ACTIVITY TITLE
Sao Tome and Principe - Project for the rehabilitation, reinforcement and expansion of transport networks and electricity distribution in Sao Tome (Electricity I)
Sao Tome et Principe - Projet de réhabilitation, de renforcement et d'extension des réseaux de transport et de distribution d'électricité à Sao Tomé (Electricité I)
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard loan 421 ODA 10 Untied 1
Planned start date 1993-11-24
Planned end date 2003-01-01
Actual start date 1994-05-11
Actual end date 2002-12-31
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 3 )
PARTICIPATING ORG REFERENCE ROLE TYPE
African Development Fund
Funding Multilateral
Entreprise d'état et électricité
Implementing Government
Government Of Sao Tome and Principe
Extending Government
Objectives
Le projet Electricité I vise la satisfaction des besoins en énergie électrique de la région de Sao Tome sur le plan sectoriel et, sur un plan plus spécifique, à la réhabilitation, au renforcement et à l'extension des réseaux de transport et de distribution d'électricité en vue de l'amélioration quantitative et qualitative de la fourniture d'énergie électrique d'une part et à l'amélioration des performances techniques, financières et administratives de l'EMAE, d'autre part.
The Electricity I project aims to meet the electricity needs of the Sao Tome region at the sectoral level and, more specifically, to rehabilitate, strengthen and extend the electricity transmission and distribution networks with a view to improving the quantity and quality of electricity supply on the one hand and to improving the technical, financial and administrative performance of the EMAE on the other hand.
Target Groups
Le projet bénéficiera directement aux opérateurs économiques et aux usagers particuliers; il aurait un impact positif sur les populations de la région de Sao Tome par l'amélioration des conditions de vie quotidienne.
The project will directly benefit economic operators and individual users and would have a positive impact on the populations of the Sao Tome region by improving daily living conditions.
General
Le projet de réhabilitation, de renforcement et d'extension des réseaux de transport et de distribution d'électricité à Sao Tomé, dénommé "Electricité 1", est un volet du Programme d'urgence de réhabilitation et de renforcement des infrastructures électriques (PURIE) de la République Démocratique de Sao Tome et Principe et du plan de restructuration technique, financière et commerciale de l’EMAE. Le PURIE a été défini dans le cadre de l'étude du schéma directeur du réseau électrique de Sao Tomé financée par la Banque européenne d’investissement (BEI). Le projet nécessite la mise en œuvre de travaux de construction, de montage et de branchements, et des prestations de services pour (i) l'ingénierie, le contrôle et la supervision des travaux, (ii) l'assistance technique à la comptabilité de l'entreprise et au département de distribution de l'électricité. Les résultats attendus sont 5 sous-stations 30/6 kV renforcées ou construites, 13 nouveaux postes de transformation MT/BT et 60 autres réhabilités et/ou renforcés, 15 km de lignes MT et 80 km de lignes BT installés et 4.110 branchements d'abonnés en BT. Sur le plan institutionnel, il est attendu la mise en place de la comptabilité analytique et le renforcement de la comptabilité générale ainsi que l'élaboration des procédures de maintenance et de consignes de sécurité d'exploitation.
The project for the rehabilitation, reinforcement and expansion of transport networks and electricity distribution in Sao Tome, referred to as "Electricity 1", is a facet of the Emergency Programme for the reinforcement of the electricity infrastructures (PURIE) of the Democratic Republic of Sao Tome and Principe and the plan for the technical, financial and commercial restructuring of EMAE. PURIE was defined on the basis of the study of the master plan of Sao Tome’s electricity network funded by the European Investment Bank. The project requires the implementation of construction, assembly and connection works, and the provision of services for (i) engineering, control and supervision of the works, (ii) technical assistance to the company's accounting and electricity distribution departments. The expected results are 5 30/6 kV substations reinforced or built, 13 new MV/LV transformer substations and 60 others rehabilitated and/or reinforced, 15 km of MV lines and 80 km of LV lines installed and 4,110 LV subscriber connections. At the institutional level, it is expected that cost accounting will be implemented and general accounting will be strengthened, as well as maintenance procedures and operational safety instructions will be developed.
recipient country ( 1 )
Sao Tome and PrincipeST
100
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
3.6.1
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Energy sector policy, planning and administration23111
100
GLOSSARY
Energy sector policy, planning and administrationNo description provided
Financial Overview
Outgoing Commitment ( 2 )
Disbursement ( 1 )
Interest Payment ( 1 )
Loan Repayment ( 1 )
Budget ( 34 )
Outgoing Commitment
Disbursement
Interest Payment
Loan Repayment
Budget
Budget ( 34 )
START END TYPE STATUS VALUE
1994-05-11 1994-08-11 Original 57,009.58
XDR
1994-08-11 1994-11-11 Original 57,009.58
XDR
1994-11-11 1995-02-11 Original 57,009.58
XDR
1995-02-11 1995-05-11 Original 57,009.58
XDR
1995-05-11 1995-08-11 Original 57,009.58
XDR
1995-08-11 1995-11-11 Original 57,009.58
XDR
1995-11-11 1996-02-11 Original 57,009.58
XDR
1996-02-11 1996-05-11 Original 57,009.58
XDR
1996-05-11 1996-08-11 Original 57,009.58
XDR
1996-08-11 1996-11-11 Original 57,009.58
XDR
1996-11-11 1997-02-11 Original 57,009.58
XDR
1997-02-11 1997-05-11 Original 57,009.58
XDR
1997-05-11 1997-08-11 Original 57,009.58
XDR
1997-08-11 1997-11-11 Original 57,009.58
XDR
1997-11-11 1998-02-11 Original 57,009.58
XDR
1998-02-11 1998-05-11 Original 57,009.58
XDR
1998-05-11 1998-08-11 Original 57,009.58
XDR
1998-08-11 1998-11-11 Original 57,009.58
XDR
1998-11-11 1999-02-11 Original 57,009.58
XDR
1999-02-11 1999-05-11 Original 57,009.58
XDR
1999-05-11 1999-08-11 Original 57,009.58
XDR
1999-08-11 1999-11-11 Original 57,009.58
XDR
1999-11-11 2000-02-11 Original 57,009.58
XDR
2000-02-11 2000-05-11 Original 57,009.58
XDR
2000-05-11 2000-08-11 Original 57,009.58
XDR
2000-08-11 2000-11-11 Original 57,009.58
XDR
2000-11-11 2001-02-11 Original 57,009.58
XDR
2001-02-11 2001-05-11 Original 57,009.58
XDR
2001-05-11 2001-08-11 Original 57,009.58
XDR
2001-08-11 2001-11-11 Original 57,009.58
XDR
2001-11-11 2002-02-11 Original 57,009.58
XDR
2002-02-11 2002-05-11 Original 57,009.58
XDR
2002-05-11 2002-08-11 Original 57,009.58
XDR
2002-08-11 2003-01-01 Original 57,009.58
XDR
Budget
Transactions ( 5 )
Outgoing Commitment ( 2 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
1994-05-11
REF 2100150000912
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERNEMNT DE SAO TOME & PRINcipe
1,938,325.72
XDR
1994-05-11
REF 1
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
Government Of Sao Tome and Principe
Government Of Sao Tome and Principe
405,000
XDR
Outgoing Commitment
Disbursement ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2009-12-31
Total Disbursement till end of 2009
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Entreprise d'état et électricité
2,234,332.16
XDR
Disbursement
Interest Payment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2009-12-31
Total Interest Repayment till end of 2009
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
98,146.96
XDR
Interest Payment
Loan Repayment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2009-03-31
Total Loan Repayment till end of 2009
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
2,234,332.16
XDR
Loan Repayment
African Development Bank
PESD2
Zakou AMADOU
Division Manager, PESD2
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Policy The condition attached requires a particular policy to be implemented by the recipient
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient