ACTIVITY TITLE
Burundi - Project to support the East African Nutritional Sciences Institute
Burundi - Projet d'appui au centre d'excellence sous-régional en sciences de la nutrition
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard grant 110 ODA 10 Untied 1
DOCUMENTS ( 35 )
Appraisal Report APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Appraisal Report APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL FR Summary information about contract Contract Expression of Interest APPLICATION/PDF EN Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender Expression of Interest APPLICATION/PDF FR Tender General Procurement Notice APPLICATION/PDF FR Tender Invitation for Bids APPLICATION/PDF FR Tender Activity TEXT/HTML FR Activity web page Activity TEXT/HTML FR Activity web page
Planned start date 2019-10-23
Planned end date 2026-12-31
Actual start date 2019-11-08
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 3 )
PARTICIPATING ORG REFERENCE ROLE TYPE
Government Of Burundi
Extending Government
Transition Support Facility
Funding Multilateral
UNIVERSITE DU BURUNDI
REF BI-COA-31
Implementing Government
General
Le Projet d’Appui au Centre d’Excellence sous régional en Sciences de la Nutrition (PA-EANSI) basé à Bujumbura, profitera à l’ensemble de région de la communauté est-africaine. Ce projet permettra de renforcer la sécurité nutritionnelle, contribuer au développement du capital humain et à la croissance économique du Burundi en particulier, et dans la région de la communauté est-africaine en général à travers l’amélioration de l’accès à une formation de haut niveau et une recherche de qualité en sciences de la nutrition. Sa mise en œuvre repose sur trois composantes à savoir: (i) l’appui institutionnel et pédagogique, (ii) l’appui au développement des infrastructures et (iii) la gestion de projet. Le projet sera exécuté sur une période de cinq (5) ans pour un coût total estimé à 6,791 millions d’UC. Les principales réalisations attendues sont: la formation en master en sciences de la nutrition de 150 étudiants, la formation en doctorat de 10 étudiants, des formations continues en nutrition dans les secteurs de la santé et l’agriculture. Les étudiants seront formés dans les cinq filières suivantes: (i) Nutrition Clinique, (ii) Nutrition et Santé Publique; (iii) Technologie Agroalimentaire, (iv) Qualité des Aliments, et (v) Sécurité Alimentaire et Changement climatique.
The Project to Support the East African Nutritional Sciences Institute (PA-EANSI) based in Bujumbura will benefit the entire region of the East African Community. The project will enhance nutrition security, contribute to the development of human capital and economic growth in Burundi in particular, and in the East African Community region in general, by improving access to high-level training and quality research in nutritional sciences. Its implementation builds on three components: (i) institutional and pedagogical support; (ii) support for infrastructure development; and (iii) project management. The project will be implemented over a period of five (5) years and will cost UA 6.791 million. The main expected outputs are: master's degree training in nutritional sciences for 150 students, doctoral training for 10 students and continuing education in nutrition inthe health and agriculture sectors. Students will be trained in the following areas: (i) clinical nutrition; (ii) nutrition and public health; (iii) agri-food technology; (iv) food quality; and (v) food security and climate change.
Objectives
Le projet PA-EANSI vise l’amélioration des compétences en nutrition au niveau stratégique. Ce projet contribuera en effet à renforcer la sécurité nutritionnelle par le biais du renforcement des capacités nécessaires à la transformation des aliments et le respect des normes de qualité ainsi que le développement du capital humain à travers le renforcement des capacités pour une meilleure prise en charge des cas de malnutrition, qui présente un coût économique et social élevé au Burundi.
The PA-EANSI project aims to improve nutrition skills at the strategic level. It will help to strengthen nutrition security through capacity building for food processing and compliance with quality standards, as well as human capital development through capacity building for better management of malnutrition, which has a high economic and social cost in Burundi.
Target Groups
Les bénéficiaires globaux du projet sont tout d’abord la population du Burundi estimée à environ 11 millions d’habitants, dont 50,22% de femmes et environ 29% d’enfants de moins de cinq ans qui sont les groupes les plus vulnérables. Les bénéficiaires directs sont les enseignants de la Faculté d’agronomie et de Bio-ingénierie (FABI) et de la Faculté de médecine (70), les futurs étudiants de l’EANSI en formation initiale ou continue (395 d’ici la fin du projet), soit un total de 465 bénéficiaires directs, dont au moins 130 seront des femmes. Les professionnels de la santé et de l’agriculture seront des cibles particulièrement visées pour les formations en master et doctorat. Pour illustration, le centre contribuera, d’ici 2047, à la formation d’un nombre minimum de 1200 nouveaux diplômés de niveau Master en nutrition et 150 PhD, sans comptabiliser les bénéficiaires des formations continues/qualifiantes. Le projet prendra en compte les besoins des femmes, hommes, jeunes, de toutes les classes d’âge et catégories sociales dans toutes leurs composantes. Les populations vulnérables du projet seront aussi prises en compte par rapport à l’accès aux formations à travers les bourses d’excellence combinées aussi au statut de vulnérabilité des candidats.
The overall beneficiaries of the project are primarily Burundi's population estimated at about 11 million, of which 50.22% are women and about 29% are children under five, who are the most vulnerable groups. The direct beneficiaries are Faculty of Agronomy and Bioengineering (FABI) and the teaching staff of the Faculty of the Medicine (70), future EANSI students undergoing initial or continuing training (395 by the end of the project), which adds up to a total of 465 direct beneficiaries, at least 130 of whom will be women. Health and agricultural professionals will be specifically targeted by the Master's and PhD training programmes. By 2047, the Centre is expected to contribute to the training of at least of 1,200 new Master's and 150 new PhD graduates in nutrition, not leaving out the beneficiaries of continuing/skills training. The project will take into account the needs of women, men and young people of all age brackets and social categories, with no exception. The vulnerable segments of the project area population will also be taken into account in terms of access to training through excellence scholarships combined with the candidates’ vulnerability status.
recipient country ( 1 )
BurundiBI
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Sanzu
ID 426644 (Geonames)
TYPE populated place PPL
-3.4236 30.0792 Populated Place Approximate
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
5.1.1
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Population policy and administrative management13010
100
GLOSSARY
Population policy and administrative managementPopulation/development policies; demographic research/analysis; reproductive health research; unspecified population activities. (Use purpose code 15190 for data on migration and refugees. Use code 13096 for census work, vital registration and migration data collection.)
Financial Overview
Outgoing Commitment ( 2 )
Disbursement ( 30 )
Budget ( 28 )
Outgoing Commitment
Disbursement
Budget
Budget ( 28 )
START END TYPE STATUS VALUE
2019-11-08 2020-02-08 Original 214,285.714286
XDR
2020-02-08 2020-05-08 Original 214,285.714286
XDR
2020-05-08 2020-08-08 Original 214,285.714286
XDR
2020-08-08 2020-11-08 Original 214,285.714286
XDR
2020-11-08 2021-02-08 Original 214,285.714286
XDR
2021-02-08 2021-05-08 Original 214,285.714286
XDR
2021-05-08 2021-08-08 Original 214,285.714286
XDR
2021-08-08 2021-11-08 Original 214,285.714286
XDR
2021-11-08 2022-02-08 Original 214,285.714286
XDR
2022-02-08 2022-05-08 Original 214,285.714286
XDR
2022-05-08 2022-08-08 Original 214,285.714286
XDR
2022-08-08 2022-11-08 Original 214,285.714286
XDR
2022-11-08 2023-02-08 Original 214,285.714286
XDR
2023-02-08 2023-05-08 Original 214,285.714286
XDR
2023-05-08 2023-08-08 Original 214,285.714286
XDR
2023-08-08 2023-11-08 Original 214,285.714286
XDR
2023-11-08 2024-02-08 Original 214,285.714286
XDR
2024-02-08 2024-05-08 Original 214,285.714286
XDR
2024-05-08 2024-08-08 Original 214,285.714286
XDR
2024-08-08 2024-11-08 Original 214,285.714286
XDR
2024-11-08 2025-02-08 Original 214,285.714286
XDR
2025-02-08 2025-05-08 Original 214,285.714286
XDR
2025-05-08 2025-08-08 Original 214,285.714286
XDR
2025-08-08 2025-11-08 Original 214,285.714286
XDR
2025-11-08 2026-02-08 Original 214,285.714286
XDR
2026-02-08 2026-05-08 Original 214,285.714286
XDR
2026-05-08 2026-08-08 Original 214,285.714286
XDR
2026-08-08 2026-12-31 Original 214,285.714286
XDR
Budget
Transactions ( 32 )
Outgoing Commitment ( 2 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2019-11-08
REF 5900155016060
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
Gouvernement du Burundi
6,000,000
XDR
2019-11-08
REF 1
FLOW ODA 10
STATUS Untied 5
Government Of Burundi
791,000
XDR
Outgoing Commitment
Disbursement ( 30 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2020-07-31
Total Disbursement in July of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
87,189.78
XDR
2021-04-15
Total Disbursement in April of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
215,772.8
XDR
2022-02-15
Total Disbursement in February of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
87,793.34
XDR
2022-05-31
Total Disbursement in May of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
223,705.07
XDR
2022-06-30
Total Disbursement in June of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
462,999.8
XDR
2022-09-30
Total Disbursement in September of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
476,767.64
XDR
2022-11-15
Total Disbursement in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
582,662.73
XDR
2022-11-30
Total Disbursement in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
431,390.86
XDR
2022-12-31
Total Disbursement in December of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
84,450.28
XDR
2023-02-15
Total Disbursement in February of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
157,405.1
XDR
2023-03-15
Total Disbursement in March of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
11,932.47
XDR
2023-04-15
Total Disbursement in April of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
285,548.61
XDR
2023-05-31
Total Disbursement in May of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
187,811.64
XDR
2023-06-30
Total Disbursement in June of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
47,726.55
XDR
2023-07-15
Total Disbursement in July of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
76,836.01
XDR
2023-08-15
Total Disbursement in August of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
553,285.2
XDR
2023-08-31
Total Disbursement in August of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
21,179.11
XDR
2023-09-15
Total Disbursement in September of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
11,362.56
XDR
2023-10-31
Total Disbursement in October of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
12,225.21
XDR
2023-11-30
Total Disbursement in November of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
47,623.58
XDR
2023-12-15
Total Disbursement in December of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
84,143.47
XDR
2024-01-31
Total Disbursement in January of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
95,806.94
XDR
2024-06-15
Total Disbursement in June of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
1,077,704.7
XDR
2024-08-31
Total Disbursement in August of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
483,736.48
XDR
2025-05-15
Total Disbursement in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
18,988.9
XDR
2025-06-30
Total Disbursement in June of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
335,580.78
XDR
2026-01-31
Total Disbursement in January of 2026
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
213,151.52
XDR
2026-03-15
Total Disbursement in March of 2026
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
34,813.9
XDR
2026-03-31
Total Disbursement in March of 2026
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
8,522.26
XDR
2026-04-30
Total Disbursement in April of 2026
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard grant 110
STATUS Untied 5
Transition Support Facility
UNIVERSITE DU BURUNDI
REF BI-COA-31
6,513.49
XDR
Disbursement
result( 21 )
output( 21 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
Output
indicator( 1 )
Bilingual teachers with the required English language proficiency level
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
80.0 30.0
37%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Cumulative number of young Master’s-level graduates in the new fields at the end of the project
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
150.0 36.0
24%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Entrepreneurship training module developed and validated for Master’s-level training
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of agribusiness enterprises with qualified quality control staff
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
4.0 5.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of annual audit reports approved by the Bank
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
5.0 2.0
40%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of beneficiaries of doctoral training
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
10.0 12.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of buildings rehabilitated at FABI; Ex-CNR and Faculty of Medicine are operational
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
3.0 3.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of curricula for training in fields pertaining to health and climate change
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
5.0 5.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of enterprises that have signed collaboration agreements for internshipsand research and development
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
5.0 2.0
40%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of half-yearly and quarterly progress reports
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
10.0 4.0
40%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of professionals offered continuing training
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
180.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of professionals offered continuing training - of which women
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
Not provided
90.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of research institutes collaborating with EANSI
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
6.0 3.0
50%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of research projects funded
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
12.0 16.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Number of Strategic Plans prepared and approved by the Government
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Nutrition qualification rate of the staff of the nutrition programme
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
80.0 30.0
37%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Percentage of EANSI laboratories equipped with functional training equipment
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
100.0 100.0
100%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Rate of increase of nutrition-trained staff of health facilities
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
40.0 15.0
37%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
The EANSI Library has batches of science books for training
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
7.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
The language laboratory is equipped with new academic booksfor various language levels
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
171.0 0.0
0%
2019-01-01 : 2025-12-31
Output
indicator( 1 )
Total number of Master’s-and PhD-level scholarship holders
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.0 1.0
100%
2019-01-01 : 2025-12-31
African Development Bank
COBI
Jean Claude NSABIMANA
Social Development Officer, AHHD1
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Policy The condition attached requires a particular policy to be implemented by the recipient
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient