ACTIVITY TITLE
China Plastic Waste Reduction Project (Shaanxi)
Reported by
World Bank 44000 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Multilateral (inflows) 2
Project-type interventions C01
Untied 1
Planned start date 2022-11-25
Planned end date 2029-12-31
Actual start date 2023-03-23
Actual end date 2029-12-31
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 4 )
PARTICIPATING ORG REFERENCE ROLE TYPE
International Bank for Reconstruction and Development
REF 44001
Funding Multilateral
International Bank for Reconstruction and Development
REF 44001
Extending Multilateral
People's Republic of China
Accountable
Provincial Development and Reform Commission
Implementing
General
The project is the second one in a program of World Bank lending to reduce plastic waste leakage in China, with an expansion of engagement to the under-served rural areas compared with the urban focus of phase one. The project will inform plastic waste management at the national level, strengthen subnational MSW institution towards better integrated rural-urban MSW management and service provision, through policy, technical, and knowledge assistance. The project will also invest in the improvements to below county-level MSW management systems (collection, transfer, sorting, recycling, treatment) in under-served rural areas, to enhance waste service delivery, plastic pollution control, and waste diversion from landfilling. Given the long-term demand and significant disparities in the China's vast rural areas, the success of the project will rely on the cross-departmental coordination by the provincial government, and the policy/technical dialogue between the national and subnational authorities to create an enabling and corrective environment for reform, experiment, and innovation.
Objectives
To reduce plastic pollution from municipal solid waste in selected under-served rural areas of Shaanxi Province, improve provincial plastic waste management, and draw lessons on plastic waste management relevant at the national level.
recipient country ( 1 )
ChinaCN
100
LOCATION ( 12 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
ID 0001796480 (Geonames)
36 109 Administrative Region Activity Approximate
Pucheng Xian
ID 0001798528 (Geonames)
34.96219 109.66063 Administrative Region Activity Approximate
Nanzheng Xian
ID 0001799555 (Geonames)
32.89722 106.89917 Administrative Region Activity Approximate
Jingyang Xian
ID 0001805555 (Geonames)
34.57361 108.76306 Administrative Region Activity Approximate
Fengxiang
ID 0001811198 (Geonames)
34.52417 107.39 Administrative Region Activity Approximate
Chengcheng Xian
ID 0001815300 (Geonames)
35.275 109.81444 Administrative Region Activity Approximate
Baishui Xian
ID 0001817355 (Geonames)
35.22222 109.51722 Administrative Region Activity Approximate
Weibin Qu
ID 0006599416 (Geonames)
34.28548 107.08801 Administrative Region Activity Approximate
Jintai Qu
ID 0006599417 (Geonames)
34.42429 107.09712 Administrative Region Activity Approximate
Chencang Qu
ID 0006599418 (Geonames)
34.30611 107.3875 Administrative Region Activity Approximate
Linwei Qu
ID 0007577125 (Geonames)
34.51661 109.51034 Administrative Region Activity Approximate
Hanbin
ID 0009165898 (Geonames)
32.88972 108.90444 Administrative Region Activity Approximate
sector ( 13 )
Reporting Organisation99( 3 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity
FY17 - Waste Management WB
89
FY17 - Other Agriculture, Fishing and Forestry AZ
10
FY17 - Public Administration - Water, Sanitation and Waste Management WF
1
Reporting Organisation 298( 10 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity (if they are referencing more than one)
Municipal Institution Building 000437
100
Public Administration 000043
100
Rural Development 000072
100
Rural Infrastructure and service delivery 000723
100
Environmental Health and Pollution Management 000082
96
Soil Pollution 000823
96
Urban Development 000071
96
Urban Infrastructure and Service Delivery 000711
96
Climate change 000081
49
Mitigation 000811
49
capital spend
The percentage of the total commitment that is for capital spending
100
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 1 )
Interest Payment ( 2 )
Budget ( 176 )
Outgoing Commitment
Disbursement
Interest Payment
Budget
Budget ( 176 )
START END TYPE STATUS VALUE
2023-02-01 2023-02-28 Original Indicative 0
USD
2023-02-01 2023-02-28 Revised Indicative 0
USD
2023-03-01 2023-03-31 Original Indicative 0
USD
2023-03-01 2023-03-31 Revised Indicative 0
USD
2023-04-01 2023-04-30 Original Indicative 0
USD
2023-04-01 2023-04-30 Revised Indicative 0
USD
2023-05-01 2023-05-31 Original Indicative 0
USD
2023-05-01 2023-05-31 Revised Indicative 0
USD
2023-06-01 2023-06-30 Original Indicative 0
USD
2023-06-01 2023-06-30 Revised Indicative 0
USD
2023-07-01 2023-07-31 Original Indicative 833,333.33
USD
2023-07-01 2023-07-31 Revised Indicative 833,333.33
USD
2023-08-01 2023-08-31 Original Indicative 833,333.33
USD
2023-08-01 2023-08-31 Revised Indicative 833,333.33
USD
2023-09-01 2023-09-30 Original Indicative 833,333.33
USD
2023-09-01 2023-09-30 Revised Indicative 833,333.33
USD
2023-10-01 2023-10-31 Original Indicative 833,333.33
USD
2023-10-01 2023-10-31 Revised Indicative 833,333.33
USD
2023-11-01 2023-11-30 Original Indicative 833,333.33
USD
2023-11-01 2023-11-30 Revised Indicative 833,333.33
USD
2023-12-01 2023-12-31 Original Indicative 833,333.33
USD
2023-12-01 2023-12-31 Revised Indicative 833,333.33
USD
2024-01-01 2024-01-31 Original Indicative 833,333.33
USD
2024-01-01 2024-01-31 Revised Indicative 833,333.33
USD
2024-02-01 2024-02-29 Original Indicative 833,333.33
USD
2024-02-01 2024-02-29 Revised Indicative 833,333.33
USD
2024-03-01 2024-03-31 Original Indicative 833,333.33
USD
2024-03-01 2024-03-31 Revised Indicative 833,333.33
USD
2024-04-01 2024-04-30 Original Indicative 833,333.33
USD
2024-04-01 2024-04-30 Revised Indicative 833,333.33
USD
2024-05-01 2024-05-31 Original Indicative 833,333.33
USD
2024-05-01 2024-05-31 Revised Indicative 833,333.33
USD
2024-06-01 2024-06-30 Original Indicative 833,333.37
USD
2024-06-01 2024-06-30 Revised Indicative 833,333.37
USD
2024-07-01 2024-07-31 Original Indicative 2,097,500
USD
2024-07-01 2024-07-31 Revised Indicative 2,097,500
USD
2024-08-01 2024-08-31 Original Indicative 2,097,500
USD
2024-08-01 2024-08-31 Revised Indicative 2,097,500
USD
2024-09-01 2024-09-30 Original Indicative 2,097,500
USD
2024-09-01 2024-09-30 Revised Indicative 2,097,500
USD
2024-10-01 2024-10-31 Original Indicative 2,097,500
USD
2024-10-01 2024-10-31 Revised Indicative 2,097,500
USD
2024-11-01 2024-11-30 Original Indicative 2,097,500
USD
2024-11-01 2024-11-30 Revised Indicative 2,097,500
USD
2024-12-01 2024-12-31 Original Indicative 2,097,500
USD
2024-12-01 2024-12-31 Revised Indicative 2,097,500
USD
2025-01-01 2025-01-31 Original Indicative 2,097,500
USD
2025-01-01 2025-01-31 Revised Indicative 2,097,500
USD
2025-02-01 2025-02-28 Original Indicative 2,097,500
USD
2025-02-01 2025-02-28 Revised Indicative 2,097,500
USD
2025-03-01 2025-03-31 Original Indicative 2,097,500
USD
2025-03-01 2025-03-31 Revised Indicative 2,097,500
USD
2025-04-01 2025-04-30 Original Indicative 2,097,500
USD
2025-04-01 2025-04-30 Revised Indicative 2,097,500
USD
2025-05-01 2025-05-31 Original Indicative 2,097,500
USD
2025-05-01 2025-05-31 Revised Indicative 2,097,500
USD
2025-06-01 2025-06-30 Original Indicative 2,097,500
USD
2025-06-01 2025-06-30 Revised Indicative 2,097,500
USD
2025-07-01 2025-07-31 Original Indicative 3,250,000
USD
2025-07-01 2025-07-31 Revised Indicative 3,250,000
USD
2025-08-01 2025-08-31 Original Indicative 3,250,000
USD
2025-08-01 2025-08-31 Revised Indicative 3,250,000
USD
2025-09-01 2025-09-30 Original Indicative 3,250,000
USD
2025-09-01 2025-09-30 Revised Indicative 3,250,000
USD
2025-10-01 2025-10-31 Original Indicative 3,250,000
USD
2025-10-01 2025-10-31 Revised Indicative 3,250,000
USD
2025-11-01 2025-11-30 Original Indicative 3,250,000
USD
2025-11-01 2025-11-30 Revised Indicative 3,250,000
USD
2025-12-01 2025-12-31 Original Indicative 3,250,000
USD
2025-12-01 2025-12-31 Revised Indicative 3,250,000
USD
2026-01-01 2026-01-31 Original Indicative 3,250,000
USD
2026-01-01 2026-01-31 Revised Indicative 3,250,000
USD
2026-02-01 2026-02-28 Original Indicative 3,250,000
USD
2026-02-01 2026-02-28 Revised Indicative 3,250,000
USD
2026-03-01 2026-03-31 Original Indicative 3,250,000
USD
2026-03-01 2026-03-31 Revised Indicative 3,250,000
USD
2026-04-01 2026-04-30 Original Indicative 3,250,000
USD
2026-04-01 2026-04-30 Revised Indicative 3,250,000
USD
2026-05-01 2026-05-31 Original Indicative 3,250,000
USD
2026-05-01 2026-05-31 Revised Indicative 3,250,000
USD
2026-06-01 2026-06-30 Original Indicative 3,250,000
USD
2026-06-01 2026-06-30 Revised Indicative 3,250,000
USD
2026-07-01 2026-07-31 Original Indicative 3,341,666.67
USD
2026-07-01 2026-07-31 Revised Indicative 3,341,666.67
USD
2026-08-01 2026-08-31 Original Indicative 3,341,666.67
USD
2026-08-01 2026-08-31 Revised Indicative 3,341,666.67
USD
2026-09-01 2026-09-30 Original Indicative 3,341,666.67
USD
2026-09-01 2026-09-30 Revised Indicative 3,341,666.67
USD
2026-10-01 2026-10-31 Original Indicative 3,341,666.67
USD
2026-10-01 2026-10-31 Revised Indicative 3,341,666.67
USD
2026-11-01 2026-11-30 Original Indicative 3,341,666.67
USD
2026-11-01 2026-11-30 Revised Indicative 3,341,666.67
USD
2026-12-01 2026-12-31 Original Indicative 3,341,666.67
USD
2026-12-01 2026-12-31 Revised Indicative 3,341,666.67
USD
2027-01-01 2027-01-31 Original Indicative 3,341,666.67
USD
2027-01-01 2027-01-31 Revised Indicative 3,341,666.67
USD
2027-02-01 2027-02-28 Original Indicative 3,341,666.67
USD
2027-02-01 2027-02-28 Revised Indicative 3,341,666.67
USD
2027-03-01 2027-03-31 Original Indicative 3,341,666.67
USD
2027-03-01 2027-03-31 Revised Indicative 3,341,666.67
USD
2027-04-01 2027-04-30 Original Indicative 3,341,666.67
USD
2027-04-01 2027-04-30 Revised Indicative 3,341,666.67
USD
2027-05-01 2027-05-31 Original Indicative 3,341,666.67
USD
2027-05-01 2027-05-31 Revised Indicative 3,341,666.67
USD
2027-06-01 2027-06-30 Original Indicative 3,341,666.63
USD
2027-06-01 2027-06-30 Revised Indicative 3,341,666.63
USD
2027-07-01 2027-07-31 Original Indicative 4,540,000
USD
2027-07-01 2027-07-31 Revised Indicative 4,540,000
USD
2027-08-01 2027-08-31 Original Indicative 4,540,000
USD
2027-08-01 2027-08-31 Revised Indicative 4,540,000
USD
2027-09-01 2027-09-30 Original Indicative 4,540,000
USD
2027-09-01 2027-09-30 Revised Indicative 4,540,000
USD
2027-10-01 2027-10-31 Original Indicative 4,540,000
USD
2027-10-01 2027-10-31 Revised Indicative 4,540,000
USD
2027-11-01 2027-11-30 Original Indicative 4,540,000
USD
2027-11-01 2027-11-30 Revised Indicative 4,540,000
USD
2027-12-01 2027-12-31 Original Indicative 4,540,000
USD
2027-12-01 2027-12-31 Revised Indicative 4,540,000
USD
2028-01-01 2028-01-31 Original Indicative 4,540,000
USD
2028-01-01 2028-01-31 Revised Indicative 4,540,000
USD
2028-02-01 2028-02-29 Original Indicative 4,540,000
USD
2028-02-01 2028-02-29 Revised Indicative 4,540,000
USD
2028-03-01 2028-03-31 Original Indicative 4,540,000
USD
2028-03-01 2028-03-31 Revised Indicative 4,540,000
USD
2028-04-01 2028-04-30 Original Indicative 4,540,000
USD
2028-04-01 2028-04-30 Revised Indicative 4,540,000
USD
2028-05-01 2028-05-31 Original Indicative 4,540,000
USD
2028-05-01 2028-05-31 Revised Indicative 4,540,000
USD
2028-06-01 2028-06-30 Original Indicative 4,540,000
USD
2028-06-01 2028-06-30 Revised Indicative 4,540,000
USD
2028-07-01 2028-07-31 Original Indicative 7,030,000
USD
2028-07-01 2028-07-31 Revised Indicative 7,030,000
USD
2028-08-01 2028-08-31 Original Indicative 3,520,000
USD
2028-08-01 2028-08-31 Revised Indicative 3,520,000
USD
2028-09-01 2028-09-30 Original Indicative 3,520,000
USD
2028-09-01 2028-09-30 Revised Indicative 3,520,000
USD
2028-10-01 2028-10-31 Original Indicative 7,050,000
USD
2028-10-01 2028-10-31 Revised Indicative 7,050,000
USD
2028-11-01 2028-11-30 Original Indicative 3,530,000
USD
2028-11-01 2028-11-30 Revised Indicative 3,530,000
USD
2028-12-01 2028-12-31 Original Indicative 3,530,000
USD
2028-12-01 2028-12-31 Revised Indicative 3,530,000
USD
2029-01-01 2029-01-31 Original Indicative 3,540,000
USD
2029-01-01 2029-01-31 Revised Indicative 3,540,000
USD
2029-02-01 2029-02-28 Original Indicative 3,540,000
USD
2029-02-01 2029-02-28 Revised Indicative 3,540,000
USD
2029-03-01 2029-03-31 Original Indicative 7,090,000
USD
2029-03-01 2029-03-31 Revised Indicative 7,090,000
USD
2029-04-01 2029-04-30 Original Indicative 3,550,000
USD
2029-04-01 2029-04-30 Revised Indicative 3,550,000
USD
2029-05-01 2029-05-31 Original Indicative 3,560,000
USD
2029-05-01 2029-05-31 Revised Indicative 3,560,000
USD
2029-06-01 2029-06-30 Original Indicative 3,560,000
USD
2029-06-01 2029-06-30 Revised Indicative 3,560,000
USD
2029-07-01 2029-07-31 Original Indicative 3,560,000
USD
2029-07-01 2029-07-31 Revised Indicative 3,560,000
USD
2029-08-01 2029-08-31 Original Indicative 7,140,000
USD
2029-08-01 2029-08-31 Revised Indicative 7,140,000
USD
2029-09-01 2029-09-30 Original Indicative 3,570,000
USD
2029-09-01 2029-09-30 Revised Indicative 3,570,000
USD
2029-10-01 2029-10-31 Original Indicative 3,580,000
USD
2029-10-01 2029-10-31 Revised Indicative 3,580,000
USD
2029-11-01 2029-11-30 Original Indicative 0
USD
2029-11-01 2029-11-30 Revised Indicative 0
USD
2029-12-01 2029-12-31 Original Indicative 0
USD
2029-12-01 2029-12-31 Revised Indicative 0
USD
2030-01-01 2030-01-31 Original Indicative 0
USD
2030-01-01 2030-01-31 Revised Indicative 0
USD
2030-02-01 2030-02-28 Original Indicative 0
USD
2030-02-01 2030-02-28 Revised Indicative 0
USD
2030-03-01 2030-03-31 Original Indicative 0
USD
2030-03-01 2030-03-31 Revised Indicative 0
USD
2030-04-01 2030-04-30 Original Indicative 0
USD
2030-04-01 2030-04-30 Revised Indicative 0
USD
2030-05-01 2030-05-31 Original Indicative 0
USD
2030-05-01 2030-05-31 Revised Indicative 0
USD
Budget
Transactions ( 4 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2023-03-31
Total Commitment in March Month of 2023
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
250,000,000
USD
Outgoing Commitment
Disbursement ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2025-01-31
Total Disbursement in January Month of 2025
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
15,000,000
USD
Disbursement
Interest Payment ( 2 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2024-09-30
Total Interest Repayment in September Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-596,461
USD
2025-01-31
Total Interest Repayment in January Month of 2025
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-625,000
USD
Interest Payment
result( 18 )
output( 13 )
outcome( 5 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
OutcomeResults of the activity that produce an effect on the overall communities or issues you serve. For example lower rate of infection after a vaccination programme.
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
1. Shaanxi provincial inter-departmental coordination mechanism governing urban-rural SWM integration established and operational
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2023
No
Yes No
N/A
2023-03-23 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
13. Share of new jobs created in the SWM sector in project counties/districts of which women
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
0.00
45.00 0.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
6. Consultations and knowledge exchange events between Shaanxi and central agencies on urban-rural integration in MSWM
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
6.00 0.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
8. Number of landfills (open dumpsites) closed
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
6.00 0.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
10. Increased farmland using agricultural plastic film with thickness of 0.01mm or above
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
0.00
68.00 0.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
9. Rehabilitated, expanded or newly constructed transfer stations and sorting lines
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
70.00 0.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
7. Coverage of integrated MSW service in rural areas
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
10.00
72.00 10.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
12. Residents satisfaction rate of MSWM service of which women (Percentage)
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
28.00
83.00 28.00
0%
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
2. Shaanxi province technical standards and guidelines for urban-rural waste management as well as local policy and technical guidance for rural waste separation developed and adopted
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2023
No
Yes No
N/A
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
3. Integrated urban-rural SWM information platforms established and operational in project counties/districts
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2023
No
Yes No
N/A
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
4. KPIs and the related monitoring processes related to rural waste collection and transportation developed and adopted
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2023
No
Yes No
N/A
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
5. Action plan adopted for effective transition to standard plastic film (thicker than 0.01mm)
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2023
No
Yes No
N/A
2023-03-28 : 2029-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
11. Increase in agricultural plastic film waste collected and safely disposed based on the Performance-based Incentive Financing mechanism
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
0.00
75.00 0.00
0%
2023-03-31 : 2029-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
E. Urban-rural integrated model for municipal solid waste service developed by Shaanxi and disseminated to national agencies
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2022
No
Yes No
N/A
2022-03-28 : 2029-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
C. GHG emissions reduction from improved waste management systems including resource recycling/recovery (Metric tons CO2e/year)
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
330,000.00 0.00
0%
2023-03-28 : 2029-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
A. Reduced leakage of plastics to the environment from improved waste management operations
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
38,400.00 0.00
0%
2023-03-28 : 2029-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
D. Strengthened provincial regulations and institutional measures for plastic waste management
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2023
0.00
5.00 0.00
0%
2023-03-28 : 2029-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
B. Safe disposal ratio of municipal solid waste
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2023
15.00
76.00 15.00
0%
2023-03-28 : 2029-12-31
General Enquiries
The World Bank
Jian Xie
+1-202-473-1000
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
conditions( 7 )
NARRATIVE TYPE DESCRIPTION
Annual Work PlansPA, Schedule, Section I.B.1: The Project Implementing Entity shall: (a) prepare and furnish to the Bank byOctober 31 in each year, beginning in 2023, a draft Annual Work Plan for review and comment, summarizing the implementationprogress of the Project for the said year and the activities under the Project to be undertaken in the following calendar year,including the proposed annual budget for the Project; (b) taking into account the Bank's comments, finalize and furnish to the Bankno later than December 31 in each year, beginning in 2023, the Annual Work Plan, acceptable to the Bank; and (c) thereafter ensurethe implementation of the Project during the following calendar year in accordance with the Annual Work Plan agreed with the Bankand in a manner acceptable to the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Environmental and Social StandardsPA, Schedule, Section I.C: The Project Implementing Entity shall ensure that the Project is: (a)carried out in accordance with the Environmental and Social Standards, in a manner acceptable to the Bank; and (b) implemented inaccordance with the Environmental and Social Commitment Plan.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Financing ArrangementsPA, Schedule, Section I.D: The Project Implementing Entity shall make loan proceeds of the Loan available tothe Project Districts/Counties, under terms and conditions acceptable the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Institutional ArrangementsProject Agreement (PA), Schedule, Section I.A.1: The Project Implementing Entity shall maintain andcause to be maintained the following entities with composition, powers, functions, staffing, facilities, and other resourcesacceptable to the Bank: (a) the Provincial Project Steering Committee; (b) the Provincial Project Management Office; (c) a Projectleading group in Baoji City and each of the Project Districts/Counties; and (d) Project management office or implementation unit,as the case may be, in Baoji City and each of the Project Districts/Counties.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Mid-term ReviewPA, Schedule, Section II.2: The Project Implementing Entity shall prepare, under terms of reference acceptable tothe Bank, and furnish to the Bank no later than June 30, 2026, a consolidated mid-term review report for the Project.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Performance-based Incentive FinancingsPA, Schedule, Section I.E: The Project Implementing Entity shall cause the ProjectDistricts/Counties to : (a) make PBIFs to Eligible Beneficiaries in accordance with eligibility criteria and procedures acceptableto the Bank as set out in the PBIF Sub-manual; and (b) shall only make the proceeds of the PBIFs available to such EligibleBeneficiaries after the respective Project District/County has: (i) entered into an Implementation Agreement with the EligibleBeneficiary on terms and conditions acceptable to the Bank, and (ii) upon the submission of evidence acceptable to the Bankverifying the performance of the Eligible Beneficiaries in accordance with the terms of the Implementation Agreement and the PBIFSub-Manual.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Project Operations ManualPA, Schedule, Section I.B.2: The Project Implementing Entity shall apply the Project Operations Manual ina timely and efficient manner acceptable to the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient