ACTIVITY SCOPE | COLLABORATION TYPE | AID TYPE | FINANCE TYPE | FLOW TYPE | TIED STATUS | HIERARCHY |
---|---|---|---|---|---|---|
National 4 | Multilateral outflows 4 |
Project-type interventions C01
|
Standard grant 110 | ODA 10 | Untied | 2 |
PARTICIPATING ORG | REFERENCE | ROLE | TYPE |
---|---|---|---|
Global Environment Fund Truste
|
REF XM-DAC-47044
|
Funding | Multilateral |
MINISTRY OF PLANNING AND DEVEL
|
REF 03025
|
Implementing | Government |
DESCRIPTION | CODE | VOCABULARY |
---|---|---|
By 2030, double the global rate of improvement in energy efficiency | 7.3 | UN Sustainable Development Goals (SDG) Targets |
By 2030, enhance international cooperation to facilitate access to clean energy research and technology, including renewable energy, energy efficiency and advanced and cleaner fossil-fuel technology, and promote investment in energy infrastructure and clean energy technology | 7.A | UN Sustainable Development Goals (SDG) Targets |
By 2030, expand infrastructure and upgrade technology for supplying modern and sustainable energy services for all in developing countries, in particular least developed countries, small island developing States and landlocked developing countries, in accordance with their respective programmes of support | 7.B | UN Sustainable Development Goals (SDG) Targets |
CODELIST | SIGNIFICANCE | VOCABULARY | DESCRIPTION |
---|---|---|---|
Gender Equality | significant objective | OECD DAC CRS | Significant (secondary) policy objectives are those which, although important, were not the prime motivation for undertaking the activity. |
NAME | DESCRIPTION | POSITION | CLASS | REACH | EXACTNESS |
---|---|---|---|---|---|
Port of Spain
REF TT
ID 3573890 (Geonames)
|
capital of a political entity
TYPE capital of a political entity
PPLC
|
10.66668 -61.51889 | Populated Place | Activity | Exact |
START | END | TYPE | STATUS | VALUE |
---|---|---|---|---|
2020-01-01 | 2020-12-31 | Revised | Committed | 14,808 USD |
2021-01-01 | 2021-12-31 | Revised | Committed | 885,469 USD |
2022-01-01 | 2022-12-31 | Revised | Committed | 1,331,575 USD |
2023-01-01 | 2023-12-31 | Revised | Committed | 2,217,502 USD |
2024-01-01 | 2024-12-31 | Revised | Committed | 1,182,712 USD |
2025-01-01 | 2025-12-31 | Revised | Committed | 684,859 USD |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2025-04-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
MINISTRY OF PLANNING AND DEVEL
REF 03025
Government
|
4,873,973 USD |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2020-12-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
14,808 USD |
|
2021-12-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
172,847 USD |
|
2022-12-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
1,097,023 USD |
|
2023-01-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
671 USD |
|
2023-02-28 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
55,332 USD |
|
2023-03-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
87,661 USD |
|
2023-04-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
120,771 USD |
|
2023-05-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
66,706 USD |
|
2023-06-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
594,821 USD |
|
2023-07-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
958,884 USD |
|
2023-08-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
42,656 USD |
|
2023-09-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
94,895 USD |
|
2023-10-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
47,903 USD |
|
2023-11-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
44,080 USD |
|
2023-12-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
48,075 USD |
|
2024-01-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
9,706 USD |
|
2024-02-29 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
37,036 USD |
|
2024-03-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
56,758 USD |
|
2024-04-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
13,654 USD |
|
2024-05-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
28,325 USD |
|
2024-06-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
60,456 USD |
|
2024-07-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
26,273 USD |
|
2024-08-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
96,203 USD |
|
2024-09-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
35,392 USD |
|
2024-10-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
49,764 USD |
|
2024-11-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
107,533 USD |
|
2024-12-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
199,204 USD |
|
2025-01-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
23,003 USD |
|
2025-02-28 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
23,991 USD |
|
2025-03-31 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
51,725 USD |
|
2025-04-30 |
CHANNEL Money is disbursed directly to the implementing institution and managed through a separate bank account 2
|
United Nations Development Programme
REF XM-DAC-41114
Multilateral
|
23,158 USD |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Qualitative | Qualitative | ||||
No dimension has been provided
No location has been provided
|
2020 Not provided
|
Not provided
|
Not provided
|
N/A |
2020-01-01 : 2020-12-31 |
Baseline comment
1) Zero GHG emissions (CO2 equivalent) avoided prior to the investment period of the project.
2) Zero GWh (equivalent to 3.6 million mega joules) of energy saved prior to the project investment.
3) One-hundred and forty-five direct project beneficiaries disaggregated by gender as co-benefit of GEF investment prior to the project implementation period Men:100 (69%), Women:45 (31%).
4) Zero women participating in leadership positions for the execution of the pilot projects.
5) Zero regulations and codes-of-practice for DCS and CCHP published by the T&T Government before project investment period.
6) Three Standards & Labelling (S&L) regulations for RAC technologies developed, approved and ready for enforcement by the T&T Bureau of Standards (TTBS) prior to the project investment period.
7) Zero trained professionals and technicians directly linked to the project execution to sustainable RAC technologies and the reduction of GHG emissions.
8) Zero financial and market mechanisms for the development of low-carbon RAC technologies prior to the project implementation period.
9) No private sector capital investment mobilized prior to the project.
10) Zero relevant EE and HCFCC/HFC emission indicators integrated into the national MRV system implemented by the MPD and reported to the UNFCCC and the Montreal Protocol, prior to the project implementation period.
11) Zero percent of project expenditure spent on the MSP planned activities. |
|||||
Target comment
Not Applicable- Project initiated in Q4 2020 |
|||||
Actual comment
Not Applicable- Project initiated in Q4 2020 |
|||||
No dimension has been provided
No location has been provided
|
2020 Not provided
|
Not provided
|
Not provided
|
N/A |
2021-01-01 : 2021-12-31 |
Baseline comment
1) Zero GHG emissions (CO2 equivalent) avoided prior to the investment period of the project.
2) Zero GWh (equivalent to 3.6 million mega joules) of energy saved prior to the project investment.
3) One-hundred and forty-five direct project beneficiaries disaggregated by gender as co-benefit of GEF investment prior to the project implementation period Men:100 (69%), Women:45 (31%).
4) Zero women participating in leadership positions for the execution of the pilot projects.
5) Zero regulations and codes-of-practice for DCS and CCHP published by the T&T Government before project investment period.
6) Three Standards & Labelling (S&L) regulations for RAC technologies developed, approved and ready for enforcement by the T&T Bureau of Standards (TTBS) prior to the project investment period.
7) Zero trained professionals and technicians directly linked to the project execution to sustainable RAC technologies and the reduction of GHG emissions.
8) Zero financial and market mechanisms for the development of low-carbon RAC technologies prior to the project implementation period.
9) No private sector capital investment mobilized prior to the project.
10) Zero relevant EE and HCFCC/HFC emission indicators integrated into the national MRV system implemented by the MPD and reported to the UNFCCC and the Montreal Protocol, prior to the project implementation period.
11) Zero percent of project expenditure spent on the MSP planned activities. |
|||||
Target comment
6) 1;
7) 15; |
|||||
Actual comment
6) 1;
7) 0; |
|||||
No dimension has been provided
No location has been provided
|
2020 Not provided
|
Not provided
|
Not provided
|
N/A |
2022-01-01 : 2022-12-31 |
Baseline comment
1) Zero GHG emissions (CO2 equivalent) avoided prior to the investment period of the project.
2) Zero GWh (equivalent to 3.6 million mega joules) of energy saved prior to the project investment.
3) One-hundred and forty-five direct project beneficiaries disaggregated by gender as co-benefit of GEF investment prior to the project implementation period Men:100 (69%), Women:45 (31%).
4) Zero women participating in leadership positions for the execution of the pilot projects.
5) Zero regulations and codes-of-practice for DCS and CCHP published by the T&T Government before project investment period.
6) Three Standards & Labelling (S&L) regulations for RAC technologies developed, approved and ready for enforcement by the T&T Bureau of Standards (TTBS) prior to the project investment period.
7) Zero trained professionals and technicians directly linked to the project execution to sustainable RAC technologies and the reduction of GHG emissions.
8) Zero financial and market mechanisms for the development of low-carbon RAC technologies prior to the project implementation period.
9) No private sector capital investment mobilized prior to the project.
10) Zero relevant EE and HCFCC/HFC emission indicators integrated into the national MRV system implemented by the MPD and reported to the UNFCCC and the Montreal Protocol, prior to the project implementation period.
11) Zero percent of project expenditure spent on the MSP planned activities. |
|||||
Target comment
4) 2;
7) 15; |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
1 | 2 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
2 | 2 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2020 0.01 |
75 | 79.2 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0.01 |
100 | 87 |
86%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
1 | 1 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
2 | 3 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
200000 | 145445 |
72%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
157000 | 227966 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
8 | 0.009 |
0%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
8 | 15.9 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
500000 | 100483.80 |
20%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
750000 | 918285 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 45 |
75 | 177 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 45 |
100 | 197 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 100 |
150 | 339 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 100 |
150 | 381 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
1 | 1 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
1 | 1 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 3 |
4 | 5 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 3 |
5 | 5 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
100 | 141 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
150 | 161 |
100%
|
2024-01-01 : 2024-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2020 0 |
4 | 10 |
100%
|
2023-01-01 : 2023-12-31 |
No dimension has been provided
No location has been provided
|
2020 0 |
5 | 10 |
100%
|
2024-01-01 : 2024-12-31 |
NARRATIVE | TYPE | DESCRIPTION |
---|---|---|
Consistent with the Article III of the SBAA [or the Supplemental Provisions to the Project Document], the responsibility for the safety and security of the Implementing Partner and its personnel and property, and of UNDP’s property in the Implementing Partner’s custody, rests with the Implementing Partner. To this end, the Implementing Partner shall: a) put in place an appropriate security plan and maintain the security plan, taking into account the security situation in the country where the project is being carried; b) assume all risks and liabilities related to the Implementing Partner’s security, and the full implementation of the security plan.
|
Policy | The condition attached requires a particular policy to be implemented by the recipient |
Social and environmental sustainability will be enhanced through application of the UNDP Social and Environmental Standards (http://www.undp.org/ses) and related Accountability Mechanism (http://www.undp.org/secu-srm).
|
Policy | The condition attached requires a particular policy to be implemented by the recipient |