ACTIVITY TITLE
Guyana Strengthening Human Capital through Education Project
Reported by
World Bank 44000 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Multilateral (inflows) 2
Project-type interventions C01
Untied 1
DOCUMENTS ( 15 )
Environmental and Social Commitment Plan APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Commitment Plan APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Commitment Plan APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Commitment Plan APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Management Plan APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Review Summary APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Review Summary APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Environmental and Social Review Summary APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Project Appraisal Document APPLICATION/PDF Pre- and post-project impact appraisal Objectives / Purpose of activity Intended ultimate beneficiaries Budget Project Information Document APPLICATION/PDF Objectives / Purpose of activity Intended ultimate beneficiaries Budget Financing Agreement APPLICATION/PDF Objectives / Purpose of activity Conditions Budget Summary information about contract Memorandum of understanding (If agreed by all parties) Implementation Status and Results Report APPLICATION/PDF Review of project performance and evaluation Results, outcomes and outputs Procurement Notices TEXT/HTML Tender Contract Awards TEXT/HTML Contract Project URL TEXT/HTML Activity web page
Planned start date 2022-04-28
Planned end date 2027-06-30
Actual start date 2022-06-10
Actual end date 2027-06-30
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 4 )
PARTICIPATING ORG REFERENCE ROLE TYPE
Co-operative Republic of Guyana
Accountable
International Development Association
REF 44002
Funding Multilateral
International Development Association
REF 44002
Extending Multilateral
Ministry of Education
Implementing
Objectives
The Project Development Objective (PDO) is to improve: (i) access and learning conditions in secondary education; and (ii) access to technical and vocational education and training aligned with identified labor market needs.
General
recipient country ( 1 )
GuyanaGY
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Guyana
ID 0003378535 (Geonames)
5 -59 Administrative Region Activity Approximate
sector ( 23 )
Reporting Organisation99( 3 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity
FY17 - Secondary Education ES
80
FY17 - Workforce Development and Vocational Education EW
16
FY17 - Public Administration - Education EF
4
Reporting Organisation 298( 20 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity (if they are referencing more than one)
Education 000065
100
Gender 000061
100
Access to Education 000651
84
Education Facilities 000658
84
ICT Solutions 000261
73
ICT 000026
73
Education Financing 000652
57
Standards, Curriculum and Textbooks 000657
43
Education Governance, School-Based Management 000656
36
Teachers 000654
32
Active Labor Market Programs 000663
20
Labor Market Policy and Programs 000066
20
Skills Development 000661
20
Disaster Risk Management 000075
17
Flood and Drought Risk Management 000754
17
Climate change 000081
16
Job Creation 000221
9
Jobs 000022
9
Adaptation 000812
8
Mitigation 000811
8
capital spend
The percentage of the total commitment that is for capital spending
100
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 3 )
Interest Payment ( 4 )
Budget ( 136 )
Outgoing Commitment
Disbursement
Interest Payment
Budget
Budget ( 136 )
START END TYPE STATUS VALUE
2022-05-01 2022-05-31 Original Indicative 0
USD
2022-05-01 2022-05-31 Revised Indicative 0
USD
2022-06-01 2022-06-30 Original Indicative 0
USD
2022-06-01 2022-06-30 Revised Indicative 0
USD
2022-07-01 2022-07-31 Original Indicative 0
USD
2022-07-01 2022-07-31 Revised Indicative 0
USD
2022-08-01 2022-08-31 Original Indicative 460,000
USD
2022-08-01 2022-08-31 Revised Indicative 460,000
USD
2022-09-01 2022-09-30 Original Indicative 300,000
USD
2022-09-01 2022-09-30 Revised Indicative 300,000
USD
2022-10-01 2022-10-31 Original Indicative 600,000
USD
2022-10-01 2022-10-31 Revised Indicative 600,000
USD
2022-11-01 2022-11-30 Original Indicative 600,000
USD
2022-11-01 2022-11-30 Revised Indicative 600,000
USD
2022-12-01 2022-12-31 Original Indicative 610,000
USD
2022-12-01 2022-12-31 Revised Indicative 610,000
USD
2023-01-01 2023-01-31 Original Indicative 310,000
USD
2023-01-01 2023-01-31 Revised Indicative 310,000
USD
2023-02-01 2023-02-28 Original Indicative 620,000
USD
2023-02-01 2023-02-28 Revised Indicative 620,000
USD
2023-03-01 2023-03-31 Original Indicative 620,000
USD
2023-03-01 2023-03-31 Revised Indicative 620,000
USD
2023-04-01 2023-04-30 Original Indicative 310,000
USD
2023-04-01 2023-04-30 Revised Indicative 310,000
USD
2023-05-01 2023-05-31 Original Indicative 630,000
USD
2023-05-01 2023-05-31 Revised Indicative 630,000
USD
2023-06-01 2023-06-30 Original Indicative 630,000
USD
2023-06-01 2023-06-30 Revised Indicative 630,000
USD
2023-07-01 2023-07-31 Original Indicative 630,000
USD
2023-07-01 2023-07-31 Revised Indicative 630,000
USD
2023-08-01 2023-08-31 Original Indicative 320,000
USD
2023-08-01 2023-08-31 Revised Indicative 320,000
USD
2023-09-01 2023-09-30 Original Indicative 630,000
USD
2023-09-01 2023-09-30 Revised Indicative 630,000
USD
2023-10-01 2023-10-31 Original Indicative 630,000
USD
2023-10-01 2023-10-31 Revised Indicative 630,000
USD
2023-11-01 2023-11-30 Original Indicative 620,000
USD
2023-11-01 2023-11-30 Revised Indicative 620,000
USD
2023-12-01 2023-12-31 Original Indicative 300,000
USD
2023-12-01 2023-12-31 Revised Indicative 300,000
USD
2024-01-01 2024-01-31 Original Indicative 630,000
USD
2024-01-01 2024-01-31 Revised Indicative 630,000
USD
2024-02-01 2024-02-29 Original Indicative 750,000
USD
2024-02-01 2024-02-29 Revised Indicative 750,000
USD
2024-03-01 2024-03-31 Original Indicative 420,000
USD
2024-03-01 2024-03-31 Revised Indicative 420,000
USD
2024-04-01 2024-04-30 Original Indicative 830,000
USD
2024-04-01 2024-04-30 Revised Indicative 830,000
USD
2024-05-01 2024-05-31 Original Indicative 820,000
USD
2024-05-01 2024-05-31 Revised Indicative 820,000
USD
2024-06-01 2024-06-30 Original Indicative 820,000
USD
2024-06-01 2024-06-30 Revised Indicative 820,000
USD
2024-07-01 2024-07-31 Original Indicative 410,000
USD
2024-07-01 2024-07-31 Revised Indicative 410,000
USD
2024-08-01 2024-08-31 Original Indicative 820,000
USD
2024-08-01 2024-08-31 Revised Indicative 820,000
USD
2024-09-01 2024-09-30 Original Indicative 830,000
USD
2024-09-01 2024-09-30 Revised Indicative 830,000
USD
2024-10-01 2024-10-31 Original Indicative 850,000
USD
2024-10-01 2024-10-31 Revised Indicative 850,000
USD
2024-11-01 2024-11-30 Original Indicative 430,000
USD
2024-11-01 2024-11-30 Revised Indicative 430,000
USD
2024-12-01 2024-12-31 Original Indicative 880,000
USD
2024-12-01 2024-12-31 Revised Indicative 880,000
USD
2025-01-01 2025-01-31 Original Indicative 910,000
USD
2025-01-01 2025-01-31 Revised Indicative 910,000
USD
2025-02-01 2025-02-28 Original Indicative 470,000
USD
2025-02-01 2025-02-28 Revised Indicative 470,000
USD
2025-03-01 2025-03-31 Original Indicative 910,000
USD
2025-03-01 2025-03-31 Revised Indicative 910,000
USD
2025-04-01 2025-04-30 Original Indicative 920,000
USD
2025-04-01 2025-04-30 Revised Indicative 920,000
USD
2025-05-01 2025-05-31 Original Indicative 920,000
USD
2025-05-01 2025-05-31 Revised Indicative 920,000
USD
2025-06-01 2025-06-30 Original Indicative 460,000
USD
2025-06-01 2025-06-30 Revised Indicative 460,000
USD
2025-07-01 2025-07-31 Original Indicative 1,050,000
USD
2025-07-01 2025-07-31 Revised Indicative 1,050,000
USD
2025-08-01 2025-08-31 Original Indicative 1,320,000
USD
2025-08-01 2025-08-31 Revised Indicative 1,320,000
USD
2025-09-01 2025-09-30 Original Indicative 650,000
USD
2025-09-01 2025-09-30 Revised Indicative 650,000
USD
2025-10-01 2025-10-31 Original Indicative 1,250,000
USD
2025-10-01 2025-10-31 Revised Indicative 1,250,000
USD
2025-11-01 2025-11-30 Original Indicative 1,190,000
USD
2025-11-01 2025-11-30 Revised Indicative 1,190,000
USD
2025-12-01 2025-12-31 Original Indicative 1,170,000
USD
2025-12-01 2025-12-31 Revised Indicative 1,170,000
USD
2026-01-01 2026-01-31 Original Indicative 580,000
USD
2026-01-01 2026-01-31 Revised Indicative 580,000
USD
2026-02-01 2026-02-28 Original Indicative 1,150,000
USD
2026-02-01 2026-02-28 Revised Indicative 1,150,000
USD
2026-03-01 2026-03-31 Original Indicative 1,150,000
USD
2026-03-01 2026-03-31 Revised Indicative 1,150,000
USD
2026-04-01 2026-04-30 Original Indicative 1,150,000
USD
2026-04-01 2026-04-30 Revised Indicative 1,150,000
USD
2026-05-01 2026-05-31 Original Indicative 570,000
USD
2026-05-01 2026-05-31 Revised Indicative 570,000
USD
2026-06-01 2026-06-30 Original Indicative 1,150,000
USD
2026-06-01 2026-06-30 Revised Indicative 1,150,000
USD
2026-07-01 2026-07-31 Original Indicative 1,150,000
USD
2026-07-01 2026-07-31 Revised Indicative 1,150,000
USD
2026-08-01 2026-08-31 Original Indicative 580,000
USD
2026-08-01 2026-08-31 Revised Indicative 580,000
USD
2026-09-01 2026-09-30 Original Indicative 1,160,000
USD
2026-09-01 2026-09-30 Revised Indicative 1,160,000
USD
2026-10-01 2026-10-31 Original Indicative 1,160,000
USD
2026-10-01 2026-10-31 Revised Indicative 1,160,000
USD
2026-11-01 2026-11-30 Original Indicative 1,170,000
USD
2026-11-01 2026-11-30 Revised Indicative 1,170,000
USD
2026-12-01 2026-12-31 Original Indicative 590,000
USD
2026-12-01 2026-12-31 Revised Indicative 590,000
USD
2027-01-01 2027-01-31 Original Indicative 1,180,000
USD
2027-01-01 2027-01-31 Revised Indicative 1,180,000
USD
2027-02-01 2027-02-28 Original Indicative 1,180,000
USD
2027-02-01 2027-02-28 Revised Indicative 1,180,000
USD
2027-03-01 2027-03-31 Original Indicative 1,550,000
USD
2027-03-01 2027-03-31 Revised Indicative 1,550,000
USD
2027-04-01 2027-04-30 Original Indicative 0
USD
2027-04-01 2027-04-30 Revised Indicative 0
USD
2027-05-01 2027-05-31 Original Indicative 0
USD
2027-05-01 2027-05-31 Revised Indicative 0
USD
2027-06-01 2027-06-30 Original Indicative 0
USD
2027-06-01 2027-06-30 Revised Indicative 0
USD
2027-07-01 2027-07-31 Original Indicative 0
USD
2027-07-01 2027-07-31 Revised Indicative 0
USD
2027-08-01 2027-08-31 Original Indicative 0
USD
2027-08-01 2027-08-31 Revised Indicative 0
USD
2027-09-01 2027-09-30 Original Indicative 0
USD
2027-09-01 2027-09-30 Revised Indicative 0
USD
2027-10-01 2027-10-31 Original Indicative 0
USD
2027-10-01 2027-10-31 Revised Indicative 0
USD
2027-11-01 2027-11-30 Original Indicative 0
USD
2027-11-01 2027-11-30 Revised Indicative 0
USD
2027-12-01 2027-12-31 Original Indicative 0
USD
2027-12-01 2027-12-31 Revised Indicative 0
USD
Budget
Transactions ( 8 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2022-06-30
Total Commitment in June Month of 2022
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
44,000,000
USD
Outgoing Commitment
Disbursement ( 3 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2022-12-31
Total Disbursement in December Month of 2022
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
10,062,802
USD
2024-02-29
Total Disbursement in February Month of 2024
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
7,218,642
USD
2025-02-28
Total Disbursement in February Month of 2025
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
542,170
USD
Disbursement
Interest Payment ( 4 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2023-06-30
Total Interest Repayment in June Month of 2023
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-35,477
USD
2023-12-31
Total Interest Repayment in December Month of 2023
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-37,360
USD
2024-06-30
Total Interest Repayment in June Month of 2024
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-54,208
USD
2024-12-31
Total Interest Repayment in December Month of 2024
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-64,245
USD
Interest Payment
result( 24 )
output( 20 )
outcome( 4 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
OutcomeResults of the activity that produce an effect on the overall communities or issues you serve. For example lower rate of infection after a vaccination programme.
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Teachers trained and having benefitted from CPD including at least one coaching and mentoring session
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
1,928.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Principals having benefitted from capacity building and leadership training
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
100.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Secondary TVET teachers benefitting from a professional development activity
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
100.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Secondary TVET curricula and related materials reviewed and updated to include socio-emotional competences
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
15.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
New or existing post-secondary TVET programs in priority areas developed or upgraded and implemented
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
20.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Teachers recruited or trained
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
2068.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Post-Secondary TVET teachers benefitting from a professional development activity
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
40.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Climate – Inclusiveness. Schools built or rehabilitated according to minimum quality standards
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
6.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Students benefiting from direct interventions to enhance learning
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
64344.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Share of students from grade 7 to 9 receiving the set of core textbooks
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2022
0.00
80.00 0.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Gender: regions reaching gender parity in survival rates to grade 9
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
5.00
8.00 5.00
0%
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
CTVET reform implemented
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
CTVET only covers TVET institutions under MOE
CTVET reform implemented and CTVET staff trained Draft regulations completed in 2023
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Rapid labor market survey results and reports are available and publicly disclosed
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
Concept and methodology to be prepared during the first year of project implementation
Findings from previous surveys are available. The draft labor market study has been completed
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
New TVET sector policy implemented
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
Current TVET policy expired in 2021
TVET sector policy implemented TVET Policy completed in April 2024
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Integrated digital platform on training opportunities operational
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
Digital Platform on training opportunities is not available
Digital Platform on training opportunities is operationnal Work is ongoing for the integrated digital platform on training opportunities
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Comprehensive education facilities strategy implemented
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
Last strategy dated 2009 – Existence of tools but no comprehensive strategy
Strategy implemented Draft strategy was submitted in December 2023
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Community Engagement: Survey of participant satisfaction administered, and feedback addressed
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
No survey undertaken
Feedback from the survey integrated in teacher training and coaching programsFeedback from the survey integrated in teacher and trainers’ professional development activities No survey undertaken
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Availability and use of an Early Warning System to combat dropout at the secondary level
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
No system available
EWS system operational and training implemented for teachers on use and guidance/counseling activities The Early Warning System (EWS) is operational, the associated training is developed, and the EWS is used in at least 100 schools.
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
Tracer study results are available and published
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
No tracer study available
Findings from previous surveys are available. The tracer study has been completed and is to be published
N/A
2022-06-30 : 2027-06-30
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
TVET Management Information System, linked to the EMIS, is operational
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
TVET data are not integrated in the EMIS
TVET-MIS operational. Relevant data published Work is ongoing for the TVET MIS
N/A
2022-06-30 : 2027-06-30
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
Youths completing a new or enhanced TVET program in priority sectors
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
3,600.00 0.00
0%
2022-06-30 : 2027-06-30
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
Students enrolled in enhanced General Secondary Schools
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2022
0.00
4,000.00 0.00
0%
2022-06-30 : 2027-06-30
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
Improved survival rates to Grade 9
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2022
0.90
0.93 0.92
66%
2022-06-30 : 2027-06-30
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
Share of secondary school teachers meeting standards in student-centered teaching practices (using Teach at the secondary level)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
Baseline to be established
Baseline + 20 percentage points Baseline to be established
N/A
2022-06-30 : 2027-06-30
General Enquiries
The World Bank
Lauren Justine Marston
+1-202-473-1000
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
conditions( 3 )
NARRATIVE TYPE DESCRIPTION
Schedule 2, Section I. A.1. The MOE shall Establish no later than one month after the Effective Date and maintain throughout theperiod of Project implementation, a Project Implementation Unit (PIU) within MOE.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Schedule 2. Section I. D.1. In order to ensure the proper implementation of contingent emergency response activities under Part 3of the Project (“Emergency Response Part”), the Recipient shall: (a) prepare and furnish to the Association for its review andapproval, a Contingency Emergency Response Manual (“CER Manual”); (b) afford the Association a reasonable opportunity to review theproposed CER Manual; (c) promptly adopt the CER Manual for the Emergency Response Part as accepted by the Association and integrateit as an annex to the Project Operations Manual; (d) ensure that the Emergency Response Part is carried out in accordance with theCER Manual; provided, however, that in the event of any inconsistency between the provisions of the CER Manual and this Agreement,the provisions of this Agreement shall prevail; and (e) not amend, suspend, abrogate, repeal or waive any provision of the CERManual without the prior written approval by the Association.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Schedule 2. Section I. D.2. The Recipient shall, throughout the implementation of the Emergency Response Part, maintain theinstitutional structures and arrangements established in accordance with the CER Manual, with adequate staff and resourcessatisfactory to the Association; and undertake no activities unless and until the CER related conditions described below have beenmet in respect of the activities outlined in the referenced Schedule.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient