ACTIVITY TITLE
Djibouti - Geothermal Exploration Project in the Lake Assal Region – Supplementary loan
Djibouti - Projet d’exploration géothermique dans la région du Lac Assal – Prêt supplémentaire
Reported by
African Development Bank XM-DAC-46002 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Sub-national: Multi-first-level administrative areas 5 Multilateral (inflows) 2 Standard loan 421 ODA 10 Untied 1
DOCUMENTS ( 21 )
Appraisal Report APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Appraisal Report APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Objectives / Purpose of activity Intended ultimate beneficiaries Conditions Budget Results, outcomes and outputs Environmental Study APPLICATION/PDF EN Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Environmental Study APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Environmental Study APPLICATION/PDF FR Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Project Completion Report APPLICATION/PDF EN Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Evaluation Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Project Completion Report APPLICATION/PDF FR Intended ultimate beneficiaries Review of project performance and evaluation Results, outcomes and outputs Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL EN Summary information about contract Contract Contract APPLICATION/VND.MS-EXCEL FR Summary information about contract Contract Memorandum of Understanding APPLICATION/PDF FR Memorandum of understanding (If agreed by all parties) General Procurement Notice APPLICATION/PDF FR Tender Activity TEXT/HTML FR Activity web page Activity TEXT/HTML FR Activity web page
Planned start date 2018-05-02
Planned end date 2022-12-31
Actual start date 2018-05-08
Actual end date 2023-02-09
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 3 )
PARTICIPATING ORG REFERENCE ROLE TYPE
African Development Fund
Funding Multilateral
Government of Djibouti
Extending Government
Ministère des Finances et de la Planification
Implementing Government
Target Groups
Generally, the main project beneficiaries are the entire population of Djibouti. The project will contribute to: (i) building the first geothermal power plant in Djibouti; (ii) increasing clean energy production capacity; (iii) increasing the population’s access to electricity through a more reliable and affordable source of energy; (iv) reducing oil imports by 214 000 barrels of oil annually; and (v) reducing greenhouse gas emissions by 250 000 tonnes of CO2 annually. Thus, it will contribute to improving the quality of life of Djibouti’s population by improving access to electrical energy.
Les principaux bénéficiaires du projet sont de manière générale l’ensemble de la population Djiboutienne. Le Projet va contribuer à (i) construire la première centrale géothermique de Djibouti, (ii) augmenter la capacité de production d’énergie propre, (iii) augmenter l’accès de la population à l’électricité à travers une source d’énergie plus fiable et à coût plus abordable, (iv) réduire les importations pétrolières de 214000 de baril par an et (v) réduire les émissions de gaz à effet de serre de 250000 de tonnes de CO2 par an. De ce fait, il permettra de contribuer à améliorer la qualité de vie de la population Djiboutienne en améliorant son accès à l’énergie électrique.
Objectives
L'objectif général du programme de développement de la géothermie est d'améliorer la qualité de vie de la population Djiboutienne en améliorant son accès à l’énergie électrique à travers l’augmentation des capacités de production d’énergie propre à Djibouti. Les objectifs spécifiques du Projet sont (i) l’augmentation de la capacité de production d’énergie verte (ii) la réduction des importations pétrolières et (iii) la réduction des émissions de gaz à effet de serre.
The overall objective of the geothermal energy development program is to improve the quality of life for Djibouti's population by increasing access to electricity through an expansion of the national energy production capacity. The specific project objectives are to: (i) increase the green energy generation capacity; (ii) reduce oil imports; and (iii) reduce greenhouse gas emissions.
General
La présente intervention porte sur un prêt supplémentaire d’un montant de 10,74 million UC au Gouvernement de Djibouti pour mener les travaux du Projet d’Exploration Géothermique dans la Région du Lac Assal à leurs termes et en atteindre les objectifs. Ce projet fait partie d’un programme de développement de l’énergie géothermique visant à améliorer la qualité de vie de la population Djiboutienne en facilitant (1) l’augmentation de la capacité de production d’énergie d’origine géothermique (énergie verte), (2) la réduction des importations pétrolières et (3) la réduction des émissions de gaz à effet de serre. Il est prévu pour être exécuté en trois phases : (i) la première phase consiste en l’exploration du champ de vapeur géothermique du lac Assal et la confirmation des caractéristiques de la ressource géothermique du champ; (ii) la deuxième phase comprend le développement du champ géothermique et la construction d’une centrale électrique géothermique d’une capacité de 20 MW; et (iii) la troisième phase consiste en l’extension de cette centrale à 50 MW. Cependant, le budget alloué n’a permis de couvrir que partiellement les coûts de deux forages. En effet, lors de l’appel d’offres pour l’acquisition des services de forage, le budget alloué s’est avéré insuffisant pour couvrir le coût de l’exécution de quatre forages. Le budget alloué n’a permis de couvrir que partiellement les coûts de l’exécution de deux forages au lieu de quatre forages initialement prévus. Les ressources supplémentaires du FAD permettront de combler le déficit budgétaire révélé au cours de l’exécution du Projet et de finaliser la réalisation de la phase d’exploration. Cette opération permettra de couvrir (i) le coût de l’exécution du troisième forage y compris les activités non financées des deux premiers forages, d’un montant prévisionnel de 9,65 MUC (13,95 MUSD) et (ii) les coûts de prestations additionnelles de conseils et la réalisation d'une étude de faisabilité pour un IPP, d’un montant prévisionnel de 1,10 UC (1,58 MUSD), à réaliser par la firme d’assistance technique en géothermie. En apportant son financement supplémentaire, la Banque permettra au Projet de réaliser trois forages au lieu de quatre initialement prévus. Ainsi, la confirmation de la ressource géothermique facilitera la construction d’une centrale électrique géothermique à moyen terme afin d’augmenter les capacités de production d’énergie propre à Djibouti.
The proposed operation involves an additional loan of UA 10.74 million to the Government of Djibouti to carry out the Geothermal Exploration Project in the Lake Assal Region on schedule and achieve its objectives. This project is part of a geothermal energy development programme that aims at improving the quality of life for Djibouti’s population by helping to: (1) increase geothermal energy production capacity (green energy); (2) reduce oil imports; and (3) reduce greenhouse gas emissions. It will be implemented in three phases: (i) Phase 1 comprises the exploration of the Lake Assal geothermal steam field and confirmation of the characteristics of the field’s geothermal resources; (ii) Phase 2 involves the development of the geothermal field and construction of a geothermal power plant with a capacity of 20 MW; and (iii) Phase 3 involves expanding the capacity of the geothermal power plant to 50 MW. However, the budget allocated for the project only covered part of the cost of drilling two wells. Indeed, during the competitive bid call for the procurement of drilling services, the budget allocated were insufficient to cover the cost of drilling four wells. The amount provided covered only part of the cost of drilling two instead of the four wells initially envisaged. The supplementary resources to be provided by the ADF will help to close the financing gap identified during project implementation and to complete the exploration phase. This operation will cover: (i) the cost of drilling the third well, including the non-funded activities of the first two wells, estimated at UA 9.65 million (USD 13.95 million); and (ii) the cost of additional consultancy services and conduct of a feasibility study on the selection of an IPP for an estimated amount of UA 1.09 million (USD 1.58 million) to be carried out by the geothermal technical assistance firm. By providing supplementary financing, the Bank will enable the project to drill three wells instead of the four initially planned. Thus, the confirmation of the geothermal resource will facilitate the construction of a geothermal power plant in the medium term to increase the clean energy production capacity in Djibouti.
recipient country ( 1 )
DjiboutiDJ
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Lake Asal
ID 224969 (Geonames)
TYPE lake LK
11.6644 42.4014 Other Topographical Feature Approximate
country budget items ( 1 )
IATI Withdrawn ( 1 )
The budget identifier reported uses IATI budget identifier categories
3.6.1
100
sector ( 1 )
OECD DAC CRS 5 digit1( 1 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Energy sector policy, planning and administration23111
100
GLOSSARY
Energy sector policy, planning and administrationNo description provided
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 17 )
Interest Payment ( 20 )
Loan Repayment ( 4 )
Budget ( 19 )
Outgoing Commitment
Disbursement
Interest Payment
Loan Repayment
Budget
Budget ( 19 )
START END TYPE STATUS VALUE
2018-05-08 2018-08-08 Original 552,957.933684
XDR
2018-08-08 2018-11-08 Original 552,957.933684
XDR
2018-11-08 2019-02-08 Original 552,957.933684
XDR
2019-02-08 2019-05-08 Original 552,957.933684
XDR
2019-05-08 2019-08-08 Original 552,957.933684
XDR
2019-08-08 2019-11-08 Original 552,957.933684
XDR
2019-11-08 2020-02-08 Original 552,957.933684
XDR
2020-02-08 2020-05-08 Original 552,957.933684
XDR
2020-05-08 2020-08-08 Original 552,957.933684
XDR
2020-08-08 2020-11-08 Original 552,957.933684
XDR
2020-11-08 2021-02-08 Original 552,957.933684
XDR
2021-02-08 2021-05-08 Original 552,957.933684
XDR
2021-05-08 2021-08-08 Original 552,957.933684
XDR
2021-08-08 2021-11-08 Original 552,957.933684
XDR
2021-11-08 2022-02-08 Original 552,957.933684
XDR
2022-02-08 2022-05-08 Original 552,957.933684
XDR
2022-05-08 2022-08-08 Original 552,957.933684
XDR
2022-08-08 2022-11-08 Original 552,957.933684
XDR
2022-11-08 2023-02-09 Original 552,957.933684
XDR
Budget
Transactions ( 42 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2018-05-08
REF 2100150039343
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
10,506,200.74
XDR
Outgoing Commitment
Disbursement ( 17 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2019-01-31
Total Disbursement in January of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
1,860,726.79
XDR
2019-03-31
Total Disbursement in March of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
1,546,418.97
XDR
2019-04-30
Total Disbursement in April of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
2,721,439.1
XDR
2019-05-31
Total Disbursement in May of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
420,051.75
XDR
2019-06-30
Total Disbursement in June of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
10,865.11
XDR
2019-07-31
Total Disbursement in July of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
2,140,100.22
XDR
2019-08-31
Total Disbursement in August of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
147,691.96
XDR
2019-09-30
Total Disbursement in September of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
820,766.15
XDR
2019-10-31
Total Disbursement in October of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
226,705.38
XDR
2019-11-30
Total Disbursement in November of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
271,255.75
XDR
2020-01-31
Total Disbursement in January of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
11,715.87
XDR
2020-02-29
Total Disbursement in February of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
8,627.76
XDR
2020-06-30
Total Disbursement in June of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
6,379.64
XDR
2022-07-31
Total Disbursement in July of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
42,529.29
XDR
2022-11-15
Total Disbursement in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
66,091.97
XDR
2023-02-15
Total Disbursement in February of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
179,070
XDR
2023-03-15
Total Disbursement in March of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
Ministère des Finances et de la Planification
25,765.03
XDR
Disbursement
Interest Payment ( 20 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2019-04-30
Total Interest Repayment in April of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
22,952.34
XDR
2019-10-31
Total Interest Repayment in October of 2019
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
57,076
XDR
2020-04-15
Total Interest Repayment in April of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
20,515.78
XDR
2020-05-15
Total Interest Repayment in May of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
68,510.18
XDR
2020-10-15
Total Interest Repayment in October of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
3,316.19
XDR
2020-10-31
Total Interest Repayment in October of 2020
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
85,260.56
XDR
2021-04-15
Total Interest Repayment in April of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
722.46
XDR
2021-04-30
Total Interest Repayment in April of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
87,484.77
XDR
2021-10-15
Total Interest Repayment in October of 2021
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
87,476.9
XDR
2022-04-30
Total Interest Repayment in April of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
GOUVERMENT DE DJIBOUTI MINISTERE DE L'ECON. DES FIN. ET DE LA PLANIFICATION
90,015.52
XDR
2022-11-15
Total Interest Repayment in November of 2022
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE L'ECON. DES FIN. ET DE LA PLANIFICATION
94,073.06
XDR
2023-04-30
Total Interest Repayment in April of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
59,075.44
XDR
2023-05-31
Total Interest Repayment in May of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
35,476.47
XDR
2023-10-15
Total Interest Repayment in October of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
88,867.5
XDR
2023-10-31
Total Interest Repayment in October of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
5,746.9
XDR
2024-04-15
Total Interest Repayment in April of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
14,060.48
XDR
2024-05-15
Total Interest Repayment in May of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
81,890.89
XDR
2024-11-15
Total Interest Repayment in November of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
92,101.22
XDR
2025-04-15
Total Interest Repayment in April of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
24,846.35
XDR
2025-05-15
Total Interest Repayment in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
68,554.75
XDR
Interest Payment
Loan Repayment ( 4 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2023-10-31
Total Loan Repayment in October of 2023
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
216,823.7
XDR
2024-05-15
Total Loan Repayment in May of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DEL'ECON. DES FIN. ET DE LA PLANIFICATION
219,158.6
XDR
2024-11-15
Total Loan Repayment in November of 2024
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
217,439.58
XDR
2025-05-15
Total Loan Repayment in May of 2025
FLOW ODA 10
AID Project-type interventions C01
FINANCE Standard loan 421
STATUS Untied 5
African Development Fund
GOUVERMENT DE DJIBOUTI MINISTERE DE
222,610.8
XDR
Loan Repayment
result( 15 )
output( 15 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
Output
indicator( 1 )
Audit reports and quarterly activity reports
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Audit reports and quarterly/half-yearly progress reports prepared Audit reports and quarterly / half-yearly progress reports prepared
N/A
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Certification of test results and analyses
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Test results and analyses certified Test results and analyses certified
N/A
2018-01-01 : 2023-12-31
Output
indicator( 1 )
CO2 emission reduced
INDICATOR
Ton/Year
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
250000.0 0.0
0%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Design and management of the drilling project
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Periodic technical reports prepared Periodic technical reports prepared
N/A
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Energy imported from Ethiopia
INDICATOR
MW
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
35.0 35.0
100%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Environmental and Social Management Plan (ESMP) implemented
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Environmental and Social Management Plan implemented Environmental and Social Management Plan implemented
N/A
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Geothermal power capacity
INDICATOR
MW
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
50.0 0.0
0%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Guaranteed electricity generation capacity in MW (% green energy)
INDICATOR
%
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
60.0 36.0
60%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Guaranteed power generation of electricity
INDICATOR
MW
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
185.0 75.0
40%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Jobs created during the works
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
230.0 79.0
34%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Jobs created during the works - of which are for women
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
Not provided
18.0 12.0
66%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Number of wells drilled
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
3.0 3.0
100%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Quantity of oil imported reduced
INDICATOR
Barrel
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
214000.0 0.0
0%
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Well testing protocol
INDICATOR
None
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
Not provided
Testing protocol finalised Testing protocol finalised
N/A
2018-01-01 : 2023-12-31
Output
indicator( 1 )
Women’s association established and equipped
INDICATOR
Number
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
Not provided
1.0 1.0
100%
2018-01-01 : 2023-12-31
African Development Bank
RDGE
Eric PREGNON
Power Engineer, PESD4
African Development Bank Group Headquarters Avenue Joseph Anoma 01 BP 1387 Abidjan 01, Côte d'Ivoire
other identifier( 1 )
REFERENCE IDENTIFIER OWNER ORG IDENTIFIER TYPE DESCRIPTION
46002 XM-DAC-46002
African Development Bank
Previous Reporting Organisation Identifier
CODE B1
No description provided
conditions( 2 )
NARRATIVE TYPE DESCRIPTION
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Policy The condition attached requires a particular policy to be implemented by the recipient
Please see section 5 or 7 : Legal Documentation or Authority or Legal instruments and Authority
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient