to climate change and natural hazards enhanced. Indicator: 100 meters of existing breakwater reconstructed. Achievement: N Progress/Status: Currently, completion of CHEC's civil works at the breakwater site is expected in mid-July 2027. A one-year defect liability period will then follow. Data Source: Progress report by construction supervision consultants Baseline year: 2019 Baseline value: N Baseline year: 2019 Baseline value: N Target year: 2029 Target value: Y Actual value: N
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 3 Indicator 2
Output: Preparedness and resilience of port operations to climate change and natural hazards enhanced. Indicator: Gender-responsive multihazard disaster preparedness plan for Apia Port delivered. Achievement: N Progress/Status: SPA's gender action plan was accepted in April 2026. Data Source: PMU progress report Baseline year: 2019 Baseline value: N Baseline year: 2019 Baseline value: N Target year: 2029 Target value: Y Actual value: N
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 4 Indicator 1
Output: Safety and capacity of port infrastructure enhanced. Indicator: Container throughput capacity at Apia Port increases to 53,700 TEUs. Achievement: 29000 Progress/Status: The contract for civil works was awarded on 29 March 2021. Section 1 (X-ray scanner building, shelters, and pavements): Quality assurance (QA) documentation is expected to be completed in June 2026, due to the limited availability of QA-related records. Section 2 (Remaining terminal works): Handover is expected in June 2026 (electrical engineer's commissioning is expected in May 2026). Section 3 (Breakwater reconstruction): Completion is expected in mid-2027. The construction supervision consultant's monitoring is ongoing. Data Source: Progress report by construction supervision consultants
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
29000
53700 29000
0%
2029-01-01 : 2029-12-31
INDICATOR
Output 4 Indicator 2
Output: Safety and capacity of port infrastructure enhanced. Indicator: Wave monitoring system implemented. Achievement: N Progress/Status: Haskoning (GPI Consultant) has completed its deliverables. SPA has recruited the Principal Green Port Officer, who leads the institutionalization of the green port initiatives into SPA's operation system. Data Source: Progress report by construction supervision consultants Baseline year: 2019 Baseline value: Not applicable Baseline year: 2019 Baseline value: Not applicable Target year: 2029 Target value: Y Actual value: N
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 4 Indicator 3
Output: Safety and capacity of port infrastructure enhanced. Indicator: Two new tugboats delivered to replace tugboat that is past its design life. Achievement: 0 Progress/Status: A tugboat arrived in Samoa on 31 July 2022. The procurement of the second tugboat is ongoing, and the contract signing is expected in mid-May 2026. Data Source: PMU progress report Baseline year: 2019 Baseline value: Not applicable Baseline year: 2019 Baseline value: Not applicable Target year: 2029 Target value: 1 Actual value: 0
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
INDICATOR
Output 4 Indicator 4
Output: Safety and capacity of port infrastructure enhanced. Indicator: SPA gender audit and assessment completed with recommendations to increase number of women in the workplace, particularly in technical and management roles. Achievement: N Progress/Status: The GPI consultant submitted the gender action plan to SPA in February 2026. SPA accepted the plan on 12 April 2026. Data Source: PMU progress report Baseline year: 2019 Baseline value: N Baseline year: 2019 Baseline value: N Target year: 2029 Target value: Y Actual value: N
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
Outcome
indicator( 2 )
Project Outcome
Efficiency, safety, and environmental sustainability of Apia International Port improved.
INDICATOR
Indicator 1
Average time for imports to clear customs reduced from 38 hours in 2019 to 12 hours. Achievement: 38 Progress/Status: The information will be checked with MCR during the next mission in 2026. Data Source: Reports from MFR's Selectivity Committee
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2019
38
12 38
0%
2030-01-01 : 2030-12-31
INDICATOR
Indicator 2
Gender-responsive green port policy mainstreamed in port operations manuals. Achievement: N Progress/Status: SPA's gender action plan was accepted by SPA in April 2026. Data Source: SPA's Operations Manuals Base year: 2019 Baseline value: N
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Not provided
Not provided
N/A
2030-01-01 : 2030-12-31
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46004
Asian Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Fiduciary
Fiduciary The condition attached requires use of certain public financial management or public accountability measures by the recipient
Performance
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient