ACTIVITY TITLE
Water Resources Management & Agro-ecological Transition for Cambodia - WAT4CAM
Reported by
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Regional 2 Bilateral 1
Project-type interventions C01
Standard grant 110 ODA 10 Untied 2
Planned start date 2018-12-17
Planned end date 2025-12-24
Actual start date 2018-12-24
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 4 )
PARTICIPATING ORG REFERENCE ROLE TYPE
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
Implementing
Directorate-General for International Partnerships
Extending Other Public Sector
European Commission
Funding Other Public Sector
Other public entities in donor country
Accountable
General

The project will support the RGCs national strategy, which identifies agriculture, climate change and integrated water management as key levers for poverty alleviation and growth. The main objective of this EU Grant is to bring more efficient and sustainable solutions to the sector in terms of central and local governance, capacity-building to farmers, development of cooperatives and civil society, market opportunities, climatic services.

tag( 4 )
DESCRIPTION CODE VOCABULARY
Goal 5. Achieve gender equality and empower all women and girls 5 UN Sustainable Development Goals (SDG)
Goal 8. Promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all 8 UN Sustainable Development Goals (SDG)
Goal 9. Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation 9 UN Sustainable Development Goals (SDG)
Goal 13. Take urgent action to combat climate change and its impacts 13 UN Sustainable Development Goals (SDG)
policy marker( 12 )
CODELIST SIGNIFICANCE VOCABULARY DESCRIPTION
Aid Targeting the Objectives of the Convention on Biological Diversity not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Aid Targeting the Objectives of the Convention to Combat Desertification not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Aid Targeting the Objectives of the Framework Convention on Climate Change - Adaptation principal objective OECD DAC CRS Principal (primary) policy objectives are those which can be identified as being fundamental in the design and impact of the activity and which are an explicit objective of the activity. They may be selected by answering the question "Would the activity have been undertaken without this objective?"
Aid Targeting the Objectives of the Framework Convention on Climate Change - Mitigation principal objective OECD DAC CRS Principal (primary) policy objectives are those which can be identified as being fundamental in the design and impact of the activity and which are an explicit objective of the activity. They may be selected by answering the question "Would the activity have been undertaken without this objective?"
Aid to Environment principal objective OECD DAC CRS Principal (primary) policy objectives are those which can be identified as being fundamental in the design and impact of the activity and which are an explicit objective of the activity. They may be selected by answering the question "Would the activity have been undertaken without this objective?"
Disability not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Disaster Risk Reduction(DRR) not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Gender Equality significant objective OECD DAC CRS Significant (secondary) policy objectives are those which, although important, were not the prime motivation for undertaking the activity.
Nutrition not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Participatory Development/Good Governance principal objective OECD DAC CRS Principal (primary) policy objectives are those which can be identified as being fundamental in the design and impact of the activity and which are an explicit objective of the activity. They may be selected by answering the question "Would the activity have been undertaken without this objective?"
Reproductive, Maternal, Newborn and Child Health (RMNCH) not targeted OECD DAC CRS The score "not targeted" means that the activity was examined but found not to target the policy objective.
Trade Development significant objective OECD DAC CRS Significant (secondary) policy objectives are those which, although important, were not the prime motivation for undertaking the activity.
recipient country ( 1 )
CambodiaKH
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
KH - Cambodia
Cambodia - Cambodia
13.5066394 104.869423 Activity
sector ( 2 )
OECD DAC CRS 5 digit1( 2 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Agricultural development31120
85
River basins development14040
15
GLOSSARY
Agricultural developmentIntegrated projects; farm development.
River basins developmentInfrastructure-focused integrated river basin projects and related institutional activities; river flow control; dams and reservoirs [excluding dams primarily for irrigation (31140) and hydropower (23220) and activities related to river transport (21040)].
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 5 )
Planned Disbursement ( 1 )
Budget ( 10 )
Outgoing Commitment
Disbursement
Planned Disbursement
Budget
Budget ( 10 )
START END TYPE STATUS VALUE
2025-03-01 2025-03-31 Original Indicative 0
EUR
2025-04-01 2025-04-30 Original Indicative 0
EUR
2025-05-01 2025-05-31 Original Indicative 0
EUR
2025-06-01 2025-06-30 Original Indicative 0
EUR
2025-07-01 2025-07-31 Original Indicative 0
EUR
2025-08-01 2025-08-31 Original Indicative 0
EUR
2025-09-01 2025-09-30 Original Indicative 0
EUR
2025-10-01 2025-10-31 Original Indicative 0
EUR
2025-11-01 2025-11-30 Original Indicative 0
EUR
2025-12-01 2025-12-31 Original Indicative 0
EUR
Budget
Planned Disbursement ( 1 )
START END TYPE PROVIDER RECEIVER VALUE
2025-04-01 2025-04-30 Original
European Commission - Directorate General for International Partnerships
Other Public Sector
Other public entities in donor country
1,200,000
EUR
Planned Disbursement
Transactions ( 6 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-12-17
REF XI-IATI-EC_INTPA-2018-PCC-398466-SCR.CTR.398466.01
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
11,800,000
EUR
Outgoing Commitment
Disbursement ( 5 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2019-01-17
REF XI-IATI-EC_INTPA-2018-PCC-398466-SI2.4288740
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
2,632,000
EUR
2021-06-25
REF XI-IATI-EC_INTPA-2018-PCC-398466-SI2.4585070
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
1,414,000
EUR
2022-07-15
REF XI-IATI-EC_INTPA-2018-PCC-398466-SI2.4703666
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
1,600,768
EUR
2023-07-22
REF XI-IATI-EC_INTPA-2018-PCC-398466-SI2.4840205
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
2,306,166
EUR
2024-06-19
REF XI-IATI-EC_INTPA-2018-PCC-398466-SI2.4965232
European Commission - Directorate General for International Partnerships
Other Public Sector
AGENCE FRANCAISE DE DEVELOPPEMENT
REF FR-3
1,716,944
EUR
Disbursement
result( 276 )
output( 186 )
outcome( 84 )
impact( 6 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
OutcomeResults of the activity that produce an effect on the overall communities or issues you serve. For example lower rate of infection after a vaccination programme.
ImpactThe long term effects of the outcomes, that lead to larger, over arching results, such as improved life-expectancy.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 116707
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205540
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205556
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 263924
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286385
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286401
INDICATOR
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
SO1.1.1 IDS and Preks area rehabilitated in the provinces of Battambang, Preah Vihear, Siem Reap, Kampong Thom, Kandal
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1. between 15000 and 20000 ha of IDS and Preks rehabilitated in the provinces of Preah Vihear Siem Reap Kampong Thom Kandal BattambangAverage 17500 ha
Actual comment
Civil work started for Kunghot AB 1965 haTender ongoing for O Kambor Sakarach 256 ha flood damaged repair of 3 irrigation schemes.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 116707
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205540
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205556
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 263924
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286385
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286401
INDICATOR
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
SO1.1.2. ESIA and IESIA (including an ESMP) reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.2.ESIAIESIA including an ESMP for each IDS or Preks
Actual comment
IESIA report validated Kunghot AB O Kambor Sakarach.Awaiting validation 6 Preks Cluster Kork Thlok Leu Krapeu main canal and Kunghot CD.
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 116707
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205540
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 205556
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 263924
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286385
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
SO1.1 Irrigation and Drainage schemes and Preks are rehabilitated in compliance with environmental and social requirements
REFERENCE
VOCAB 99
CODE 4286401
INDICATOR
SO1.1.3 ESMP implementation reports are available
SO1.1.3 ESMP implementation reports are available
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO1.1.3. Program execution reports systematically include a chapter on ESMP implementation
Actual comment
not yet due
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
SO2.1.1 O&M fund guidelines are finalized and submitted for approval
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft OM guidelines dated 2015
Target comment
SO2.1.1. OM fund guidelines finalized and submitted for adoption by midterm
Actual comment
Draft annexes of the OM Guidelines has been finalized and submitted to MoWRAM in September 2021 now under review by IAD and TWG.
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.2. Guidelines for FWUC subdecree implementation
SO2.1.2. Guidelines for FWUC subdecree implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Draft guidelines dated 2015
Target comment
SO2.1.2. Guidelines for FWUC subdecree implementation are finalized and submitted for approval by midterm
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
SO2.1.3 A Gender Action Plan is produced and implemented for O&M of IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.3. A GAP is elaborated at the beginning of the program
Actual comment
GAP report summited in Feb 2021 implementation has started in Mid2021
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.5 % of FWUCs strengthened for GAP implementation
SO2.1.5 % of FWUCs strengthened for GAP implementation
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 2.1.5. at least 30 of FWUCs strengthened for GAP implementation at the end of the program
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.6 No. of water allocation rule adopted and APEX created
SO2.1.6 No. of water allocation rule adopted and APEX created
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1.6 at least 2 water allocation rule adopted and 2 APEX created
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 116708
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205541
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 205557
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 263925
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286386
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
SO2.1. Tools and capacities for O&M are available at MoWRAM and PDoWRAM levels
REFERENCE
VOCAB 99
CODE 4286402
INDICATOR
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
SO2.1.7 Land security enhanced in all rehabilitated IDS and Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
No. of ha of detail measurement survey DMS
Actual comment
Land holding survey LHS Batch1 3583 ha O Kambor Sakarach 408 ha Kunghot AB 2273 ha Preks Cluster 902 ha. Batch2 5632 ha Kunghot CD 1706 ha Meun Reach 1062 ha MkakKrapeu 1495 ha MkakKouk Tlouk Leu 1369 ha
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 116709
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205542
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205558
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 263926
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286387
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286403
INDICATOR
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
SO2.2.4. Strengthening of Farmer and Water Net capacity: No. of FWUC members, No. of contract farming signed.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
50 FWUC member of FWN in 2019. No contract farming in 2019
Target comment
At least 90 FWUC become member of FWN in 2023.At least 3 contracts farming in 2023.
Actual comment
59 FWUC members of FWN in December 2021.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 116709
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205542
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205558
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 263926
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286387
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286403
INDICATOR
SO2.2.1. number of FWUC created, registered
SO2.2.1. number of FWUC created, registered
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.1 30 FWUC created and registered at the end of the program
Actual comment
5 FWUC created for OKambor Sakarach Kunghot AB CD MkakKrapeu MkakKork Thlok Leu.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 116709
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205542
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205558
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 263926
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286387
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286403
INDICATOR
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
SO2.2.2. number of FWUCs leaders strengthened for IDS/Preks O&M in the rehabilitated IDS (male/female)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.2. at least 50 FWUCs leaders trained at the end of the program
Actual comment
Up to December 2021 10 FWUC leaders trained for irrigation schemesPreks in Batch 1.
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 116709
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205542
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 205558
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 263926
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286387
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
SO2.2 Water Users are structured, organized and strengthened in order to manage IDSs/Preks
REFERENCE
VOCAB 99
CODE 4286403
INDICATOR
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
SO2.2.3. number of Responsibility sharing agreements (LoA) signed in the rehabilitated IDS / Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2.3. 30 LoA are signed at the end of the program
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 116710
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205543
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205559
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 263927
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286388
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286404
INDICATOR
SO3.1.1 Tonle Sap river basin characterization
SO3.1.1 Tonle Sap river basin characterization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.1 No Tonle Sap River basin Action plan
Target comment
SO3.1.1. Tonle Sap river basin characterization and action plan are prepared by the end of the program
Actual comment
7 IWRM initiatives in the Tonle Sap basinsubbasins Stung Sangke Stung Moung Russei Stung Pursat Stung Boribo Stung Sreng Stung Chinit Stung Sen.9 rivers basin outside Tonle Sap basin Stung Prek Thnot Stung Slakou 3S Sesan Sekong Sre Pok and 4P Prek Te Prek Kampi Prek Preah Prek Krieng
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 116710
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205543
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205559
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 263927
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286388
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286404
INDICATOR
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
SO3.1.2 Stung Sen River basin updated characterization, water balance refinement for Action Plan Phase 2
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO3.1.2 Stung Sen River basin Action plan Phase 1
Target comment
SO3.1.2 Stung Sen River basin characterization updated and Action plan Phase 2 by the end of the program
Actual comment
not yet due
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 116710
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205543
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205559
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 263927
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286388
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286404
INDICATOR
SO3.1.3. % of river basin committee members that endorse the management plan
SO3.1.3. % of river basin committee members that endorse the management plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.3. by end 2024 Stung Sen 100. Stung Sangke and other river basin of Tonl Sap 80
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 116710
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205543
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 205559
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 263927
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286388
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.1. IWRM tools and capacities for river basin management are provided
SO3.1. IWRM tools and capacities for river basin management are provided
REFERENCE
VOCAB 99
CODE 4286404
INDICATOR
SO3.1.4 Stung Sangke river basin development
SO3.1.4 Stung Sangke river basin development
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.1.4 by end 2024 Roadmap for IWRM in the Stung Sangke
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 116711
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205544
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205560
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 263928
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286389
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286405
INDICATOR
SO3.2.1 A study on the upper Mekong delta hydraulic
SO3.2.1 A study on the upper Mekong delta hydraulic
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.1 A report on the hydraulic system dynamics of the MekongBassac
Actual comment
Draft final report submitted
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 116711
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205544
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205560
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 263928
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286389
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286405
INDICATOR
SO3.2.2. A hydrohydraulic simulation model
SO3.2.2. A hydrohydraulic simulation model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.2 hydraulic model for the Upper Mekong Delta is built
Actual comment
2D model developed
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 116711
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205544
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 205560
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 263928
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286389
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
SO3.2. Tools for Cambodian floodplain of the Mekong delta management
REFERENCE
VOCAB 99
CODE 4286405
INDICATOR
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
SO3.2.3 Master Plan for Preks rehabilitation in the upper Mekong delta is based on the model
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.2.3. Master Plan for Preks rehabilitation in the upper Mekong delta is delivered within two years after beginning of program implementation
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 116712
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 205545
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 205561
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 263929
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 4286390
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.3. Water resources Management with spatial hydrology tools
SO3.3. Water resources Management with spatial hydrology tools
REFERENCE
VOCAB 99
CODE 4286406
INDICATOR
SO3.3.1. Space hydrology tools purchased
SO3.3.1. Space hydrology tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.3.1. Software and hardware on space hydrology purchased and owned by MoWRAM within two years after program beginning to be determined in the inception report
Actual comment
not yet due
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 116713
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 205546
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 205562
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 263930
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 4286391
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO3.4 Climatologic spatial tools
SO3.4 Climatologic spatial tools
REFERENCE
VOCAB 99
CODE 4286407
INDICATOR
SO3.4.1. Space climatic tools purchased
SO3.4.1. Space climatic tools purchased
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO3.4.1. Software hardware on space climatic purchased and owned by MoWRAM by 2021 to be determined in the inception report
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 116714
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 205547
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 205563
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 263931
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 4286392
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.1 Support to MAFF on climate smart agriculture
SO4.1 Support to MAFF on climate smart agriculture
REFERENCE
VOCAB 99
CODE 4286408
INDICATOR
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
SO4.1.1. Short terms expertise missions are organized in response to MAFF demands
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.1.1. One mission report by mission
Actual comment
1 mission in 2021 for study on Geographic Indication for rice
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 116715
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 205548
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 205564
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 263932
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 4286393
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 4286409
INDICATOR
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks
SO 4.2.1. number of experimental plots for technical package development in operational IDS/Preks5 provinces: Preah Vihear, Kampong Thom, Siem Reap , Battambang and Kandal.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Target comment
SO4.2.1. One experimental plot per province at midterm.5 provinces Preah Vihear Kampong Thom Siem Reap Battambang and Kandal.
Actual comment
3 sites at Kunghot 5.8 ha O Kambor 0.8 ha Stung Chinit 4.1 ha.
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 116715
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 205548
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 205564
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 263932
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 4286393
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.2. Research and development on CSA in irrigated areas
SO4.2. Research and development on CSA in irrigated areas
REFERENCE
VOCAB 99
CODE 4286409
INDICATOR
SO4.2.2 number of MAFFs central and local staff trained on new technical package
SO4.2.2 number of MAFFs central and local staff trained on new technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.2.2. 90 staffs from MAFF PDAFFDistricts
Actual comment
23 staffs of PDAFFMAFF DALRM DEAFF
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 116716
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205549
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205565
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 263933
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286394
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286410
INDICATOR
SO 4.3.1 number of pilot farmers trained on selected technical package
SO 4.3.1 number of pilot farmers trained on selected technical package
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.1. At least 100 pilot farmers are trained
Actual comment
46 pilot farmers trained Kunghot 21 O Kambor Sakarach 9 Meun Reach 4 and Mkak 12.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 116716
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205549
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205565
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 263933
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286394
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286410
INDICATOR
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
SO4.3.2 Key farmers supported in new agroecological practices by pilot farmers.
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.2. At least 600 key farmers are trained
Actual comment
538 key farmers are trained Kunghot 428 O Kambor 59 Meun Reach 11 Mkak 40.
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 116716
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205549
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 205565
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 263933
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286394
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
SO4.3. Agricultural extension in the Irrigated Schemes and Preks
REFERENCE
VOCAB 99
CODE 4286410
INDICATOR
SO4.3.3. Number of PDAFF staff trained on CSA practices
SO4.3.3. Number of PDAFF staff trained on CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.3.3. 60 PDAFF trained
Actual comment
9 staffs trains
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 116717
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205550
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205566
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 263934
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286395
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286411
INDICATOR
SO 4.4.1. Rice value chain bulletins
SO 4.4.1. Rice value chain bulletins
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO 4.4.1. MAFF produces semestrial bulletins on rice value chain
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 116717
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205550
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205566
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 263934
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286395
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286411
INDICATOR
SO4.4.2. MAFF rice Action plan
SO4.4.2. MAFF rice Action plan
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.2. MAFF updated rice policy action plan finalized
Actual comment
not yet due
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 116717
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205550
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 205566
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 263934
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286395
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Output
indicator( 1 )
SO4.4. Agricultural Value Chains Support
SO4.4. Agricultural Value Chains Support
REFERENCE
VOCAB 99
CODE 4286411
INDICATOR
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
SO4.4.3. Number of contract farming negotiation for quality rice with FO supported by the program
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.4.3. 3 supported signed contracts at least with PMUAC and BUAC
Actual comment
Up to Dec 2021 one contract signed between BUAC and AgriBee with 1700 tons of rice delivered.
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 116703
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205536
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205552
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 263920
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286381
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286397
INDICATOR
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
SO1.1 Irrigated areas in the IDS and Preks rehabilitated by the program during wet season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.1 30 of IDSPreks are irrigated during wet season
Target comment
SO1.1 Between 15000 and 20000 ha 100 of the rehabilitated area will be irrigated
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 116703
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205536
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205552
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 263920
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286381
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286397
INDICATOR
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
SO1.2 Cultivated area in the IDS rehabilitated by the program during dry, early and late season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO1.2. no IDS cultivated in dry season few cultivated in earlylate season
Target comment
SO1.2 4500 ha 50 of IDS cultivated in dry andor early andor late season at the end of the program
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 116703
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205536
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 205552
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 263920
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286381
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO1 Increased cultivated areas during dry and wet seasons in the program area
SO1 Increased cultivated areas during dry and wet seasons in the program area
REFERENCE
VOCAB 99
CODE 4286397
INDICATOR
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
SO1.3 Population benefiting from the rehabilitation of the IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
people
Actual comment
Total in 2021 5291 ha 7829 plots 2827 HH 6 Preks 903 ha 1322 HHOKambor Sakarach 409 ha 264 HHKunghot AB 2274 ha 652 HHKunghot CD 1706 ha 589 HH
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 116704
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205537
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205553
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 263921
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286382
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286398
INDICATOR
SO2.4. Allocated budget for O&M fund by MEF (per year)
SO2.4. Allocated budget for O&M fund by MEF (per year)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO2.4. US 15 million in 2018
Target comment
SO2.4. Budget allocated to the OM fund reaches US 30 million per year at the end of the program
Actual comment
OM fund amount for 2021 is Riels 82 billion US 20 million.
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 116704
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205537
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205553
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 263921
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286382
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286398
INDICATOR
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.1. Level of membership fee (MF) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.1. 80 of the members pay their MF by the end of the program
Actual comment
OKambor Sakarach 84 Kunghot AB 81 6 Prek cluster 78 Meun Reach 17 MkakKork Thlok Leu 5 Kunghot CD 73Average 563
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 116704
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205537
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205553
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 263921
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286382
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286398
INDICATOR
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
SO2.2. Level of Irrigation Service Contribution (ISC) collected by the FWUCs created in the rehabilitated IDS/Preks
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.2. 60 of the members pay their ISC 3 years after FWUC registration
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 116704
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205537
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 205553
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 263921
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286382
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
SO2. Improved shared O&M of IDS/Preks by FWUCs and MoWRAM
REFERENCE
VOCAB 99
CODE 4286398
INDICATOR
SO2.3. % of women feeling represented in IDS/Preks management
SO2.3. % of women feeling represented in IDS/Preks management
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO2.3. a majority of women feel better represented at the end of the program
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 116705
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 205538
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 205554
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 263922
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 4286383
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
SO3. Improved IWRM capacities and related services provided by MoWRAM for national stakeholders
REFERENCE
VOCAB 99
CODE 4286399
INDICATOR
SO3.1. Produced river basin management plans and action plans
SO3.1. Produced river basin management plans and action plans
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
to be better determined by TA IWRM
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.6. rate of producers adopting CSA practices
SO4.6. rate of producers adopting CSA practices
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
Rate per farmer
Target comment
SO4.6. each key farmer trains 5 farmers by the end of the program
Actual comment
538 Key Farmers trained and adopted the AE practice
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.2. Cropping intensity in IDS
SO4.2. Cropping intensity in IDS
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.2 Cropping intensity 1
Target comment
SO4.2. Cropping intensity 1.58
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.3. % of area of IDS with rice or high value crop in dry season
SO4.3. % of area of IDS with rice or high value crop in dry season
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.3 no cropping in dry season
Target comment
SO4.3. 20 of IDS area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.4. % of Preks areas secured for high value crop during the dry months
SO4.4. % of Preks areas secured for high value crop during the dry months
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
SO4.4. 60 of Preks area
Target comment
SO4.4. 75 of Preks area at the end of the program
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.1. paddy rice production
SO4.1. paddy rice production
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 116706
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205539
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 205555
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 263923
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286384
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Outcome
indicator( 1 )
SO4. Improved performance and resilience of agricultural production in the program area
SO4. Improved performance and resilience of agricultural production in the program area
REFERENCE
VOCAB 99
CODE 4286400
INDICATOR
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
SO4.5. % farmers getting a paddy rice premium thanks to contract farming and quality production valorization
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Target comment
SO4.5. at least 20 of supported farmers
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 116702
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 205535
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 205551
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 263919
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 4286380
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
Impact
indicator( 1 )
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
Building a sustainable and resilient agriculture to support growth and inclusiveness in Cambodia
REFERENCE
VOCAB 99
CODE 4286396
INDICATOR
% population below the poverty line in rural areas in the provinces of intervention
% population below the poverty line in rural areas in the provinces of intervention
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
TBD : TBD
Location : KH
2018
Not provided
Not provided
Not provided
N/A
2018-12-24 : 2025-12-25
Baseline comment
18.5 Preah Vihear 16.2 Kampong Thom22.1 Siem Reap21.0 Battambang8.9 Kandal. Average 17.34Reference year 2019 of the total number of rural households.
Target comment
17.5 Preah Vihear 15.5 Kampong Thom 20 Siem Reap 20 Battambang 8.0 Kandal Province. Average 16.2Target Year 2025
General Enquiries
KH
Delegation of the European Union to Cambodja
(855) 23 216 996
100A Norodom Boulevard, Sangkat Chaktomuk, Khan Daun Penh, 12207 Phnom Penh
other identifier( 2 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
2017000339005 CRS Activity identifier
CODE A2
No description provided
XI-IATI-EC_INTPA-2018/398-466 Previous Activity Identifier
CODE A3
The standard insists that once an activity has been reported to IATI its identifier MUST NOT be changed, even if the reporting organisation changes its organisation identifier. There may be exceptional circumstances in which this rule cannot be followed, in which case the previous identifier should be reported using this code.