ACTIVITY SCOPE | COLLABORATION TYPE | AID TYPE | FINANCE TYPE | FLOW TYPE | TIED STATUS | HIERARCHY |
---|---|---|---|---|---|---|
Multilateral (inflows) 2 |
Project-type interventions C01
|
Untied | 1 |
PARTICIPATING ORG | REFERENCE | ROLE | TYPE |
---|---|---|---|
Argentine Republic
|
REF AR–ORP0053034
|
Accountable | |
International Bank for Reconstruction and Development
|
REF 44001
|
Funding | Multilateral |
International Bank for Reconstruction and Development
|
REF 44001
|
Extending | Multilateral |
National Ministry of Health
|
REF AR–ORP0053033
|
Implementing |
NAME | DESCRIPTION | POSITION | CLASS | REACH | EXACTNESS |
---|---|---|---|---|---|
Buenos Aires
ID 3435910 (Geonames)
|
-34.61315 -58.377232 | Populated Place | Activity | Approximate |
START | END | TYPE | STATUS | VALUE |
---|---|---|---|---|
2023-06-01 | 2023-06-30 | Original | Indicative | 0 USD |
2023-06-01 | 2023-06-30 | Revised | Indicative | 0 USD |
2023-07-01 | 2023-07-31 | Original | Indicative | 11,666,666.67 USD |
2023-07-01 | 2023-07-31 | Revised | Indicative | 11,666,666.67 USD |
2023-08-01 | 2023-08-31 | Original | Indicative | 11,666,666.67 USD |
2023-08-01 | 2023-08-31 | Revised | Indicative | 11,666,666.67 USD |
2023-09-01 | 2023-09-30 | Original | Indicative | 11,666,666.67 USD |
2023-09-01 | 2023-09-30 | Revised | Indicative | 11,666,666.67 USD |
2023-10-01 | 2023-10-31 | Original | Indicative | 11,666,666.67 USD |
2023-10-01 | 2023-10-31 | Revised | Indicative | 11,666,666.67 USD |
2023-11-01 | 2023-11-30 | Original | Indicative | 11,666,666.67 USD |
2023-11-01 | 2023-11-30 | Revised | Indicative | 11,666,666.67 USD |
2023-12-01 | 2023-12-31 | Original | Indicative | 11,666,666.67 USD |
2023-12-01 | 2023-12-31 | Revised | Indicative | 11,666,666.67 USD |
2024-01-01 | 2024-01-31 | Original | Indicative | 11,666,666.67 USD |
2024-01-01 | 2024-01-31 | Revised | Indicative | 11,666,666.67 USD |
2024-02-01 | 2024-02-29 | Original | Indicative | 11,666,666.67 USD |
2024-02-01 | 2024-02-29 | Revised | Indicative | 11,666,666.67 USD |
2024-03-01 | 2024-03-31 | Original | Indicative | 11,666,666.67 USD |
2024-03-01 | 2024-03-31 | Revised | Indicative | 11,666,666.67 USD |
2024-04-01 | 2024-04-30 | Original | Indicative | 11,666,666.67 USD |
2024-04-01 | 2024-04-30 | Revised | Indicative | 11,666,666.67 USD |
2024-05-01 | 2024-05-31 | Original | Indicative | 11,666,666.67 USD |
2024-05-01 | 2024-05-31 | Revised | Indicative | 11,666,666.67 USD |
2024-06-01 | 2024-06-30 | Original | Indicative | 11,666,666.63 USD |
2024-06-01 | 2024-06-30 | Revised | Indicative | 11,666,666.63 USD |
2024-07-01 | 2024-07-31 | Original | Indicative | 3,250,000 USD |
2024-07-01 | 2024-07-31 | Revised | Indicative | 3,250,000 USD |
2024-08-01 | 2024-08-31 | Original | Indicative | 3,250,000 USD |
2024-08-01 | 2024-08-31 | Revised | Indicative | 3,250,000 USD |
2024-09-01 | 2024-09-30 | Original | Indicative | 3,250,000 USD |
2024-09-01 | 2024-09-30 | Revised | Indicative | 3,250,000 USD |
2024-10-01 | 2024-10-31 | Original | Indicative | 3,250,000 USD |
2024-10-01 | 2024-10-31 | Revised | Indicative | 3,250,000 USD |
2024-11-01 | 2024-11-30 | Original | Indicative | 3,250,000 USD |
2024-11-01 | 2024-11-30 | Revised | Indicative | 3,250,000 USD |
2024-12-01 | 2024-12-31 | Original | Indicative | 3,250,000 USD |
2024-12-01 | 2024-12-31 | Revised | Indicative | 3,250,000 USD |
2025-01-01 | 2025-01-31 | Original | Indicative | 3,250,000 USD |
2025-01-01 | 2025-01-31 | Revised | Indicative | 3,250,000 USD |
2025-02-01 | 2025-02-28 | Original | Indicative | 3,250,000 USD |
2025-02-01 | 2025-02-28 | Revised | Indicative | 3,250,000 USD |
2025-03-01 | 2025-03-31 | Original | Indicative | 3,250,000 USD |
2025-03-01 | 2025-03-31 | Revised | Indicative | 3,250,000 USD |
2025-04-01 | 2025-04-30 | Original | Indicative | 3,250,000 USD |
2025-04-01 | 2025-04-30 | Revised | Indicative | 3,250,000 USD |
2025-05-01 | 2025-05-31 | Original | Indicative | 3,250,000 USD |
2025-05-01 | 2025-05-31 | Revised | Indicative | 3,250,000 USD |
2025-06-01 | 2025-06-30 | Original | Indicative | 3,250,000 USD |
2025-06-01 | 2025-06-30 | Revised | Indicative | 3,250,000 USD |
2025-07-01 | 2025-07-31 | Original | Indicative | 8,333,333.33 USD |
2025-07-01 | 2025-07-31 | Revised | Indicative | 8,333,333.33 USD |
2025-08-01 | 2025-08-31 | Original | Indicative | 8,333,333.33 USD |
2025-08-01 | 2025-08-31 | Revised | Indicative | 8,333,333.33 USD |
2025-09-01 | 2025-09-30 | Original | Indicative | 8,333,333.33 USD |
2025-09-01 | 2025-09-30 | Revised | Indicative | 8,333,333.33 USD |
2025-10-01 | 2025-10-31 | Original | Indicative | 8,333,333.33 USD |
2025-10-01 | 2025-10-31 | Revised | Indicative | 8,333,333.33 USD |
2025-11-01 | 2025-11-30 | Original | Indicative | 8,333,333.33 USD |
2025-11-01 | 2025-11-30 | Revised | Indicative | 8,333,333.33 USD |
2025-12-01 | 2025-12-31 | Original | Indicative | 8,333,333.33 USD |
2025-12-01 | 2025-12-31 | Revised | Indicative | 8,333,333.33 USD |
2026-01-01 | 2026-01-31 | Original | Indicative | 8,333,333.33 USD |
2026-01-01 | 2026-01-31 | Revised | Indicative | 8,333,333.33 USD |
2026-02-01 | 2026-02-28 | Original | Indicative | 8,333,333.33 USD |
2026-02-01 | 2026-02-28 | Revised | Indicative | 8,333,333.33 USD |
2026-03-01 | 2026-03-31 | Original | Indicative | 8,333,333.33 USD |
2026-03-01 | 2026-03-31 | Revised | Indicative | 8,333,333.33 USD |
2026-04-01 | 2026-04-30 | Original | Indicative | 8,333,333.33 USD |
2026-04-01 | 2026-04-30 | Revised | Indicative | 8,333,333.33 USD |
2026-05-01 | 2026-05-31 | Original | Indicative | 8,333,333.33 USD |
2026-05-01 | 2026-05-31 | Revised | Indicative | 8,333,333.33 USD |
2026-06-01 | 2026-06-30 | Original | Indicative | 8,333,333.37 USD |
2026-06-01 | 2026-06-30 | Revised | Indicative | 8,333,333.37 USD |
2026-07-01 | 2026-07-31 | Original | Indicative | 3,500,000 USD |
2026-07-01 | 2026-07-31 | Revised | Indicative | 3,500,000 USD |
2026-08-01 | 2026-08-31 | Original | Indicative | 3,500,000 USD |
2026-08-01 | 2026-08-31 | Revised | Indicative | 3,500,000 USD |
2026-09-01 | 2026-09-30 | Original | Indicative | 3,500,000 USD |
2026-09-01 | 2026-09-30 | Revised | Indicative | 3,500,000 USD |
2026-10-01 | 2026-10-31 | Original | Indicative | 3,500,000 USD |
2026-10-01 | 2026-10-31 | Revised | Indicative | 3,500,000 USD |
2026-11-01 | 2026-11-30 | Original | Indicative | 3,500,000 USD |
2026-11-01 | 2026-11-30 | Revised | Indicative | 3,500,000 USD |
2026-12-01 | 2026-12-31 | Original | Indicative | 3,500,000 USD |
2026-12-01 | 2026-12-31 | Revised | Indicative | 3,500,000 USD |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2023-06-30 |
Total Commitment in June Month of 2023
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
300,000,000 USD |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2023-09-30 |
Total Disbursement in September Month of 2023
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
750,000 USD |
|
2023-10-31 |
Total Disbursement in October Month of 2023
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
40,000,000 USD |
|
2024-10-31 |
Total Disbursement in October Month of 2024
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
48,958,327 USD |
DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
---|---|---|---|---|
2023-09-30 |
Total Interest Repayment in September Month of 2023
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
-750,000 USD |
|
2024-01-31 |
Total Interest Repayment in January Month of 2024
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
-718,109 USD |
|
2024-07-31 |
Total Interest Repayment in July Month of 2024
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
-1,806,264 USD |
|
2025-01-31 |
Total Interest Repayment in January Month of 2025
FLOW OOF Withdrawn
20
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
International Bank for Reconstruction and Development
REF 44001
|
-2,472,102 USD |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
1900 Not provided
|
Not provided
|
Not provided
|
N/A |
1900-01-01 : 1900-01-01 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
12.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
12.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
16,000.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
16,000.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
18.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
18.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
2,500.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
2,500.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
24.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
24.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
34.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
5.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
5.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
60.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
60.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
85.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
85.00 | 0.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 0.00 |
34.00 | 13 |
38%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 1,400.00 |
2,500.00 | 1,724.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 1,400.00 |
2,500.00 | 1,724.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 12.89 |
40.00 | 12.89 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 12.89 |
40.00 | 34.97 |
81%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 176,329.00 |
484,120.00 | 155932 |
100%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 176,329.00 |
484,120.00 | 354223 |
100%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 23.00 |
40.00 | 23.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 23.00 |
40.00 | 80 |
100%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 70.00 |
90.00 | 70.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 70.00 |
90.00 | 70.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 74.00 |
85.00 | 95.2 |
100%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 74.00 |
85.00 | 95.2 |
100%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 796.00 |
3,000.00 | 442 |
44%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Unit | Unit | ||||
No dimension has been provided
No location has been provided
|
2023 796.00 |
3,000.00 | 5284 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Qualitative | Qualitative | ||||
No dimension has been provided
No location has been provided
|
2023 No |
Yes | No | N/A |
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Qualitative | Qualitative | ||||
No dimension has been provided
No location has been provided
|
2023 No |
Yes | YES | N/A |
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 35.00 |
45.00 | 35.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 35.00 |
45.00 | 35.00 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 47.70 |
56.00 | 47.70 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Percentage | Percentage | ||||
No dimension has been provided
No location has been provided
|
2023 47.70 |
56.00 | 47.70 |
0%
|
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Qualitative | Qualitative | ||||
No dimension has been provided
No location has been provided
|
2023 No |
Yes | No | N/A |
2023-06-16 : 2026-06-16 |
FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
---|---|---|---|---|---|
Qualitative | Qualitative | ||||
No dimension has been provided
No location has been provided
|
2023 No |
Yes | No | N/A |
2023-06-16 : 2026-06-16 |
NARRATIVE | TYPE | DESCRIPTION |
---|---|---|
Schedule 2, Section I.A (Program Institutions). The Borrower, through MSN, shall be responsible for the overall implementationand oversight of the Program. To this end, the Borrower, through MSN, shall maintain within SES, throughout Program implementation,a technical and operational coordination team with a structure, functions, and responsibilities acceptable to the Bank, as setforth in the POM, including, inter alia: (a) the DNFSP, which shall be responsible for coordinating the Program activities throughMSN's different secretariats, directorates, and centers, including monitoring compliance with the data to be reported for theDLIs/DLRs; and(b) the SGA, which shall be responsible for the Program's budget management, procurement, and financial managementactivities.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
Schedule 2, Section I.B. (Participation Agreements)1. Prior to carrying out activities with a Participating Province under theProgram, the Borrower, through MSN, shall enter into an agreement with each of the Participating Provinces (“ParticipationAgreement”), which shall include, inter alia, the Participating Province's obligations to carry out the National Integrated HealthPlan in accordance with its guidelines and instructions, which shall include the obligations related to the Program, including,inter alia, the ones set forth in the POM, the PAP, and the Anti-corruption Guidelines.2. The Borrower, through the MSN, shallcause each Participating Province to exercise its rights under each Participation Agreement in such manner as to protect theinterests of the Borrower and the Bank and to accomplish the purposes of the Loan. Except as the Bank shall otherwise agree, theBorrower, through the MSN, shall not assign, amend, abrogate, or waive the abovementioned obligations related to the Program.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
Schedule 2, Section I.C (Program Operational Manual) 1. The Borrower, through MSN, shall carry out the Program in accordance withthe provisions set forth in the Program Operational Manual (“POM”), which shall include, inter alia: (a) the Program Action Plan;(b) the fiduciary, environmental, and social systems for the Program; (c) the DLIs/DLRs, the Verification Protocol for theDLIs/DLRs, and the results monitoring framework; and (d) the functions, responsibilities, and composition of implementation teamswithin MSN, in charge of Program implementation, including their obligation to comply with the ESCP and the Anti-CorruptionGuidelines.2. Except as the Bank may otherwise agree in writing, the Borrower, through MSN, shall not abrogate, amend, suspend,waive, or otherwise fail to enforce the POM or any provision thereof. In case of any conflict between the terms of the POM and thisAgreement, the provisions of this Agreement shall prevail.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
Schedule 2, Section I.D (Verification Arrangements)1. The Borrower, through MSN, shall appoint and maintain, throughout Programimplementation, a verification agent for the Program acceptable to the Bank, in accordance with the terms of reference acceptableto the Bank. 2. The Borrower, through MSN, shall ensure that the verification agent referred to in the preceding paragraph shall:(a) verify the data and other evidence supporting the achievement(s) of one or more DLRs and recommend corresponding payments to bemade in accordance with the Verification Protocol; and (b) submit to MSN the corresponding verification reports in a timely mannerand in form and substance satisfactory to the Bank.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
Schedule 2, Section I.E (Program Action Plan)1. The Borrower, through MSN, shall: (a) undertake the actions set forth in theProgram Action Plan in a manner satisfactory to the Bank; (b) except as the Bank and the Borrower, through MSN, shall otherwiseagree in writing not to assign, amend, abrogate, or waive, or permit to be assigned, amended, abrogated, or waived, the ProgramAction Plan, or any provision thereof; and (c) maintain policies and procedures adequate to enable it to monitor and evaluate, inaccordance with guidelines acceptable to the Bank, the implementation of the Program Action Plan.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
Schedule 2, Section IV.B (Withdrawal Conditions)1. No withdrawal shall be made:(a) on the basis of DLRs achieved prior to theSignature Date, except that withdrawals up to an aggregate amount not to exceed USD 50,000,000 may be made on the basis of DLRsachieved prior to this date but on or after October 31, 2022; and (b) for any DLR under Categories (1) to (9) until and unless theBorrower, through MSN, has furnished evidence satisfactory to the Bank that said DLR has been achieved.2. Notwithstanding theprovisions of Part B.1(b) of this Section, the Borrower, through MSN, may withdraw: (i) an amount not to exceed USD 40,000,000 asan advance, provided, however, that if the DLRs in the opinion of the Bank, are not achieved (or only partially achieved) by theClosing Date, the Borrower, through MSN, shall refund such advance (or portion of such advance as determined by the Bank inaccordance with the scalability formulas (i.e., proportional amount) set forth in Schedule 4 of this Agreement, when applicable) tothe Bank promptly upon notice thereof by the Bank. Except as otherwise agreed with the Borrower, the Bank shall cancel the amountso refunded. Any further withdrawals requested as an advance under any Category shall be permitted only on such terms andconditions as the Bank shall specify by notice to the Borrower.3. Notwithstanding the provisions of Part B.1 (b) of this Section,if any of the DLRs under Categories (1) through (9) has not been achieved by the date by which the said DLR is set to be achieved(or such later date as the Bank has established by notice to the Borrower, through MSN, the Bank may, by notice to the Borrower:(a) except for Non-Scalable DLRs, authorize the withdrawal of such amount of the unwithdrawn proceeds of the Loan then allocated tosaid Category which, in the opinion of the Bank, corresponds to the extent of achievement of said DLR (Scalable DLRs), such amountto be calculated in accordance with the formula (i.e., proportional amount) set out in the Schedule 4 of this Agreement; (b) onlyfor Non-Scalable DLRs, withhold the allocated for the unmet DLR(s) and, at its sole discretion, may authorize, at a later date, thefull release of the amounts so withheld, if and when the Bank is satisfied that the respective DLR(s) has/have been achieved; (c)reallocate all or a portion of the proceeds of the Loan allocated to any DLR to any other DLR within the same DLI; and/or (d)cancel all or a portion of the proceeds of the Loan then allocated to said DLR.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |