| ACTIVITY SCOPE | COLLABORATION TYPE | AID TYPE | FINANCE TYPE | FLOW TYPE | TIED STATUS | HIERARCHY |
|---|---|---|---|---|---|---|
| Multilateral (inflows) 2 |
Project-type interventions C01
|
Untied | 1 |
| PARTICIPATING ORG | REFERENCE | ROLE | TYPE |
|---|---|---|---|
International Development Association
|
REF 44002
|
Funding | Multilateral |
International Development Association
|
REF 44002
|
Extending | Multilateral |
Islamic Republic of Pakistan (acting through Economic Affairs Division [EAD])
|
REF PK–P0028994
|
Accountable | |
Islamic Republic of Pakistan (acting through Economic Affairs Division [EAD])
|
REF PK–P0028994
|
Accountable | |
National Highways Authority (NHA)
|
REF PK–COA-0028995
|
Implementing | |
Planning and Development Department, Government of Khyber Pakhtunkhwa.
|
REF PK–COA-0028996
|
Implementing |
| NAME | DESCRIPTION | POSITION | CLASS | REACH | EXACTNESS |
|---|---|---|---|---|---|
|
Khyber Agency
ID 0001173641 (Geonames)
|
33.96113 71.0577 | Administrative Region | Activity | Approximate | |
|
Federally Administered Tribal Areas
ID 0001179245 (Geonames)
|
33.01455 69.99925 | Administrative Region | Activity | Approximate | |
|
Peshawar
ID 0001168197 (Geonames)
|
34.008 71.57849 | Populated Place | Activity | Approximate | |
|
Landi Kotal
ID 0001172208 (Geonames)
|
34.0988 71.14108 | Populated Place | Activity | Approximate | |
|
Lahore
ID 0001172451 (Geonames)
|
31.558 74.35071 | Populated Place | Activity | Approximate | |
|
Karachi
ID 0001174872 (Geonames)
|
24.8608 67.0104 | Populated Place | Activity | Approximate | |
|
Kabul
ID 0001175555 (Geonames)
|
26.41667 69.88333 | Populated Place | Activity | Approximate | |
|
Jamrud
ID 0001176233 (Geonames)
|
34.00152 71.38007 | Populated Place | Activity | Approximate | |
|
Chagai
ID 0001181951 (Geonames)
|
29.35393 64.69751 | Populated Place | Activity | Approximate | |
|
Aza Khel
ID 0001184194 (Geonames)
|
33.80083 71.62149 | Populated Place | Activity | Approximate | |
|
Ali Masjid
ID 0001378917 (Geonames)
|
34.01362 72.80428 | Populated Place | Activity | Approximate | |
|
Islamabad
ID 0001482730 (Geonames)
|
34.33308 72.2857 | Populated Place | Activity | Approximate | |
|
Khyber Line
ID 0007041350 (Geonames)
|
34.01106 71.58387 | Populated Place | Activity | Approximate | |
|
Torkham
ID 0009034791 (Geonames)
|
34.11472 71.08472 | Populated Place | Activity | Approximate | |
|
Indus Highway
ID 0001425946 (Geonames)
|
32.06333 70.80667 | Other Topographical Feature | Activity | Approximate |
| START | END | TYPE | STATUS | VALUE |
|---|---|---|---|---|
| 2018-06-01 | 2018-06-30 | Original | Indicative | 0 USD |
| 2018-06-01 | 2018-06-30 | Revised | Indicative | 0 USD |
| 2018-07-01 | 2018-07-31 | Original | Indicative | 0 USD |
| 2018-07-01 | 2018-07-31 | Revised | Indicative | 0 USD |
| 2018-08-01 | 2018-08-31 | Revised | Indicative | 0 USD |
| 2018-08-01 | 2018-08-31 | Original | Indicative | 868,973.9 USD |
| 2018-09-01 | 2018-09-30 | Revised | Indicative | 0 USD |
| 2018-09-01 | 2018-09-30 | Original | Indicative | 870,994.6 USD |
| 2018-10-01 | 2018-10-31 | Revised | Indicative | 0 USD |
| 2018-10-01 | 2018-10-31 | Original | Indicative | 2,043,682.2 USD |
| 2018-11-01 | 2018-11-30 | Revised | Indicative | 0 USD |
| 2018-11-01 | 2018-11-30 | Original | Indicative | 814,843.2 USD |
| 2018-12-01 | 2018-12-31 | Revised | Indicative | 0 USD |
| 2018-12-01 | 2018-12-31 | Original | Indicative | 2,628,644.2 USD |
| 2019-01-01 | 2019-01-31 | Revised | Indicative | 0 USD |
| 2019-01-01 | 2019-01-31 | Original | Indicative | 2,992,518.2 USD |
| 2019-02-01 | 2019-02-28 | Revised | Indicative | 0 USD |
| 2019-02-01 | 2019-02-28 | Original | Indicative | 1,632,827 USD |
| 2019-03-01 | 2019-03-31 | Revised | Indicative | 0 USD |
| 2019-03-01 | 2019-03-31 | Original | Indicative | 3,597,746.6 USD |
| 2019-04-01 | 2019-04-30 | Revised | Indicative | 0 USD |
| 2019-04-01 | 2019-04-30 | Original | Indicative | 1,978,737.6 USD |
| 2019-05-01 | 2019-05-31 | Revised | Indicative | 0 USD |
| 2019-05-01 | 2019-05-31 | Original | Indicative | 4,259,628.8 USD |
| 2019-06-01 | 2019-06-30 | Revised | Indicative | 0 USD |
| 2019-06-01 | 2019-06-30 | Original | Indicative | 4,572,376.2 USD |
| 2019-07-01 | 2019-07-31 | Revised | Indicative | 0 USD |
| 2019-07-01 | 2019-07-31 | Original | Indicative | 3,787,789.7 USD |
| 2019-08-01 | 2019-08-31 | Revised | Indicative | 0 USD |
| 2019-08-01 | 2019-08-31 | Original | Indicative | 3,787,789.7 USD |
| 2019-09-01 | 2019-09-30 | Revised | Indicative | 0 USD |
| 2019-09-01 | 2019-09-30 | Original | Indicative | 3,787,789.7 USD |
| 2019-10-01 | 2019-10-31 | Revised | Indicative | 0 USD |
| 2019-10-01 | 2019-10-31 | Original | Indicative | 3,787,789.7 USD |
| 2019-11-01 | 2019-11-30 | Revised | Indicative | 0 USD |
| 2019-11-01 | 2019-11-30 | Original | Indicative | 3,787,789.7 USD |
| 2019-12-01 | 2019-12-31 | Revised | Indicative | 0 USD |
| 2019-12-01 | 2019-12-31 | Original | Indicative | 3,787,789.7 USD |
| 2020-01-01 | 2020-01-31 | Revised | Indicative | 0 USD |
| 2020-01-01 | 2020-01-31 | Original | Indicative | 3,787,789.7 USD |
| 2020-02-01 | 2020-02-29 | Revised | Indicative | 0 USD |
| 2020-02-01 | 2020-02-29 | Original | Indicative | 3,787,789.7 USD |
| 2020-03-01 | 2020-03-31 | Revised | Indicative | 0 USD |
| 2020-03-01 | 2020-03-31 | Original | Indicative | 3,787,789.7 USD |
| 2020-04-01 | 2020-04-30 | Revised | Indicative | 0 USD |
| 2020-04-01 | 2020-04-30 | Original | Indicative | 3,787,789.7 USD |
| 2020-05-01 | 2020-05-31 | Revised | Indicative | 0 USD |
| 2020-05-01 | 2020-05-31 | Original | Indicative | 3,787,789.7 USD |
| 2020-06-01 | 2020-06-30 | Revised | Indicative | 0 USD |
| 2020-06-01 | 2020-06-30 | Original | Indicative | 3,787,789.7 USD |
| 2020-07-01 | 2020-07-31 | Revised | Indicative | 0 USD |
| 2020-07-01 | 2020-07-31 | Original | Indicative | 6,493,270.12 USD |
| 2020-08-01 | 2020-08-31 | Revised | Indicative | 0 USD |
| 2020-08-01 | 2020-08-31 | Original | Indicative | 6,493,270.12 USD |
| 2020-09-01 | 2020-09-30 | Revised | Indicative | 0 USD |
| 2020-09-01 | 2020-09-30 | Original | Indicative | 6,493,270.12 USD |
| 2020-10-01 | 2020-10-31 | Revised | Indicative | 0 USD |
| 2020-10-01 | 2020-10-31 | Original | Indicative | 6,493,270.12 USD |
| 2020-11-01 | 2020-11-30 | Revised | Indicative | 0 USD |
| 2020-11-01 | 2020-11-30 | Original | Indicative | 6,493,270.12 USD |
| 2020-12-01 | 2020-12-31 | Revised | Indicative | 0 USD |
| 2020-12-01 | 2020-12-31 | Original | Indicative | 6,493,270.12 USD |
| 2021-01-01 | 2021-01-31 | Revised | Indicative | 0 USD |
| 2021-01-01 | 2021-01-31 | Original | Indicative | 6,493,270.12 USD |
| 2021-02-01 | 2021-02-28 | Revised | Indicative | 0 USD |
| 2021-02-01 | 2021-02-28 | Original | Indicative | 6,493,270.12 USD |
| 2021-03-01 | 2021-03-31 | Revised | Indicative | 0 USD |
| 2021-03-01 | 2021-03-31 | Original | Indicative | 6,493,270.12 USD |
| 2021-04-01 | 2021-04-30 | Revised | Indicative | 0 USD |
| 2021-04-01 | 2021-04-30 | Original | Indicative | 6,493,270.12 USD |
| 2021-05-01 | 2021-05-31 | Revised | Indicative | 0 USD |
| 2021-05-01 | 2021-05-31 | Original | Indicative | 6,493,270.12 USD |
| 2021-06-01 | 2021-06-30 | Revised | Indicative | 0 USD |
| 2021-06-01 | 2021-06-30 | Original | Indicative | 6,493,270.08 USD |
| 2021-07-01 | 2021-07-31 | Revised | Indicative | 0 USD |
| 2021-07-01 | 2021-07-31 | Original | Indicative | 9,290,725.37 USD |
| 2021-08-01 | 2021-08-31 | Revised | Indicative | 0 USD |
| 2021-08-01 | 2021-08-31 | Original | Indicative | 9,290,725.37 USD |
| 2021-09-01 | 2021-09-30 | Revised | Indicative | 0 USD |
| 2021-09-01 | 2021-09-30 | Original | Indicative | 9,290,725.37 USD |
| 2021-10-01 | 2021-10-31 | Revised | Indicative | 0 USD |
| 2021-10-01 | 2021-10-31 | Original | Indicative | 9,290,725.37 USD |
| 2021-11-01 | 2021-11-30 | Revised | Indicative | 0 USD |
| 2021-11-01 | 2021-11-30 | Original | Indicative | 9,290,725.37 USD |
| 2021-12-01 | 2021-12-31 | Revised | Indicative | 0 USD |
| 2021-12-01 | 2021-12-31 | Original | Indicative | 9,290,725.37 USD |
| 2022-01-01 | 2022-01-31 | Revised | Indicative | 0 USD |
| 2022-01-01 | 2022-01-31 | Original | Indicative | 9,290,725.37 USD |
| 2022-02-01 | 2022-02-28 | Revised | Indicative | 0 USD |
| 2022-02-01 | 2022-02-28 | Original | Indicative | 9,290,725.37 USD |
| 2022-03-01 | 2022-03-31 | Revised | Indicative | 0 USD |
| 2022-03-01 | 2022-03-31 | Original | Indicative | 9,290,725.37 USD |
| 2022-04-01 | 2022-04-30 | Revised | Indicative | 0 USD |
| 2022-04-01 | 2022-04-30 | Original | Indicative | 9,290,725.37 USD |
| 2022-05-01 | 2022-05-31 | Revised | Indicative | 0 USD |
| 2022-05-01 | 2022-05-31 | Original | Indicative | 9,290,725.37 USD |
| 2022-06-01 | 2022-06-30 | Revised | Indicative | 0 USD |
| 2022-06-01 | 2022-06-30 | Original | Indicative | 9,290,725.33 USD |
| 2022-07-01 | 2022-07-31 | Revised | Indicative | 0 USD |
| 2022-07-01 | 2022-07-31 | Original | Indicative | 7,826,056.67 USD |
| 2022-08-01 | 2022-08-31 | Revised | Indicative | 0 USD |
| 2022-08-01 | 2022-08-31 | Original | Indicative | 7,826,056.67 USD |
| 2022-09-01 | 2022-09-30 | Revised | Indicative | 0 USD |
| 2022-09-01 | 2022-09-30 | Original | Indicative | 7,826,056.67 USD |
| 2022-10-01 | 2022-10-31 | Revised | Indicative | 0 USD |
| 2022-10-01 | 2022-10-31 | Original | Indicative | 7,826,056.67 USD |
| 2022-11-01 | 2022-11-30 | Revised | Indicative | 0 USD |
| 2022-11-01 | 2022-11-30 | Original | Indicative | 7,826,056.67 USD |
| 2022-12-01 | 2022-12-31 | Revised | Indicative | 0 USD |
| 2022-12-01 | 2022-12-31 | Original | Indicative | 7,826,056.67 USD |
| 2023-01-01 | 2023-01-31 | Revised | Indicative | 0 USD |
| 2023-01-01 | 2023-01-31 | Original | Indicative | 7,826,056.67 USD |
| 2023-02-01 | 2023-02-28 | Revised | Indicative | 0 USD |
| 2023-02-01 | 2023-02-28 | Original | Indicative | 7,826,056.67 USD |
| 2023-03-01 | 2023-03-31 | Revised | Indicative | 0 USD |
| 2023-03-01 | 2023-03-31 | Original | Indicative | 7,826,056.67 USD |
| 2023-04-01 | 2023-04-30 | Revised | Indicative | 0 USD |
| 2023-04-01 | 2023-04-30 | Original | Indicative | 7,826,056.67 USD |
| 2023-05-01 | 2023-05-31 | Revised | Indicative | 0 USD |
| 2023-05-01 | 2023-05-31 | Original | Indicative | 7,826,056.67 USD |
| 2023-06-01 | 2023-06-30 | Revised | Indicative | 0 USD |
| 2023-06-01 | 2023-06-30 | Original | Indicative | 7,826,056.64 USD |
| 2023-07-01 | 2023-07-31 | Revised | Indicative | 0 USD |
| 2023-07-01 | 2023-07-31 | Original | Indicative | 3,992,731.6 USD |
| 2023-08-01 | 2023-08-31 | Revised | Indicative | 0 USD |
| 2023-08-01 | 2023-08-31 | Original | Indicative | 3,992,731.6 USD |
| 2023-09-01 | 2023-09-30 | Revised | Indicative | 0 USD |
| 2023-09-01 | 2023-09-30 | Original | Indicative | 3,992,731.6 USD |
| 2023-10-01 | 2023-10-31 | Revised | Indicative | 0 USD |
| 2023-10-01 | 2023-10-31 | Original | Indicative | 3,992,731.6 USD |
| 2023-11-01 | 2023-11-30 | Revised | Indicative | 0 USD |
| 2023-11-01 | 2023-11-30 | Original | Indicative | 3,992,731.6 USD |
| 2023-12-01 | 2023-12-31 | Revised | Indicative | 0 USD |
| 2023-12-01 | 2023-12-31 | Original | Indicative | 3,992,731.6 USD |
| 2024-01-01 | 2024-01-31 | Revised | Indicative | 0 USD |
| 2024-01-01 | 2024-01-31 | Original | Indicative | 3,992,731.6 USD |
| 2024-02-01 | 2024-02-29 | Revised | Indicative | 0 USD |
| 2024-02-01 | 2024-02-29 | Original | Indicative | 3,992,731.6 USD |
| 2024-03-01 | 2024-03-31 | Revised | Indicative | 0 USD |
| 2024-03-01 | 2024-03-31 | Original | Indicative | 3,992,731.6 USD |
| 2024-04-01 | 2024-04-30 | Revised | Indicative | 0 USD |
| 2024-04-01 | 2024-04-30 | Original | Indicative | 3,992,731.6 USD |
| 2024-05-01 | 2024-05-31 | Revised | Indicative | 0 USD |
| 2024-05-01 | 2024-05-31 | Original | Indicative | 3,992,731.6 USD |
| 2024-06-01 | 2024-06-30 | Revised | Indicative | 0 USD |
| 2024-06-01 | 2024-06-30 | Original | Indicative | 3,992,731.6 USD |
| 2024-06-01 | 2029-05-28 | Original | Indicative | -1,010,580.04 USD |
| 2024-06-01 | 2029-05-28 | Revised | Indicative | -1,010,580.04 USD |
| 2024-07-01 | 2024-07-31 | Revised | Indicative | 0 USD |
| 2024-07-01 | 2024-07-31 | Original | Indicative | 7,889,156.8 USD |
| 2024-08-01 | 2024-08-31 | Revised | Indicative | 0 USD |
| 2024-08-01 | 2024-08-31 | Original | Indicative | 7,889,156.79 USD |
| 2024-09-01 | 2024-09-30 | Original | Indicative | 0 USD |
| 2024-09-01 | 2024-09-30 | Revised | Indicative | 0 USD |
| 2024-10-01 | 2024-10-31 | Original | Indicative | 0 USD |
| 2024-10-01 | 2024-10-31 | Revised | Indicative | 0 USD |
| 2024-11-01 | 2024-11-30 | Original | Indicative | 0 USD |
| 2024-11-01 | 2024-11-30 | Revised | Indicative | 0 USD |
| 2024-12-01 | 2024-12-31 | Original | Indicative | 0 USD |
| 2024-12-01 | 2024-12-31 | Revised | Indicative | 0 USD |
| 2025-01-01 | 2025-01-31 | Original | Indicative | 0 USD |
| 2025-01-01 | 2025-01-31 | Revised | Indicative | 0 USD |
| 2025-02-01 | 2025-02-28 | Original | Indicative | 0 USD |
| 2025-02-01 | 2025-02-28 | Revised | Indicative | 0 USD |
| 2025-03-01 | 2025-03-31 | Original | Indicative | 0 USD |
| 2025-03-01 | 2025-03-31 | Revised | Indicative | 0 USD |
| 2025-04-01 | 2025-04-30 | Original | Indicative | 0 USD |
| 2025-04-01 | 2025-04-30 | Revised | Indicative | 0 USD |
| 2025-05-01 | 2025-05-31 | Original | Indicative | 0 USD |
| 2025-05-01 | 2025-05-31 | Revised | Indicative | 0 USD |
| 2025-06-01 | 2025-06-30 | Original | Indicative | 0 USD |
| 2025-06-01 | 2025-06-30 | Revised | Indicative | 0 USD |
| 2025-07-01 | 2025-07-31 | Original | Indicative | 0 USD |
| 2025-07-01 | 2025-07-31 | Revised | Indicative | 0 USD |
| 2025-08-01 | 2025-08-31 | Original | Indicative | 0 USD |
| 2025-08-01 | 2025-08-31 | Revised | Indicative | 0 USD |
| 2025-09-01 | 2025-09-30 | Original | Indicative | 0 USD |
| 2025-09-01 | 2025-09-30 | Revised | Indicative | 0 USD |
| 2025-10-01 | 2025-10-31 | Original | Indicative | 0 USD |
| 2025-10-01 | 2025-10-31 | Revised | Indicative | 0 USD |
| 2025-11-01 | 2025-11-30 | Original | Indicative | 0 USD |
| 2025-11-01 | 2025-11-30 | Revised | Indicative | 0 USD |
| 2025-12-01 | 2025-12-31 | Original | Indicative | 0 USD |
| 2025-12-01 | 2025-12-31 | Revised | Indicative | 0 USD |
| 2026-01-01 | 2026-01-31 | Original | Indicative | 0 USD |
| 2026-01-01 | 2026-01-31 | Revised | Indicative | 0 USD |
| 2026-02-01 | 2026-02-28 | Original | Indicative | 0 USD |
| 2026-02-01 | 2026-02-28 | Revised | Indicative | 0 USD |
| 2026-03-01 | 2026-03-31 | Original | Indicative | 0 USD |
| 2026-03-01 | 2026-03-31 | Revised | Indicative | 0 USD |
| 2026-04-01 | 2026-04-30 | Original | Indicative | 0 USD |
| 2026-04-01 | 2026-04-30 | Revised | Indicative | 0 USD |
| 2026-05-01 | 2026-05-31 | Original | Indicative | 0 USD |
| 2026-05-01 | 2026-05-31 | Revised | Indicative | 0 USD |
| 2026-06-01 | 2026-06-30 | Original | Indicative | 0 USD |
| 2026-06-01 | 2026-06-30 | Revised | Indicative | 0 USD |
| 2026-07-01 | 2026-07-31 | Original | Indicative | 0 USD |
| 2026-07-01 | 2026-07-31 | Revised | Indicative | 0 USD |
| 2026-08-01 | 2026-08-31 | Original | Indicative | 0 USD |
| 2026-08-01 | 2026-08-31 | Revised | Indicative | 0 USD |
| 2026-09-01 | 2026-09-30 | Original | Indicative | 0 USD |
| 2026-09-01 | 2026-09-30 | Revised | Indicative | 0 USD |
| 2026-10-01 | 2026-10-31 | Original | Indicative | 0 USD |
| 2026-10-01 | 2026-10-31 | Revised | Indicative | 0 USD |
| 2026-11-01 | 2026-11-30 | Original | Indicative | 0 USD |
| 2026-11-01 | 2026-11-30 | Revised | Indicative | 0 USD |
| 2026-12-01 | 2026-12-31 | Original | Indicative | 0 USD |
| 2026-12-01 | 2026-12-31 | Revised | Indicative | 0 USD |
| 2027-01-01 | 2027-01-31 | Original | Indicative | 0 USD |
| 2027-01-01 | 2027-01-31 | Revised | Indicative | 0 USD |
| 2027-02-01 | 2027-02-28 | Original | Indicative | 0 USD |
| 2027-02-01 | 2027-02-28 | Revised | Indicative | 0 USD |
| 2027-03-01 | 2027-03-31 | Original | Indicative | 0 USD |
| 2027-03-01 | 2027-03-31 | Revised | Indicative | 0 USD |
| 2027-04-01 | 2027-04-30 | Original | Indicative | 0 USD |
| 2027-04-01 | 2027-04-30 | Revised | Indicative | 0 USD |
| 2027-05-01 | 2027-05-31 | Original | Indicative | 0 USD |
| 2027-05-01 | 2027-05-31 | Revised | Indicative | 0 USD |
| 2027-06-01 | 2027-06-30 | Original | Indicative | 0 USD |
| 2027-06-01 | 2027-06-30 | Revised | Indicative | 0 USD |
| 2027-07-01 | 2027-07-31 | Original | Indicative | 0 USD |
| 2027-07-01 | 2027-07-31 | Revised | Indicative | 0 USD |
| 2027-08-01 | 2027-08-31 | Original | Indicative | 0 USD |
| 2027-08-01 | 2027-08-31 | Revised | Indicative | 0 USD |
| 2027-09-01 | 2027-09-30 | Original | Indicative | 0 USD |
| 2027-09-01 | 2027-09-30 | Revised | Indicative | 0 USD |
| 2027-10-01 | 2027-10-31 | Original | Indicative | 0 USD |
| 2027-10-01 | 2027-10-31 | Revised | Indicative | 0 USD |
| 2027-11-01 | 2027-11-30 | Original | Indicative | 0 USD |
| 2027-11-01 | 2027-11-30 | Revised | Indicative | 0 USD |
| 2027-12-01 | 2027-12-31 | Original | Indicative | 0 USD |
| 2027-12-01 | 2027-12-31 | Revised | Indicative | 0 USD |
| 2028-01-01 | 2028-01-31 | Original | Indicative | 0 USD |
| 2028-01-01 | 2028-01-31 | Revised | Indicative | 0 USD |
| 2028-02-01 | 2028-02-29 | Original | Indicative | 0 USD |
| 2028-02-01 | 2028-02-29 | Revised | Indicative | 0 USD |
| 2028-03-01 | 2028-03-31 | Original | Indicative | 0 USD |
| 2028-03-01 | 2028-03-31 | Revised | Indicative | 0 USD |
| 2028-04-01 | 2028-04-30 | Original | Indicative | 0 USD |
| 2028-04-01 | 2028-04-30 | Revised | Indicative | 0 USD |
| 2028-05-01 | 2028-05-31 | Original | Indicative | 0 USD |
| 2028-05-01 | 2028-05-31 | Revised | Indicative | 0 USD |
| 2028-06-01 | 2028-06-30 | Original | Indicative | 0 USD |
| 2028-06-01 | 2028-06-30 | Revised | Indicative | 0 USD |
| 2028-07-01 | 2028-07-31 | Original | Indicative | 0 USD |
| 2028-07-01 | 2028-07-31 | Revised | Indicative | 0 USD |
| 2028-08-01 | 2028-08-31 | Original | Indicative | 0 USD |
| 2028-08-01 | 2028-08-31 | Revised | Indicative | 0 USD |
| 2028-09-01 | 2028-09-30 | Original | Indicative | 0 USD |
| 2028-09-01 | 2028-09-30 | Revised | Indicative | 0 USD |
| 2028-10-01 | 2028-10-31 | Original | Indicative | 0 USD |
| 2028-10-01 | 2028-10-31 | Revised | Indicative | 0 USD |
| 2028-11-01 | 2028-11-30 | Original | Indicative | 0 USD |
| 2028-11-01 | 2028-11-30 | Revised | Indicative | 0 USD |
| 2028-12-01 | 2028-12-31 | Original | Indicative | 0 USD |
| 2028-12-01 | 2028-12-31 | Revised | Indicative | 0 USD |
| 2029-01-01 | 2029-01-31 | Original | Indicative | 0 USD |
| 2029-01-01 | 2029-01-31 | Revised | Indicative | 0 USD |
| 2029-02-01 | 2029-02-28 | Original | Indicative | 0 USD |
| 2029-02-01 | 2029-02-28 | Revised | Indicative | 0 USD |
| 2029-03-01 | 2029-03-31 | Original | Indicative | 0 USD |
| 2029-03-01 | 2029-03-31 | Revised | Indicative | 0 USD |
| 2029-04-01 | 2029-04-30 | Original | Indicative | 0 USD |
| 2029-04-01 | 2029-04-30 | Revised | Indicative | 0 USD |
| 2029-05-01 | 2029-05-31 | Original | Indicative | 0 USD |
| 2029-05-01 | 2029-05-31 | Revised | Indicative | 0 USD |
| 2029-06-01 | 2029-06-30 | Original | Indicative | 0 USD |
| 2029-06-01 | 2029-06-30 | Revised | Indicative | 0 USD |
| 2029-07-01 | 2029-07-31 | Original | Indicative | 0 USD |
| 2029-07-01 | 2029-07-31 | Revised | Indicative | 0 USD |
| 2029-08-01 | 2029-08-31 | Original | Indicative | 0 USD |
| 2029-08-01 | 2029-08-31 | Revised | Indicative | 0 USD |
| DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
|---|---|---|---|---|
| 2018-06-30 |
Total Commitment in June Month of 2018
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
460,600,000 USD |
| DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
|---|---|---|---|---|
| 2020-12-31 |
Total Disbursement in December Month of 2020
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
696,875 USD |
| 2022-09-30 |
Total Disbursement in September Month of 2022
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
491,400 USD |
| 2022-12-31 |
Total Disbursement in December Month of 2022
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
13,947 USD |
| 2023-03-31 |
Total Disbursement in March Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
1,000,000 USD |
| 2023-10-31 |
Total Disbursement in October Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
350,000 USD |
| 2023-12-31 |
Total Disbursement in December Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
26,180 USD |
| 2024-02-29 |
Total Disbursement in February Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
130,448 USD |
| 2024-04-30 |
Total Disbursement in April Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
16,668 USD |
| 2024-05-31 |
Total Disbursement in May Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
32,885 USD |
| 2024-06-30 |
Total Disbursement in June Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
50 USD |
| 2024-07-31 |
Total Disbursement in July Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
49,053 USD |
| 2024-08-31 |
Total Disbursement in August Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
179 USD |
| 2024-12-31 |
Total Disbursement in December Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
31,875 USD |
| 2025-01-31 |
Total Disbursement in January Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
431 USD |
| 2025-04-30 |
Total Disbursement in April Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
500,000 USD |
| 2026-02-28 |
Total Disbursement in February Month of 2026
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
21,542 USD |
| 2026-04-30 |
Total Disbursement in April Month of 2026
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
1,000,000 USD |
| DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
|---|---|---|---|---|
| 2021-04-30 |
Total Interest Repayment in April Month of 2021
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-3,912 USD |
| 2021-10-31 |
Total Interest Repayment in October Month of 2021
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-6,813 USD |
| 2022-04-30 |
Total Interest Repayment in April Month of 2022
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-6,662 USD |
| 2022-10-31 |
Total Interest Repayment in October Month of 2022
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-6,393 USD |
| 2023-04-30 |
Total Interest Repayment in April Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-12,205 USD |
| 2023-10-31 |
Total Interest Repayment in October Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-21,244 USD |
| 2024-04-30 |
Total Interest Repayment in April Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-3,530 USD |
| 2025-04-30 |
Total Interest Repayment in April Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-1,934 USD |
| 2025-10-31 |
Total Interest Repayment in October Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-188 USD |
| 2026-04-30 |
Total Interest Repayment in April Month of 2026
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-4,939 USD |
| DATE | DESCRIPTION | PROVIDER | RECEIVER | VALUE |
|---|---|---|---|---|
| 2023-10-31 |
Total Loan Repayment in October Month of 2023
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-2,124,430 USD |
| 2024-04-30 |
Total Loan Repayment in April Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-378,805 USD |
| 2024-10-31 |
Total Loan Repayment in October Month of 2024
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-231,345 USD |
| 2025-04-30 |
Total Loan Repayment in April Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-34,891 USD |
| 2025-10-31 |
Total Loan Repayment in October Month of 2025
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-511,699 USD |
| 2026-04-30 |
Total Loan Repayment in April Month of 2026
FLOW ODA
10
FINANCE Aid loan excluding debt reorganisation Withdrawn
410
|
IDA Credit
REF 44002
|
National Highways Authority (NHA) Planning and Development Department, Government of Khyber Pakhtunkhwa.
REF PK–COA-28996
|
-1,961 USD |
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
1900 Not provided
|
0 | 0 |
100%
|
1900-01-01 : 2026-05-11 |
|
Target comment
The baseline and end of project target values will be determined after commencement of physical activities at project location. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
1900 Not provided
|
0 | 0 |
100%
|
1900-01-01 : 2026-05-11 |
|
Target comment
The baseline and end of project target values will be determined during Mid Term Review expected in May 2025. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
10.00 | 0.00 |
0%
|
2018-01-01 : 2026-05-28 |
|
Target comment
Results are not available at this stage. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
40.00 | 0.00 |
0%
|
2018-01-01 : 2026-05-28 |
|
Target comment
Results not available at this stage as physical activities are yet to start |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
10.00 | 0.00 |
0%
|
2018-01-01 : 2029-05-15 |
|
Target comment
Results are not available at this stage. Bidding process for civil works contractor underway |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
2.00 | 0.00 International Bus Terminal Feasibility underway and expected to be completed by August 2024 |
0%
|
2018-01-01 : 2026-05-28 |
|
Target comment
Feasibility study of International Bus Terminal completed. expected to be completed
The feasibility study for the freight terminal is expected to start by end of May 2026. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
1.00 | 90 |
100%
|
2018-01-01 : 2023-09-30 |
|
Target comment
Masterplan completed. Two urban development plans for Jamrud and Landi Kotal also completed. preparation of feasibility studies for selected investments started. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
20.00 | 0.00 |
0%
|
2018-01-14 : 2029-05-14 |
|
Target comment
The targeted total length of secondary roads rehabilitated has been rationalized based on the final alignment of Peshawar Torkham Expressway and the Western Greater Peshawar Masterplan study. Physical work has not yet started. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
1.00 | 0.00 Feasibility study of International Bus Terminal completed. The feasibility study for the freight terminal is expected to start by June 2026. The completed Masterplan recommends investment in only the freight and logistics terminal, hence the the end of project target has been revised from two terminal to one. |
0%
|
2018-01-14 : 2029-05-14 |
|
Target comment
Feasibility study of International Bus Terminal completed. The feasibility study for the freight terminal is expected to start by June 2026. The completed Masterplan recommends investment in only the freight and logistics terminal, hence the the end of project target has been revised from two terminal to one. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
1.00 | 100 |
100%
|
2018-01-14 : 2029-05-14 |
|
Target comment
1.00
Masterplan completed. Two urban development plans for Jamrud and Landi Kotal also completed. preparation of feasibility studies for selected investments started. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
100.00 | 100 |
100%
|
2018-08-14 : 2029-05-14 |
|
Target comment
Project level online integrated GRM Portal setup for both Project Management Units (Component 1 & 2). The National Highway Authority (NHA) has also set up a complaints registration toll free hotline. In additional complaint boxes have been placed at key locations in villages located along the alignment. Stakeholder engagement and public consultations are being carried out regularly and in a systematic manner. Only 6 complaints were received during the past two quarters and all 6 were resolved successfully. The main reasons for few complaints being lodged are because (i) civil works have not yet started, and (ii) land acquisition process is not yet in advanced. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
100.00 | 100 |
100%
|
2018-08-15 : 2026-05-28 |
|
Target comment
Project level online integrated GRM Portal setup for both Project Management Units (Component 1 & 2). The National Highway Authority (NHA) has also set up a complaints registration toll free hotline. In additional complaint boxes have been placed at key locations in villages located along the alignment. Stakeholder engagement and public consultations are being carried out regularly and in a systematic manner. Only 6 complaints were received during the past two quarters and all 6 were resolved successfully. The main reasons for few complaints being lodged are because (i) civil works have not yet started, and (ii) land acquisition process is not yet in advanced. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2026 0 |
850 | 0 |
0%
|
2026-04-14 : 2029-05-14 |
|
Target comment
The End of Project target number is estimated based on available date. This will be reconfirmed once the Livelihood Restoration Plan is completed |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2026 0 |
100,000 | 0 |
0%
|
2026-04-14 : 2029-05-14 |
|
Target comment
The end of target value has been estimated based on a number of reports, including the ESIA, RAP, and primarily the Western Greater Peshawar Masterplan. However the target numbers will be revisited after completion of the Livelihood Restoration Plan and the Capacity Building Plan. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
500.00 | 0.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
500.00 | 0.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
500.00 | 0.00 |
0%
|
2018-03-07 : 2029-05-15 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 0.00 |
500.00 | 0.00 |
0%
|
2018-03-07 : 2029-05-15 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 120.00 |
72.00 | 120.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 120.00 |
72.00 | 120.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 13.00 |
6.00 | 13.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 13.00 |
6.00 | 13.00 |
0%
|
2018-03-07 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 120.00 |
72.00 | 120.00 |
0%
|
2018-03-14 : 2029-05-14 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2018 120.00 |
72.00 | 120.00 |
0%
|
2018-03-14 : 2029-05-14 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 100.00 |
120.00 | 100.00 |
0%
|
2018-06-30 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 100.00 |
120.00 | 100.00 |
0%
|
2018-06-30 : 2026-05-28 |
|
Target comment
Physical activities are yet to start. Procurement of civil works contract ongoing. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 100.00 |
120.00 | 100.00 |
0%
|
2018-06-30 : 2029-05-15 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Percentage | Percentage | ||||
|
No dimension has been provided
No location has been provided
|
2018 100.00 |
120.00 | 100.00 |
0%
|
2018-06-30 : 2029-05-15 |
|
Target comment
Physical activities are yet to start. |
|||||
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2026 0 |
100000 | 0 |
0%
|
2026-04-14 : 2029-05-14 |
| FACET | BASELINE | TARGET | ACTUAL | % | PERIOD |
|---|---|---|---|---|---|
| Unit | Unit | ||||
|
No dimension has been provided
No location has been provided
|
2026 0 |
100000 | 0 |
0%
|
2026-04-14 : 2029-05-14 |
| NARRATIVE | TYPE | DESCRIPTION |
|---|---|---|
FA, Schedule 2, Section I.B. 2, 4 and 5 and PA, Schedule, Section I.B.2, 4 and 5:The Recipient shall, and shall cause the ProjectImplementing Entities for both Part I & II to, ensure that:(i) the Project shall be implemented in accordance with the guidelines,procedures, timetables and other specifications set forth in the Safeguard Documents; (ii) prior to commencing any works under theProject: (A) all necessary governmental permits and clearances for such civil works shall have been obtained from the competentgovernmental authority/ies; (B) all pre-construction conditions imposed by the governmental authority/ies under such permit(s) orclearance(s) shall have been complied with/fulfilled; and (C) all resettlement measures for the respective civil works set forth inthe applicable Resettlement Action Plan, shall have been fully executed, including the full payment of compensation prior todisplacement and/or the provision of relocation assistance to all Displaced Persons, as per the entitlements provided in theResettlement Policy Framework and/or the applicable Resettlement Action Plan; (iii) any contracts for civil works under theProject include codes of conduct in form and substance acceptable to the Association, detailing measures on environment, health andsafety and preventing and responding to HIV/AIDS, gender-based violence, and violence against children; (iv) safeguard reportingrequirements shall be complied with; and(v) a grievance redress mechanism for the handling of any stakeholder complaints arisingout of the implementation of the Project activities shall be maintained throughout Project implementation.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
FA, Schedule 2, Section I.C and Section III.A: The Recipient shall provide an amount of not less than the equivalent of forty-sixmillion and two hundred thousand Dollars ($46,200,000) as counterpart funds for the Project, to be allocated to Land Expendituresand expenditures related to security during construction.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
PA, Schedule, Section I.A.1: No later than one (1) month after the Effective Date, the Project Implementing Entities shallestablish, and thereafter maintain two separate steering committees for Part I and II, with terms of reference, composition andresources satisfactory to the Association, to provide overall direction and strategic guidance to the Project.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
PA, Schedule, Section I.A.2(a): No later than one (1) month after the Effective Date, the Project Implementing Entities shallestablish, and thereafter maintain, project implementation units for Components 1&2 respectively, with terms of reference,composition and resources satisfactory to the Association.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |
PA, Schedule. Section I.C:The Project Implementing Entity for Part-I undertakes that any decision to toll the Expressway shallapply in the same manner (and at same rate) to the alternative national highway.
|
Performance | The condition attached requires certain outputs or outcomes to be achieved by the recipient |