ACTIVITY SCOPE | COLLABORATION TYPE | AID TYPE | FINANCE TYPE | FLOW TYPE | TIED STATUS | HIERARCHY |
---|---|---|---|---|---|---|
Sub-national: Multi-first-level administrative areas 5 | Multilateral (inflows) 2 | Standard loan 421 | ODA 10 | Untied | 1 |
PARTICIPATING ORG | REFERENCE | ROLE | TYPE |
---|---|---|---|
African Development Fund
|
REF XM-DAC-46003
|
Funding | Multilateral |
Ministry of Water and Environment
|
REF UG-COA-019
|
Implementing | Government |
NAME | DESCRIPTION | POSITION | CLASS | REACH | EXACTNESS |
---|---|---|---|---|---|
Bundibugyo District
ID 443329 (Global Admininistrative Unit Layers)
|
TYPE second-order administrative division
ADM2
|
0.66667 30.05 | Administrative Region | Approximate | |
Kamuli District
ID 443340 (Global Admininistrative Unit Layers)
|
TYPE second-order administrative division
ADM2
|
0.95 33.1167 | Administrative Region | Approximate | |
Kayunga District
ID 448218 (Global Admininistrative Unit Layers)
|
TYPE second-order administrative division
ADM2
|
1 32.8667 | Administrative Region | Approximate | |
Kyenjojo District
ID 448219 (Global Admininistrative Unit Layers)
|
TYPE second-order administrative division
ADM2
|
0.656961 30.6599 | Administrative Region | Approximate | |
Dokolo District
ID 7056283 (Global Admininistrative Unit Layers)
|
TYPE second-order administrative division
ADM2
|
1.93607 33.0614 | Administrative Region | Approximate | |
Kapchorwa
ID 232235 (Geonames)
|
TYPE populated place
PPL
|
1.40096 34.4504 | Populated Place | Approximate | |
Buikwe District
ID 8030577 (Geonames)
|
TYPE second-order administrative division
ADM2
|
0.3012 33.0518 | Administrative Region | Approximate | |
Nakasongola District
ID 443786 (Geonames)
|
TYPE second-order administrative division
ADM2
|
1.38903 32.41608 | Administrative Region | Exact |
START | END | TYPE | STATUS | VALUE |
---|---|---|---|---|
2019-02-04 | 2019-05-04 | Original | 1,629,629.62963 XDR |
|
2019-05-04 | 2019-08-04 | Original | 1,629,629.62963 XDR |
|
2019-08-04 | 2019-11-04 | Original | 1,629,629.62963 XDR |
|
2019-11-04 | 2020-02-04 | Original | 1,629,629.62963 XDR |
|
2020-02-04 | 2020-05-04 | Original | 1,629,629.62963 XDR |
|
2020-05-04 | 2020-08-04 | Original | 1,629,629.62963 XDR |
|
2020-08-04 | 2020-11-04 | Original | 1,629,629.62963 XDR |
|
2020-11-04 | 2021-02-04 | Original | 1,629,629.62963 XDR |
|
2021-02-04 | 2021-05-04 | Original | 1,629,629.62963 XDR |
|
2021-05-04 | 2021-08-04 | Original | 1,629,629.62963 XDR |
|
2021-08-04 | 2021-11-04 | Original | 1,629,629.62963 XDR |
|
2021-11-04 | 2022-02-04 | Original | 1,629,629.62963 XDR |
|
2022-02-04 | 2022-05-04 | Original | 1,629,629.62963 XDR |
|
2022-05-04 | 2022-08-04 | Original | 1,629,629.62963 XDR |
|
2022-08-04 | 2022-11-04 | Original | 1,629,629.62963 XDR |
|
2022-11-04 | 2023-02-04 | Original | 1,629,629.62963 XDR |
|
2023-02-04 | 2023-05-04 | Original | 1,629,629.62963 XDR |
|
2023-05-04 | 2023-08-04 | Original | 1,629,629.62963 XDR |
|
2023-08-04 | 2023-11-04 | Original | 1,629,629.62963 XDR |
|
2023-11-04 | 2024-02-04 | Original | 1,629,629.62963 XDR |
|
2024-02-04 | 2024-05-04 | Original | 1,629,629.62963 XDR |
|
2024-05-04 | 2024-08-04 | Original | 1,629,629.62963 XDR |
|
2024-08-04 | 2024-11-04 | Original | 1,629,629.62963 XDR |
|
2024-11-04 | 2025-02-04 | Original | 1,629,629.62963 XDR |
|
2025-02-04 | 2025-05-04 | Original | 1,629,629.62963 XDR |
|
2025-05-04 | 2025-08-04 | Original | 1,629,629.62963 XDR |
|
2025-08-04 | 2025-12-31 | Original | 1,629,629.62963 XDR |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2019-02-04 |
REF 2100150039644
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
44,000,000 XDR |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2019-07-31 |
Total Disbursement in July of 2019
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
655,166.45 XDR |
2020-07-15 |
Total Disbursement in July of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
2,133,396.24 XDR |
2020-09-15 |
Total Disbursement in September of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
588,811.46 XDR |
2020-11-15 |
Total Disbursement in November of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
157,100.57 XDR |
2020-12-31 |
Total Disbursement in December of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,791,293.93 XDR |
2021-01-31 |
Total Disbursement in January of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
38,906.88 XDR |
2021-04-15 |
Total Disbursement in April of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
136,173.93 XDR |
2021-04-30 |
Total Disbursement in April of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,007,458.1 XDR |
2021-06-30 |
Total Disbursement in June of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
77,547.18 XDR |
2021-07-15 |
Total Disbursement in July of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,435,163.24 XDR |
2021-07-31 |
Total Disbursement in July of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,867,307.47 XDR |
2021-08-15 |
Total Disbursement in August of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,199,104.49 XDR |
2021-08-31 |
Total Disbursement in August of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
130,178.28 XDR |
2021-11-15 |
Total Disbursement in November of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
85,340.05 XDR |
2021-12-31 |
Total Disbursement in December of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
5,040,934.01 XDR |
2022-02-28 |
Total Disbursement in February of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
47,711.81 XDR |
2022-03-31 |
Total Disbursement in March of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
111,295.03 XDR |
2022-05-15 |
Total Disbursement in May of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,230,120.08 XDR |
2022-05-31 |
Total Disbursement in May of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,053,930.12 XDR |
2022-06-30 |
Total Disbursement in June of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
488,817.09 XDR |
2022-07-31 |
Total Disbursement in July of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
459,441.67 XDR |
2022-08-31 |
Total Disbursement in August of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
2,332,915.32 XDR |
2022-09-30 |
Total Disbursement in September of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
290,972.36 XDR |
2022-11-15 |
Total Disbursement in November of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
2,179,752.46 XDR |
2022-12-31 |
Total Disbursement in December of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
2,152,868.01 XDR |
2023-02-15 |
Total Disbursement in February of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
127,243.93 XDR |
2023-03-15 |
Total Disbursement in March of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
392,377.8 XDR |
2023-04-15 |
Total Disbursement in April of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
443,833.96 XDR |
2023-04-30 |
Total Disbursement in April of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
284,948.29 XDR |
2023-05-31 |
Total Disbursement in May of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
317,691.51 XDR |
2023-06-15 |
Total Disbursement in June of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
2,219,602.13 XDR |
2023-06-30 |
Total Disbursement in June of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
219,733.94 XDR |
2023-07-15 |
Total Disbursement in July of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
518,741.99 XDR |
2023-09-30 |
Total Disbursement in September of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,408,270.56 XDR |
2023-10-15 |
Total Disbursement in October of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,310,633.91 XDR |
2023-10-31 |
Total Disbursement in October of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
358,180.31 XDR |
2023-11-15 |
Total Disbursement in November of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
6,474.38 XDR |
2023-11-30 |
Total Disbursement in November of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
312,067.05 XDR |
2023-12-15 |
Total Disbursement in December of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
263,464.02 XDR |
2023-12-31 |
Total Disbursement in December of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
3,055,009.1 XDR |
2024-03-15 |
Total Disbursement in March of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
102,670.17 XDR |
2024-05-15 |
Total Disbursement in May of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
997,805.68 XDR |
2024-06-15 |
Total Disbursement in June of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
312,800.27 XDR |
2024-06-30 |
Total Disbursement in June of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
1,006,999.91 XDR |
2024-10-15 |
Total Disbursement in October of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
588,215.27 XDR |
2024-11-30 |
Total Disbursement in November of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
468,957.02 XDR |
2025-02-28 |
Total Disbursement in February of 2025
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Water and Environment
REF UG-COA-019
|
300,841.28 XDR |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2019-08-31 |
Total Interest Repayment in August of 2019
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
6,630.14 XDR |
|
2020-02-29 |
Total Interest Repayment in February of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
111,044.97 XDR |
|
2020-08-31 |
Total Interest Repayment in August of 2020
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
111,138.19 XDR |
|
2021-02-15 |
Total Interest Repayment in February of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
3,009.05 XDR |
|
2021-02-28 |
Total Interest Repayment in February of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
110,391.96 XDR |
|
2021-08-31 |
Total Interest Repayment in August of 2021
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
116,408.47 XDR |
|
2022-02-15 |
Total Interest Repayment in February of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
Government Of Uganda |
123,684.42 XDR |
|
2022-08-31 |
Total Interest Repayment in August of 2022
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
134,621.01 XDR |
2023-03-15 |
Total Interest Repayment in March of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
140,937.05 XDR |
2023-08-31 |
Total Interest Repayment in August of 2023
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
146,087.99 XDR |
2024-02-29 |
Total Interest Repayment in February of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Ministry of Finance |
153,325.32 XDR |
2024-08-31 |
Total Interest Repayment in August of 2024
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
162,593.71 XDR |
2025-02-28 |
Total Interest Repayment in February of 2025
FLOW ODA
10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
|
African Development Fund
REF XM-DAC-46003
|
Government Of Uganda |
166,938.95 XDR |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
10.0 | 10.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
96.0 | 87.0 |
90%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
6.0 | 6.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
30.0 | 27.0 |
90%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
40.0 | 42.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
150.0 | 155.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
30.0 | 30.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
5.0 | 10.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
3.0 | 0.0 |
0%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
6.0 | 6.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
10.0 | 9.0 |
90%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
390000.0 | 436071.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
8.0 | 8.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
200.0 | 859.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
60.0 | 41.02 |
68%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
90.0 | 74.4 |
82%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
1.0 | 0.0 |
0%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
1300.0 | 1277.76 |
98%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
37500.0 | 52081.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
1.0 | 1.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
4.0 | 4.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
1.0 | 1.0 |
100%
|
2018-01-01 : 2025-12-31 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
Not provided
|
1.0 | 1.0 |
100%
|
2018-01-01 : 2025-12-31 |
REFERENCE IDENTIFIER | OWNER ORG IDENTIFIER | TYPE | DESCRIPTION |
---|---|---|---|
46002 |
XM-DAC-46002
African Development Bank |
Previous Reporting Organisation Identifier
CODE B1
|
No description provided |
NARRATIVE | TYPE | DESCRIPTION |
---|---|---|
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
|
Policy | The condition attached requires a particular policy to be implemented by the recipient |
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |