ACTIVITY TITLE
Ethiopia - Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (AATDRUP)
Ethiopie - Projet de réhabilitation et modernisation du système de transmission et de distribution d'électricité d'Addis Abeba
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard loan 421 ODA 10 Untied 1
DOCUMENTS ( 25 )
Appraisal Report APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Appraisal Report APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Environmental Study APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Environmental Study APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Contract APPLICATION/PDF EN Summary information about contract Contract Contract APPLICATION/PDF EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/PDF FR Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL FR Summary information about contract Contract Expression of Interest APPLICATION/PDF EN Tender Activity TEXT/HTML FR Activity web page Activity TEXT/HTML FR Activity web page
Planned start date 2017-11-22
Planned end date 2026-06-30
Actual start date 2017-12-20
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 3 )
PARTICIPATING ORG REFERENCE ROLE TYPE
African Development Fund
Funding Multilateral
Ethiopian Electric Power (EEP)
Implementing Government
Government of Ethiopia
Extending Government
Objectives
L'objectif du projet est de réhabiliter et moderniser les infrastructures existantes de transmission et de distribution d’électricité dans la capitale du pays et dans les villes environnantes en vue d’améliorer la qualité et la fiabilité de l’alimentation en énergie et de renforcer les capacités du réseau de transmission d’électricité.
The objective of the project is to rehabilitate and modernize existing power transmission and distribution infrastructure in the country's capital and surrounding cities in order to improve the quality and reliability of power supply and strengthen the capacity of the electricity transmission network.
General
Le Projet de réhabilitation et de modernisation du système de transmission et de distribution d’électricité d’Addis Abéba vise à étendre l'accès au réseau d'électricité à environ 5 millions de résidents de la capitale éthiopienne et ses zones urbaines environnantes sur un rayon de 50 km dans l’Etat régional d’Oromia. Le projet est articulé autour de trois composantes. La première consiste en la réhabilitation et la rénovation (à court et moyen termes) des réseaux de transmission et de distribution d’électricité à Addis Abéba. Le deuxième volet porte sur la rénovation du réseau de distribution dans les zones urbaines voisines da la région d’Oromia, conformément à la stratégie gouvernementale de croissance à large assise, de réduction de la pauvreté et d’amélioration de l’efficience en matière de prestation de services, ce qui devrait concourir à une transformation économique inclusive. La troisième composante contribuera à l’amélioration et au renforcement de l’alimentation en électricité, ce qui devrait ainsi renforcer les capacités d’alimentation, tout en réduisant les déperditions le long du réseau, en plus de faciliter une alimentation en électricité abordable et fiable aussi bien pour les ménages que pour les entreprises, les services sociaux et les édifices publics, avec à la clé l’augmentation des taux d’accès à l’électricité, l’amélioration des conditions de vie de la population, la croissance des entreprises et la création d’emplois, sans compter la croissance économique. Le coût total du projet est estimé à 154,39 millions d’UC (soit 209,03 millions d’USD).
The Addis Ababa Electricity Transmission and Distribution System Rehabilitation and Modernization Project aims to extend access to the electricity grid to approximately 5 million residents of the Ethiopian capital and surrounding urban areas over a radius of 50 km in the regional state of Oromia. The project is structured around three components. The first is the rehabilitation and renovation (in the short and medium term) of transmission and distribution networks in Addis Ababa. The second component is the renovation of the distribution network in the surrounding urban areas of the Oromia region, in line with the government's strategy of broad-based growth, poverty reduction and efficiency improvement in service delivery, which should contribute to inclusive economic transformation. The third component will contribute to the improvement and strengthening of the electricity supply,This should increase power supply capacity, while reducing losses along the grid and facilitate an affordable and reliable power supply for both households and businesses, social services and public buildings, with the key to increasing access rates to electricity, improving the living conditions of the population, business growth and job creation, not to mention economic growth. The total cost of the project is estimated at UA 154.39 million (US $ 209.03 million).
Target Groups
Les principaux bénéficiaires du projet sont : les sociétés d’électricité Ethiopian Electric Power (EEP) et Ethiopian Electric Utility (EEU), les résidents de la capitale, les industries, les établissements de santé et d’éducation, ainsi que les entreprises commerciales qui dépendent actuellement d’une alimentation en électricité limitée et peu fiable.
The main beneficiaries of the project are the Ethiopian Electric Power (EEP) and Ethiopian Electric Utility (EEU) electricity companies, the residents of the capital, the industries, the health and education institutions, as well as the commercial enterprises, which currently depend on a limited and unreliable power supply.
recipient country ( 1 )
EthiopiaET
100
LOCATION ( 2 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Addis Ababa
ID 344979 (Geonames)
TYPE capital of a political entity PPLC
9.02497 38.7469 Populated Place Exact
Oromiya
ID 444185 (Geonames)
TYPE first-order administrative division ADM1
8 39 Administrative Region Exact
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
3.6.1
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Energy sector policy, planning and administration23111
100
GLOSSARY
Energy sector policy, planning and administrationNo description provided
Financial Overview
Outgoing Commitment ( 3 )
Disbursement ( 78 )
Interest Payment ( 14 )
Budget ( 34 )
Outgoing Commitment
Disbursement
Interest Payment
Budget
Budget ( 34 )
START END TYPE STATUS VALUE
2017-12-20 2018-03-20 Original 2,124,411.764706
XDR
2018-03-20 2018-06-20 Original 2,124,411.764706
XDR
2018-06-20 2018-09-20 Original 2,124,411.764706
XDR
2018-09-20 2018-12-20 Original 2,124,411.764706
XDR
2018-12-20 2019-03-20 Original 2,124,411.764706
XDR
2019-03-20 2019-06-20 Original 2,124,411.764706
XDR
2019-06-20 2019-09-20 Original 2,124,411.764706
XDR
2019-09-20 2019-12-20 Original 2,124,411.764706
XDR
2019-12-20 2020-03-20 Original 2,124,411.764706
XDR
2020-03-20 2020-06-20 Original 2,124,411.764706
XDR
2020-06-20 2020-09-20 Original 2,124,411.764706
XDR
2020-09-20 2020-12-20 Original 2,124,411.764706
XDR
2020-12-20 2021-03-20 Original 2,124,411.764706
XDR
2021-03-20 2021-06-20 Original 2,124,411.764706
XDR
2021-06-20 2021-09-20 Original 2,124,411.764706
XDR
2021-09-20 2021-12-20 Original 2,124,411.764706
XDR
2021-12-20 2022-03-20 Original 2,124,411.764706
XDR
2022-03-20 2022-06-20 Original 2,124,411.764706
XDR
2022-06-20 2022-09-20 Original 2,124,411.764706
XDR
2022-09-20 2022-12-20 Original 2,124,411.764706
XDR
2022-12-20 2023-03-20 Original 2,124,411.764706
XDR
2023-03-20 2023-06-20 Original 2,124,411.764706
XDR
2023-06-20 2023-09-20 Original 2,124,411.764706
XDR
2023-09-20 2023-12-20 Original 2,124,411.764706
XDR
2023-12-20 2024-03-20 Original 2,124,411.764706
XDR
2024-03-20 2024-06-20 Original 2,124,411.764706
XDR
2024-06-20 2024-09-20 Original 2,124,411.764706
XDR
2024-09-20 2024-12-20 Original 2,124,411.764706
XDR
2024-12-20 2025-03-20 Original 2,124,411.764706
XDR
2025-03-20 2025-06-20 Original 2,124,411.764706
XDR
2025-06-20 2025-09-20 Original 2,124,411.764706
XDR
2025-09-20 2025-12-20 Original 2,124,411.764706
XDR
2025-12-20 2026-03-20 Original 2,124,411.764706
XDR
2026-03-20 2026-06-30 Original 2,124,411.764706
XDR
Budget
Transactions ( 95 )
Outgoing Commitment ( 3 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2017-12-20
REF 2100150038493
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
61,410,000
XDR
2017-12-20
REF 2100155036021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Government of Ethiopia
10,820,000
XDR
2017-12-20
REF 1
FLOW ODA 10
STATUS Untied 5
Government of Ethiopia
Government of Ethiopia
15,210,000
XDR
Outgoing Commitment
Disbursement ( 78 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-12-31
Total Disbursement in December of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
115,184.2
XDR
2018-12-31
Total Disbursement in December of 2018
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
177,215.91
XDR
2019-10-31
Total Disbursement in October of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
1,533,140.13
XDR
2020-02-29
Total Disbursement in February of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
107,560.65
XDR
2020-03-31
Total Disbursement in March of 2020
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
175,755.26
XDR
2020-06-15
Total Disbursement in June of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
117,108.33
XDR
2020-07-15
Total Disbursement in July of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
343,239.3
XDR
2020-09-30
Total Disbursement in September of 2020
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
53,071.7
XDR
2020-10-15
Total Disbursement in October of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
126,931.37
XDR
2020-10-15
Total Disbursement in October of 2020
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
24,721.74
XDR
2020-11-30
Total Disbursement in November of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
494,106.74
XDR
2020-12-31
Total Disbursement in December of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
5,826,367.68
XDR
2021-01-31
Total Disbursement in January of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
45,713.34
XDR
2021-02-28
Total Disbursement in February of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
25,027.03
XDR
2021-03-31
Total Disbursement in March of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
1,703,029.98
XDR
2021-05-31
Total Disbursement in May of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
603,030.73
XDR
2021-05-31
Total Disbursement in May of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
65,631.73
XDR
2021-07-15
Total Disbursement in July of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
85,566.48
XDR
2021-07-31
Total Disbursement in July of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
172,196.11
XDR
2021-09-15
Total Disbursement in September of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
154,079.98
XDR
2021-09-30
Total Disbursement in September of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
833,277.77
XDR
2021-10-15
Total Disbursement in October of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
396,081.76
XDR
2021-11-30
Total Disbursement in November of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
84,886.43
XDR
2021-11-30
Total Disbursement in November of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
29,045.37
XDR
2021-12-31
Total Disbursement in December of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
5,627,838.75
XDR
2021-12-31
Total Disbursement in December of 2021
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
624,205.82
XDR
2022-02-15
Total Disbursement in February of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
151,621.18
XDR
2022-02-15
Total Disbursement in February of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
118,435.3
XDR
2022-02-28
Total Disbursement in February of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
44,909.17
XDR
2022-02-28
Total Disbursement in February of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
67,074.78
XDR
2022-03-31
Total Disbursement in March of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
228,215.72
XDR
2022-03-31
Total Disbursement in March of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
2,482,995.95
XDR
2022-04-30
Total Disbursement in April of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
2,482.01
XDR
2022-04-30
Total Disbursement in April of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
120,415.55
XDR
2022-05-15
Total Disbursement in May of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
6,763.31
XDR
2022-05-31
Total Disbursement in May of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
67,142.59
XDR
2022-06-30
Total Disbursement in June of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
383,702.12
XDR
2022-07-31
Total Disbursement in July of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
1,729,085.82
XDR
2022-07-31
Total Disbursement in July of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
148,666.2
XDR
2022-08-31
Total Disbursement in August of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
122,202.7
XDR
2022-09-30
Total Disbursement in September of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
337,744.51
XDR
2022-09-30
Total Disbursement in September of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
84,413.21
XDR
2022-11-15
Total Disbursement in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
476,487.92
XDR
2022-11-15
Total Disbursement in November of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
513,198.25
XDR
2022-11-30
Total Disbursement in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
44,895.81
XDR
2022-11-30
Total Disbursement in November of 2022
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
34,181.64
XDR
2023-02-15
Total Disbursement in February of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
432,681.41
XDR
2023-02-15
Total Disbursement in February of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
290,380.21
XDR
2023-03-15
Total Disbursement in March of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
404,231.56
XDR
2023-04-15
Total Disbursement in April of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
221,645.86
XDR
2023-05-31
Total Disbursement in May of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
217,799.29
XDR
2023-07-15
Total Disbursement in July of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
726,982.08
XDR
2023-07-31
Total Disbursement in July of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
141,339.02
XDR
2023-07-31
Total Disbursement in July of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
611,414.61
XDR
2023-08-31
Total Disbursement in August of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
154,909.25
XDR
2023-10-31
Total Disbursement in October of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
3,302,082.08
XDR
2023-12-15
Total Disbursement in December of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
509,059.39
XDR
2023-12-15
Total Disbursement in December of 2023
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
168,443.12
XDR
2024-01-31
Total Disbursement in January of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
65,990.75
XDR
2024-02-29
Total Disbursement in February of 2024
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
290,045.01
XDR
2024-03-15
Total Disbursement in March of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
10,232.66
XDR
2024-03-15
Total Disbursement in March of 2024
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
54,903.71
XDR
2024-06-15
Total Disbursement in June of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
109,668.78
XDR
2024-08-31
Total Disbursement in August of 2024
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
114,054.69
XDR
2024-10-15
Total Disbursement in October of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
722,230.44
XDR
2024-10-31
Total Disbursement in October of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
2,204,932.91
XDR
2024-11-15
Total Disbursement in November of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
49,964.21
XDR
2024-12-15
Total Disbursement in December of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
255,568.27
XDR
2024-12-15
Total Disbursement in December of 2024
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
39,909.01
XDR
2025-02-15
Total Disbursement in February of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
63,679.18
XDR
2025-02-15
Total Disbursement in February of 2025
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
60,152.91
XDR
2025-02-28
Total Disbursement in February of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
997,621.52
XDR
2025-02-28
Total Disbursement in February of 2025
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
105,039.53
XDR
2025-03-15
Total Disbursement in March of 2025
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
8,145.29
XDR
2025-04-30
Total Disbursement in April of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
18,121
XDR
2025-04-30
Total Disbursement in April of 2025
FLOW ODA 10
AID Other technical assistance D02
FINANCE Standard grant 110
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
42,001.53
XDR
2025-05-15
Total Disbursement in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
308,538.55
XDR
2025-05-31
Total Disbursement in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ethiopian Electric Power (EEP)
31,258.82
XDR
Disbursement
Interest Payment ( 14 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-08-31
Total Interest Repayment in August of 2018
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
47,950.27
XDR
2019-02-28
Total Interest Repayment in February of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
153,945.62
XDR
2019-08-31
Total Interest Repayment in August of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
153,237.79
XDR
2020-02-29
Total Interest Repayment in February of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
154,711.94
XDR
2020-08-31
Total Interest Repayment in August of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
156,045.19
XDR
2021-02-15
Total Interest Repayment in February of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
156,457.25
XDR
2021-08-31
Total Interest Repayment in August of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
164,875.79
XDR
2022-02-28
Total Interest Repayment in February of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
Government of Ethiopia
169,323.27
XDR
2022-08-31
Total Interest Repayment in August of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
179,494.41
XDR
2023-03-15
Total Interest Repayment in March of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
183,527.21
XDR
2023-08-31
Total Interest Repayment in August of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
183,559.41
XDR
2024-02-29
Total Interest Repayment in February of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministry of Finance
186,779.22
XDR
2024-08-31
Total Interest Repayment in August of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
192,343.41
XDR
2025-02-28
Total Interest Repayment in February of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Government of Ethiopia
194,500.66
XDR
Interest Payment
result( 17 )
output( 17 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
Output
indicator( 1 )
Additional customers connected
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
432000.0 300000.0
69%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Additional energy delivered to Addis Ababa due to the project
INDICATOR
Gwh
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
2824.0 1824.0
64%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Additional HV line constructed
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
3.8 0.0
0%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Additional MV and LV lines constructed
INDICATOR
Km
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
973.0 630.0
64%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Additional revenue collected
INDICATOR
$ million
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
169.4 150.0
88%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of EEP and EEU staff trained
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
30.0 30.0
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of jobs created
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1040.0 900.0
86%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of jobs created - of which women
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
Not provided
240.0 181.0
75%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of people compensated
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
55.0 45.0
81%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of people trained on safety
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
15.0 27.0
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Number of people trained on safety - of which women
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
Not provided
6.0 5.0
83%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Reduce power interruption - Permanent
INDICATOR
faults/km/year
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
0.85 1.1
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Reduce power interruption - Transient
INDICATOR
faults/km/year
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.2 1.3
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Reduce power loss in the MV network
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
2.7 3.1
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
SCADA established
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.0 0.8
80%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Share of vulnerable households benefiting from the project
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
10.0 10.0
100%
2017-01-01 : 2024-12-31
Output
indicator( 1 )
Substations upgraded
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
9.0 8.0
88%
2017-01-01 : 2024-12-31
African Development Bank
COET
Tesfaye Tamirat TEKLEMARIAM
Power Engineer, PESD4
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Policy The condition attached requires a particular policy to be implemented by the recipient
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient