ACTIVITY TITLE
Comoros Solar Energy Integration Platform
Reported by
World Bank 44000 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Multilateral (inflows) 2
Project-type interventions C01
Untied 1
Planned start date 2017-11-15
Planned end date 2024-03-28
Actual start date 2020-06-22
Actual end date 2024-03-28
activity status: Finalisation
Physical activity is complete or the final disbursement has been made, but the activity remains open pending financial sign off or M&E
WHO'S INVOLVED ( 4 )
PARTICIPATING ORG REFERENCE ROLE TYPE
Government of the Union of Comoros
Accountable
International Development Association
REF 44002
Funding Multilateral
International Development Association
REF 44002
Extending Multilateral
Ministry of Production, Environment, Energy, Industry and Handicrafts
Implementing
Objectives
Improve the commercial performance of the electric utility and its capacity to dispatch variable renewable energy.
General
The objective of the Solar Energy Integration Platform Project for Comoros is to improve the commercial performance of the electric utility and its capacity to dispatch variable renewable energy. The project has four components. 1. Investment in Power Storage, Pilot Photovoltaic (PV), and System Upgrades component will finance around 9 MWp (Megawatt Peak) of PV on a pilot basis on Grande Comore at one of the 11 prospective solar sites identified as part of project preparation. The facility is expected to displace around 13 GWh of diesel-based thermal generation every year. 2. SONELEC (National Comorian Electricity Company) Commercial and Financial Recovery component will strengthen SONELEC's financial performance by improving billing and metering infrastructure, as well as targeted consumer awareness campaigns. This component has two subcomponents. Subcomponent 2.1: Geographical expansion and enhancements of SONELEC's commercial management system (CMS). The ESRP has financed the implementation of a state-of-the-art hardware and software infrastructure for SONELEC's new CMS covering all customers on Grande Comore and MohEli to ensure the streamlining of billing and collection activities and fully integrating the new prepaid metering infrastructure. The 2.2. subcomponent will take care of the rollout of advanced metering infrastructure. The Electricity Sector Recovery Project (ESRP) had piloted the installation of 1,000 prepaid low-voltage meters and 400 smart three-phase meters of different types. Consequently, the project will support the mainstreaming of prepaid meters by installing 95,000 additional split-type meters on all three islands, which will have a considerable impact on strengthening the sustainability of SONELEC's revenues and cash flow. 3. Technical Assistance, Project Implementation support, and capacity building component has four subcomponents. 3.1. Subcomponent will provide the project implementation support. Experience with the energy sector in the Comoros has shown that significant support for project coordination and implementation is necessary due to low capacity and significant historic sector governance challenges. 3.2. Training and capacity building in transmission and dispatch system operations and maintenance subcomponent will support the transition from SONELEC's current short-term oriented approach that restricts private sector participation to the implementation of turnkey contracts for the construction of new generation capacity. This subcomponent will include the financing to engage private sector operators in the Operations and Maintenance (O and M) of the three islands dispatch systems for a duration of three years, in addition to the PV plus storage O and M provided for under Component 1. SONELEC's technical staff will be trained during that period to carry out future O and M activities once the contracts with private sector have expired. 3.3. subcomponent will focus on the expansion of gender-based communication and awareness campaigns. The recently completed ESRP was successful in increasing women's awareness and advocating the value of formal electricity connections and the importance of paying electricity bills. 3.4. Technical assistance for sector governance and renewable energy development subcomponent will provide support to the key energy sector institutions through the hiring of external experts and the provision of training. 4. Contingent Emergency Response Component (CERC) with zero allocation may be used to contribute to an emergency response through the timely implementation of activities in response to an eligible national emergency. The CERC can also be used to channel additional funds if they become available as a result of said emergency. For the Comorian energy sector, emergency conditions may arise subsequent to extreme weather events including cyclones and flooding or economic disruption including fuel import shortages.
recipient country ( 1 )
Comoros (the)KM
100
LOCATION ( 47 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Grande Comore
ID 0000921882 (Geonames)
-11.58333 43.33333 Administrative Region Activity Approximate
Union of the Comoros
ID 0000921929 (Geonames)
-12.23333 44.44553 Administrative Region Activity Approximate
Ndzuwani
ID 0000922001 (Geonames)
-12.25 44.41667 Administrative Region Activity Approximate
Sima
ID 0000921675 (Geonames)
-12.19556 44.27667 Populated Place Activity Approximate
Sambia
ID 0000921685 (Geonames)
-12.36694 43.79611 Populated Place Activity Approximate
Pomoni
ID 0000921698 (Geonames)
-12.28 44.40889 Populated Place Activity Approximate
Pidjani
ID 0000921700 (Geonames)
-11.76425 43.45191 Populated Place Activity Approximate
Ouani
ID 0000921721 (Geonames)
-12.13554 44.42493 Populated Place Activity Approximate
Ouallah
ID 0000921722 (Geonames)
-12.32556 43.66333 Populated Place Activity Approximate
Ntsoudjini
ID 0000921729 (Geonames)
-11.66077 43.27157 Populated Place Activity Approximate
Ntsaoueni
ID 0000921731 (Geonames)
-11.46583 43.26278 Populated Place Activity Approximate
Nioumachoua
ID 0000921745 (Geonames)
-12.36139 43.71528 Populated Place Activity Approximate
Mramani
ID 0000921763 (Geonames)
-12.34639 44.52861 Populated Place Activity Approximate
Moya
ID 0000921764 (Geonames)
-12.30967 44.43685 Populated Place Activity Approximate
Moroni
ID 0000921772 (Geonames)
-11.70216 43.25506 Populated Place Activity Approximate
Mitsoudje
ID 0000921785 (Geonames)
-11.81209 43.28043 Populated Place Activity Approximate
Mitsamiouli
ID 0000921786 (Geonames)
-11.38472 43.28444 Populated Place Activity Approximate
Miringoni
ID 0000921790 (Geonames)
-12.29667 43.63528 Populated Place Activity Approximate
Mbeni
ID 0000921806 (Geonames)
-11.50139 43.3775 Populated Place Activity Approximate
Koimbani
ID 0000921839 (Geonames)
-11.62306 43.35667 Populated Place Activity Approximate
Jimilime
ID 0000921851 (Geonames)
-12.09709 44.4642 Populated Place Activity Approximate
Itsamia
ID 0000921857 (Geonames)
-12.36417 43.86778 Populated Place Activity Approximate
Hoani
ID 0000921870 (Geonames)
-12.25083 43.67472 Populated Place Activity Approximate
Hahaya
ID 0000921876 (Geonames)
-11.56223 43.27214 Populated Place Activity Approximate
Foumbouni
ID 0000921884 (Geonames)
-11.86537 43.49529 Populated Place Activity Approximate
Fomboni
ID 0000921889 (Geonames)
-12.28759 43.74344 Populated Place Activity Approximate
Domoni
ID 0000921906 (Geonames)
-12.25694 44.53194 Populated Place Activity Approximate
Djoyezi
ID 0000921913 (Geonames)
-12.30587 43.77425 Populated Place Activity Approximate
Dembeni
ID 0000921918 (Geonames)
-11.87361 43.39778 Populated Place Activity Approximate
Chomoni
ID 0000921935 (Geonames)
-11.64306 43.38583 Populated Place Activity Approximate
Chindini
ID 0000921942 (Geonames)
-11.92328 43.49109 Populated Place Activity Approximate
Chezani
ID 0000921944 (Geonames)
-11.4314 43.39625 Populated Place Activity Approximate
Boboni
ID 0000921964 (Geonames)
-11.7525 43.28028 Populated Place Activity Approximate
Bimbini
ID 0000921967 (Geonames)
-12.18833 44.23556 Populated Place Activity Approximate
Bangoua Kouni
ID 0000921974 (Geonames)
-11.3675 43.35278 Populated Place Activity Approximate
Bambao
ID 0000921992 (Geonames)
-12.20325 44.51638 Populated Place Activity Approximate
Ziroudani
ID 0001090640 (Geonames)
-12.3325 43.7775 Populated Place Activity Approximate
Hamavouna
ID 0001090832 (Geonames)
-12.37306 43.83833 Populated Place Activity Approximate
Hagnamouada
ID 0001090852 (Geonames)
-12.33333 43.8425 Populated Place Activity Approximate
Hajoho
ID 0001091076 (Geonames)
-12.12434 44.48881 Populated Place Activity Approximate
Salapouani
ID 0001091457 (Geonames)
-12.37111 44.50694 Populated Place Activity Approximate
Kourani
ID 0001091991 (Geonames)
-11.49361 43.36833 Populated Place Activity Approximate
Sidjou
ID 0001092162 (Geonames)
-11.67139 43.405 Populated Place Activity Approximate
Tsidje
ID 0001092169 (Geonames)
-11.69806 43.26194 Populated Place Activity Approximate
Tsangadjou
ID 0001092178 (Geonames)
-11.715 43.425 Populated Place Activity Approximate
Ikoni
ID 0001092369 (Geonames)
-11.74 43.22556 Populated Place Activity Approximate
Anjouan
ID 0000922000 (Geonames)
-12.21999 44.4421 Other Topographical Feature Activity Approximate
sector ( 17 )
OECD DAC CRS 5 digit1( 4 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Solar energy for centralised grids23230
42
Electric power transmission and distribution (centralised grids)23630
38
Information and communication technology (ICT)22040
10
Energy policy and administrative management Withdrawn 23010
10
GLOSSARY
Solar energy for centralised gridsIncluding photo-voltaic cells, concentrated solar power systems connected to the main grid and net-metered decentralised solutions.
Electric power transmission and distribution (centralised grids)Grid distribution from power source to end user; transmission lines. Also includes storage of energy to generate power (e.g. pumped hydro, batteries) and the extension of grid access, often to rural areas.
Information and communication technology (ICT)Computer hardware and software; internet access; IT training. When sector cannot be specified.
Energy policy and administrative management Withdrawn Energy sector policy, planning and programmes; aid to energy ministries; institution capacity building and advice; unspecified energy activities including energy conservation.
Reporting Organisation99( 4 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity
FY17 - Renewable Energy Solar LU
40
FY17 - Energy Transmission and Distribution LT
33
FY17 - Public Administration - Energy and Extractives LP
20
FY17 - ICT Infrastructure CI
7
Reporting Organisation 298( 9 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity (if they are referencing more than one)
Energy 000086
100
Access to Energy 000863
85
Energy Efficiency 000861
85
Climate change 000081
81
Mitigation 000811
81
Energy Policies & Reform 000862
35
ICT Solutions 000261
35
ICT 000026
35
Gender 000061
20
capital spend
The percentage of the total commitment that is for capital spending
100
Financial Overview
Outgoing Commitment ( 4 )
Budget ( 124 )
Outgoing Commitment
Budget
Budget ( 124 )
START END TYPE STATUS VALUE
2020-05-01 2020-05-31 Original Indicative 0
USD
2020-05-01 2020-05-31 Revised Indicative 0
USD
2020-06-01 2020-06-30 Original Indicative 47,000
USD
2020-06-01 2020-06-30 Revised Indicative 47,000
USD
2020-07-01 2020-07-31 Original Indicative 109,960
USD
2020-07-01 2020-07-31 Revised Indicative 109,960
USD
2020-08-01 2020-08-31 Original Indicative 129,200
USD
2020-08-01 2020-08-31 Revised Indicative 129,200
USD
2020-09-01 2020-09-30 Original Indicative 71,920
USD
2020-09-01 2020-09-30 Revised Indicative 71,920
USD
2020-10-01 2020-10-31 Original Indicative 157,280
USD
2020-10-01 2020-10-31 Revised Indicative 157,280
USD
2020-11-01 2020-11-30 Original Indicative 173,640
USD
2020-11-01 2020-11-30 Revised Indicative 173,640
USD
2020-12-01 2020-12-31 Original Indicative 190,200
USD
2020-12-01 2020-12-31 Revised Indicative 190,200
USD
2021-01-01 2021-01-31 Original Indicative 216,000
USD
2021-01-01 2021-01-31 Revised Indicative 216,000
USD
2021-02-01 2021-02-28 Original Indicative 237,320
USD
2021-02-01 2021-02-28 Revised Indicative 237,320
USD
2021-03-01 2021-03-31 Original Indicative 248,960
USD
2021-03-01 2021-03-31 Revised Indicative 248,960
USD
2021-04-01 2021-04-30 Original Indicative 255,240
USD
2021-04-01 2021-04-30 Revised Indicative 255,240
USD
2021-05-01 2021-05-31 Original Indicative 263,840
USD
2021-05-01 2021-05-31 Revised Indicative 263,840
USD
2021-06-01 2021-06-30 Original Indicative 135,040
USD
2021-06-01 2021-06-30 Revised Indicative 135,040
USD
2021-07-01 2021-07-31 Original Indicative 272,840
USD
2021-07-01 2021-07-31 Revised Indicative 272,840
USD
2021-08-01 2021-08-31 Original Indicative 271,400
USD
2021-08-01 2021-08-31 Revised Indicative 271,400
USD
2021-09-01 2021-09-30 Original Indicative 264,680
USD
2021-09-01 2021-09-30 Revised Indicative 264,680
USD
2021-10-01 2021-10-31 Original Indicative 264,920
USD
2021-10-01 2021-10-31 Revised Indicative 264,920
USD
2021-11-01 2021-11-30 Original Indicative 275,600
USD
2021-11-01 2021-11-30 Revised Indicative 275,600
USD
2021-12-01 2021-12-31 Original Indicative 296,160
USD
2021-12-01 2021-12-31 Revised Indicative 296,160
USD
2022-01-01 2022-01-31 Original Indicative 308,000
USD
2022-01-01 2022-01-31 Revised Indicative 308,000
USD
2022-02-01 2022-02-28 Original Indicative 318,720
USD
2022-02-01 2022-02-28 Revised Indicative 318,720
USD
2022-03-01 2022-03-31 Original Indicative 340,640
USD
2022-03-01 2022-03-31 Revised Indicative 340,640
USD
2022-04-01 2022-04-30 Original Indicative 179,920
USD
2022-04-01 2022-04-30 Revised Indicative 179,920
USD
2022-05-01 2022-05-31 Original Indicative 371,080
USD
2022-05-01 2022-05-31 Revised Indicative 371,080
USD
2022-06-01 2022-06-30 Original Indicative 389,080
USD
2022-06-01 2022-06-30 Revised Indicative 389,080
USD
2022-07-01 2022-07-31 Original Indicative 533,300
USD
2022-07-01 2022-07-31 Revised Indicative 533,300
USD
2022-08-01 2022-08-31 Original Indicative 533,300
USD
2022-08-01 2022-08-31 Revised Indicative 533,300
USD
2022-09-01 2022-09-30 Original Indicative 533,300
USD
2022-09-01 2022-09-30 Revised Indicative 533,300
USD
2022-10-01 2022-10-31 Original Indicative 533,300
USD
2022-10-01 2022-10-31 Revised Indicative 533,300
USD
2022-11-01 2022-11-30 Original Indicative 533,300
USD
2022-11-01 2022-11-30 Revised Indicative 533,300
USD
2022-12-01 2022-12-31 Original Indicative 533,300
USD
2022-12-01 2022-12-31 Revised Indicative 533,300
USD
2023-01-01 2023-01-31 Original Indicative 533,300
USD
2023-01-01 2023-01-31 Revised Indicative 533,300
USD
2023-02-01 2023-02-28 Original Indicative 533,300
USD
2023-02-01 2023-02-28 Revised Indicative 533,300
USD
2023-03-01 2023-03-31 Original Indicative 533,300
USD
2023-03-01 2023-03-31 Revised Indicative 533,300
USD
2023-04-01 2023-04-30 Original Indicative 533,300
USD
2023-04-01 2023-04-30 Revised Indicative 533,300
USD
2023-05-01 2023-05-31 Original Indicative 533,300
USD
2023-05-01 2023-05-31 Revised Indicative 533,300
USD
2023-06-01 2023-06-30 Original Indicative 533,300
USD
2023-06-01 2023-06-30 Revised Indicative 533,300
USD
2023-07-01 2023-07-31 Original Indicative 1,169,030
USD
2023-07-01 2023-07-31 Revised Indicative 1,169,030
USD
2023-08-01 2023-08-31 Original Indicative 1,169,030
USD
2023-08-01 2023-08-31 Revised Indicative 1,169,030
USD
2023-09-01 2023-09-30 Original Indicative 1,169,030
USD
2023-09-01 2023-09-30 Revised Indicative 1,169,030
USD
2023-10-01 2023-10-31 Original Indicative 1,169,030
USD
2023-10-01 2023-10-31 Revised Indicative 1,169,030
USD
2023-11-01 2023-11-30 Original Indicative 1,169,030
USD
2023-11-01 2023-11-30 Revised Indicative 1,169,030
USD
2023-12-01 2023-12-31 Original Indicative 1,169,030
USD
2023-12-01 2023-12-31 Revised Indicative 1,169,030
USD
2024-01-01 2024-01-31 Original Indicative 1,169,030
USD
2024-01-01 2024-01-31 Revised Indicative 1,169,030
USD
2024-02-01 2024-02-29 Original Indicative 1,169,030
USD
2024-02-01 2024-02-29 Revised Indicative 1,169,030
USD
2024-03-01 2024-03-31 Original Indicative 1,169,030
USD
2024-03-01 2024-03-31 Revised Indicative 1,169,030
USD
2024-04-01 2024-04-30 Original Indicative 1,169,030
USD
2024-04-01 2024-04-30 Revised Indicative 1,169,030
USD
2024-05-01 2024-05-31 Original Indicative 1,169,030
USD
2024-05-01 2024-05-31 Revised Indicative 1,169,030
USD
2024-06-01 2024-06-30 Original Indicative 1,169,030
USD
2024-06-01 2024-06-30 Revised Indicative 1,169,030
USD
2024-07-01 2024-07-31 Original Indicative 1,148,616.67
USD
2024-07-01 2024-07-31 Revised Indicative 1,148,616.67
USD
2024-08-01 2024-08-31 Original Indicative 1,148,616.67
USD
2024-08-01 2024-08-31 Revised Indicative 1,148,616.67
USD
2024-09-01 2024-09-30 Original Indicative 1,148,616.67
USD
2024-09-01 2024-09-30 Revised Indicative 1,148,616.67
USD
2024-10-01 2024-10-31 Original Indicative 1,148,616.67
USD
2024-10-01 2024-10-31 Revised Indicative 1,148,616.67
USD
2024-11-01 2024-11-30 Original Indicative 1,148,616.67
USD
2024-11-01 2024-11-30 Revised Indicative 1,148,616.67
USD
2024-12-01 2024-12-31 Original Indicative 1,148,616.67
USD
2024-12-01 2024-12-31 Revised Indicative 1,148,616.67
USD
2025-01-01 2025-01-31 Original Indicative 1,148,616.67
USD
2025-01-01 2025-01-31 Revised Indicative 1,148,616.67
USD
2025-02-01 2025-02-28 Original Indicative 1,148,616.67
USD
2025-02-01 2025-02-28 Revised Indicative 1,148,616.67
USD
2025-03-01 2025-03-31 Original Indicative 1,148,616.67
USD
2025-03-01 2025-03-31 Revised Indicative 1,148,616.67
USD
2025-04-01 2025-04-30 Original Indicative 1,148,616.67
USD
2025-04-01 2025-04-30 Revised Indicative 1,148,616.67
USD
2025-05-01 2025-05-31 Original Indicative 1,148,616.67
USD
2025-05-01 2025-05-31 Revised Indicative 1,148,616.67
USD
2025-06-01 2025-06-30 Original Indicative 1,148,616.63
USD
2025-06-01 2025-06-30 Revised Indicative 1,148,616.63
USD
Budget
Transactions ( 4 )
Outgoing Commitment ( 4 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2020-06-30
Total Commitment in June Month of 2020
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
20,000,000
USD
2020-06-30
Total Commitment in June Month of 2020
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
20,000,000
USD
2021-12-31
Total Commitment Cancellations in December Month of 2021
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-21,002,331
USD
2021-12-31
Total Commitment Cancellations in December Month of 2021
FLOW ODA 10
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
IDA Credit
REF 44002
-21,929,120
USD
Outgoing Commitment
General Enquiries
The World Bank
Claudio Miguel Jamisse Buque
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
conditions( 1 )
NARRATIVE TYPE DESCRIPTION
FA, Schedule 2, Section I, A, 2 (e): Not later than six (6) months after the Effectiveness Date, an internal auditor and externalauditor shall have been recruited and appointed.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient