ACTIVITY TITLE
Ouganda - Projet Hydroélectrique d’Achwa II
Uganda - Achwa II Hydropower Plant
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard loan 421 Non-export credit OOF 21 Untied 1
Planned start date 2016-12-14
Planned end date 2022-06-30
Actual start date 2017-08-25
Actual end date 2022-06-30
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 2 )
PARTICIPATING ORG REFERENCE ROLE TYPE
African Development Bank
Funding Multilateral
Uganda Electricity Transmission Company Limited
Implementing Government
General
Achwa 2 will be the first HPP in Northern Uganda, an area that succumbed to rebel activity and has been underserved. The project involves the construction and operation of a 42MW run-of-the-river hydro power plant (Achwa 2 HPP) located on the banks of the Achwa River in the districts of Pader, Kitgum and Gulu in Uganda. A 14km access road, 5km of service roads and interconnection facilities to the grid substation will be built as part of the project scope. The Achwa 2 power plant will be interconnected via a 180 km transmission line to the Lira substation, which will be built by Uganda Electricity Transmission Company Limited (UETCL) outside the scope of the project. Developing hydro power potential will provide Uganda with relatively cheaper, sustainable energy to drive economic growth and development.
Le projet d’Achwa 2 est la première centrale hydroélectrique construite dans le nord de l’Ouganda, une région qui a succombé à l’activité des rebelles et a été mal desservie. Le projet porte sur la construction et l’exploitation d’une centrale hydroélectrique au fil de l’eau de 42 MW (centrale d’Achwa 2), située sur les rives du fleuve Achwa dans les districts de Pader, Kitgum et Gulu en Ouganda. Une route d’accès de 14 km, des voies de service de 5 km et des installations d’interconnexion au poste du réseau seront construites dans le cadre du projet. La centrale d’Achwa 2 sera interconnectée via une ligne de transport de 180 km au poste de Lira qui sera construit par Uganda Electricity Transmission Company Limited (UETCL) en dehors du cadre du projet. Le développement du potentiel hydroélectrique fournira à l’Ouganda une énergie durable et relativement moins coûteuse pour stimuler la croissance économique et le développement.
Target Groups
Ce projet bénéficiera principalement à "Uganda Electricity Transmission Company Limited (UETCL)", au Gouvernement et à la population de l'Ouganda.
This project will benefit mainly Uganda Electricity Transmission Company Limited (UETCL), the Government and the people of Uganda.
Objectives
Le projet a pour objectif de répondre à la demande croissante d’électricité en Ouganda, la nécessité de réduire le coût de l’électricité produite, et le besoin de fournir de l’énergie propre. Le projet offrira une source d’énergie abordable, à faible coût et respectueuse de l’environnement, qui remédiera aux pénuries d’électricité prévues et appuiera par conséquent la croissance économique ainsi que le développement social en Ouganda.
The project aims to meet the growing demand for electricity in Uganda, the need to reduce the cost of electricity produced, and the need to provide clean energy. The Project will provide affordable, low cost, environmentally friendly, which will address expected power shortfalls and thereby support economic growth as well as social development in Uganda.
recipient country ( 1 )
UgandaUG
100
LOCATION ( 2 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Achwa
ID 448275 (Global Admininistrative Unit Layers)
TYPE stream STM
2.53861 31.48333 Other Topographical Feature Approximate
Gulu District
ID 443331 (Geonames)
TYPE second-order administrative division ADM2
2.85604 32.43 Administrative Region Approximate
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
3.6.6
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Coal-fired electric power plants23320
100
GLOSSARY
Coal-fired electric power plantsThermal electric power plants that use coal as the energy source.
Financial Overview
Outgoing Commitment ( 1 )
Budget ( 4 )
Outgoing Commitment
Budget
Budget ( 4 )
START END TYPE STATUS VALUE
2017-08-25 2017-11-25 Original 3,488,274.21
XDR
2017-11-25 2018-02-25 Original 3,488,274.21
XDR
2018-02-25 2018-05-25 Original 3,488,274.21
XDR
2018-05-25 2018-08-25 Original 3,488,274.21
XDR
Budget
Transactions ( 1 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2017-08-25
FLOW OOF Withdrawn 20
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Bank
ARPE Limited
13,953,096.84
XDR
Outgoing Commitment
result( 10 )
output( 10 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
Output
indicator( 1 )
Access road constructed
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
38.0 19.0
50%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Annual energy output
INDICATOR
GWh
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
281.0 162.0
57%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Construction camp for the workers
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Yes yes
N/A
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Design, construction and operation of a turnkey Run-of-River hydropower plant (HPP) along the Achwa River
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Yes Yes
N/A
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Direct Jobs (Permanent)
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
0.0 99.0
0%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Direct Jobs (Temporary)
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
0.0 594.0
0%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Interconnection facilities to the grid substation
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Yes yes
N/A
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Length of interconnected 132kv transmission line
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
140.0 140.0
100%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Power capacity installed
INDICATOR
MW
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
42.0 42.0
100%
2016-01-01 : 2022-12-31
Output
indicator( 1 )
Service roads constructed
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
9.0 5.0
55%
2016-01-01 : 2022-12-31
African Development Bank
RDGE
Manners CHUMA
Portfolio Management Officer, PINS2
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided