ACTIVITY TITLE
China: Jiangxi Eco-industrial Parks Project
Reported by
World Bank 44000 Multilateral
ACTIVITY SCOPE COLLABORATION TYPE AID TYPE FINANCE TYPE FLOW TYPE TIED STATUS HIERARCHY
Multilateral (inflows) 2
Project-type interventions C01
Untied 1
Planned start date 2017-10-30
Planned end date 2026-12-31
Actual start date 2020-06-18
Actual end date 2026-12-31
activity status: Implementation
The activity is currently being implemented
WHO'S INVOLVED ( 5 )
PARTICIPATING ORG REFERENCE ROLE TYPE
Fuzhou New Industries Zone
Implementing
International Bank for Reconstruction and Development
REF 44001
Funding Multilateral
International Bank for Reconstruction and Development
REF 44001
Extending Multilateral
Jiangxi Development and Reform Commission
Implementing
People's Republic of China
Accountable
Objectives
To strengthen Jiangxi's institutional and regulatory framework for eco-industrial parks (EIP) to be consistent with the International EIP Framework and demonstrate its implementation in the Fuzhou New Industries Zone.
General
recipient country ( 1 )
ChinaCN
100
LOCATION ( 1 )
NAME DESCRIPTION POSITION CLASS REACH EXACTNESS
Fuzhou Shi
ID 0001810818 (Geonames)
27.50223 116.41518 Administrative Region Activity Approximate
sector ( 24 )
OECD DAC CRS 5 digit1( 4 )
The sector reported corresponds to an OECD DAC CRS 5-digit purpose code http://reference.iatistandard.org/codelists/Sector/
Waste management/disposal14050
93
Sanitation - large systems14022
3
Tourism policy and administrative management33210
3
Trade policy and administrative management33110
1
GLOSSARY
Waste management/disposalMunicipal and industrial solid waste management, including hazardous and toxic waste; collection, disposal and treatment; landfill areas; composting and reuse.
Sanitation - large systemsLarge scale sewerage including trunk sewers and sewage pumping stations; domestic and industrial waste water treatment plants.
Tourism policy and administrative managementNo description provided
Trade policy and administrative managementTrade policy and planning; support to ministries and departments responsible for trade policy; trade-related legislation and regulatory reforms; policy analysis and implementation of multilateral trade agreements e.g. technical barriers to trade and sanitary and phytosanitary measures (TBT/SPS) except at regional level (see 33130); mainstreaming trade in national development strategies (e.g. poverty reduction strategy papers); wholesale/retail trade; unspecified trade and trade promotion activities.
Reporting Organisation99( 4 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity
FY17 - Renewable Energy Solar LU
95
FY17 - Forestry AT
2
FY17 - Public Administration - Water, Sanitation and Waste Management WF
2
FY17 - Public Administration - Industry, Trade and Services YF
1
Reporting Organisation 298( 16 )
The sector reported corresponds to a sector vocabulary maintained by the reporting organisation for this activity (if they are referencing more than one)
E-Government, incl. e-services 000433
95
Gender 000061
95
Jobs 000022
95
Public Administration 000043
95
Job Creation 000221
92
Climate change 000081
73
Mitigation 000811
73
Biodiversity 000834
7
Renewable Natural Resources Asset Management 000083
7
Urban Development 000071
7
Urban Water and Sanitation 000716
7
Air quality management 000821
3
Environmental Health and Pollution Management 000082
3
Trade Policy 000143
3
Trade 000014
3
Adaptation 000812
0
capital spend
The percentage of the total commitment that is for capital spending
100
Financial Overview
Outgoing Commitment ( 1 )
Disbursement ( 7 )
Interest Payment ( 9 )
Budget ( 206 )
Outgoing Commitment
Disbursement
Interest Payment
Budget
Budget ( 206 )
START END TYPE STATUS VALUE
2018-12-01 2018-12-31 Original Indicative 0
USD
2018-12-01 2018-12-31 Revised Indicative 0
USD
2019-01-01 2019-01-31 Original Indicative 0
USD
2019-01-01 2019-01-31 Revised Indicative 0
USD
2019-02-01 2019-02-28 Original Indicative 0
USD
2019-02-01 2019-02-28 Revised Indicative 0
USD
2019-03-01 2019-03-31 Original Indicative 0
USD
2019-03-01 2019-03-31 Revised Indicative 0
USD
2019-04-01 2019-04-30 Original Indicative 0
USD
2019-04-01 2019-04-30 Revised Indicative 0
USD
2019-05-01 2019-05-31 Original Indicative 0
USD
2019-05-01 2019-05-31 Revised Indicative 0
USD
2019-06-01 2019-06-30 Original Indicative 0
USD
2019-06-01 2019-06-30 Revised Indicative 0
USD
2019-07-01 2019-07-31 Original Indicative 0
USD
2019-07-01 2019-07-31 Revised Indicative 0
USD
2019-08-01 2019-08-31 Original Indicative 0
USD
2019-08-01 2019-08-31 Revised Indicative 0
USD
2019-09-01 2019-09-30 Original Indicative 0
USD
2019-09-01 2019-09-30 Revised Indicative 0
USD
2019-10-01 2019-10-31 Original Indicative 0
USD
2019-10-01 2019-10-31 Revised Indicative 0
USD
2019-11-01 2019-11-30 Original Indicative 0
USD
2019-11-01 2019-11-30 Revised Indicative 0
USD
2019-12-01 2019-12-31 Original Indicative 0
USD
2019-12-01 2019-12-31 Revised Indicative 0
USD
2020-01-01 2020-01-31 Original Indicative 0
USD
2020-01-01 2020-01-31 Revised Indicative 0
USD
2020-02-01 2020-02-29 Original Indicative 0
USD
2020-02-01 2020-02-29 Revised Indicative 0
USD
2020-03-01 2020-03-31 Original Indicative 0
USD
2020-03-01 2020-03-31 Revised Indicative 0
USD
2020-04-01 2020-04-30 Original Indicative 0
USD
2020-04-01 2020-04-30 Revised Indicative 0
USD
2020-05-01 2020-05-31 Original Indicative 0
USD
2020-05-01 2020-05-31 Revised Indicative 0
USD
2020-06-01 2020-06-30 Original Indicative 0
USD
2020-06-01 2020-06-30 Revised Indicative 0
USD
2020-07-01 2020-07-31 Original Indicative 0
USD
2020-07-01 2020-07-31 Revised Indicative 0
USD
2020-08-01 2020-08-31 Revised Indicative 0
USD
2020-08-01 2020-08-31 Original Indicative 990,000
USD
2020-09-01 2020-09-30 Revised Indicative 0
USD
2020-09-01 2020-09-30 Original Indicative 1,110,000
USD
2020-10-01 2020-10-31 Revised Indicative 0
USD
2020-10-01 2020-10-31 Original Indicative 2,230,000
USD
2020-11-01 2020-11-30 Revised Indicative 0
USD
2020-11-01 2020-11-30 Original Indicative 1,120,000
USD
2020-12-01 2020-12-31 Revised Indicative 0
USD
2020-12-01 2020-12-31 Original Indicative 1,130,000
USD
2021-01-01 2021-01-31 Revised Indicative 0
USD
2021-01-01 2021-01-31 Original Indicative 1,130,000
USD
2021-02-01 2021-02-28 Revised Indicative 0
USD
2021-02-01 2021-02-28 Original Indicative 2,270,000
USD
2021-03-01 2021-03-31 Revised Indicative 0
USD
2021-03-01 2021-03-31 Original Indicative 1,140,000
USD
2021-04-01 2021-04-30 Revised Indicative 0
USD
2021-04-01 2021-04-30 Original Indicative 1,140,000
USD
2021-05-01 2021-05-31 Revised Indicative 0
USD
2021-05-01 2021-05-31 Original Indicative 1,150,000
USD
2021-06-01 2021-06-30 Revised Indicative 0
USD
2021-06-01 2021-06-30 Original Indicative 2,310,000
USD
2021-07-01 2021-07-31 Original Indicative 1,160,000
USD
2021-07-01 2021-07-31 Revised Indicative 83,333.33
USD
2021-08-01 2021-08-31 Original Indicative 1,170,000
USD
2021-08-01 2021-08-31 Revised Indicative 83,333.33
USD
2021-09-01 2021-09-30 Original Indicative 1,180,000
USD
2021-09-01 2021-09-30 Revised Indicative 83,333.33
USD
2021-10-01 2021-10-31 Original Indicative 1,180,000
USD
2021-10-01 2021-10-31 Revised Indicative 83,333.33
USD
2021-11-01 2021-11-30 Original Indicative 2,390,000
USD
2021-11-01 2021-11-30 Revised Indicative 83,333.33
USD
2021-12-01 2021-12-31 Original Indicative 1,210,000
USD
2021-12-01 2021-12-31 Revised Indicative 83,333.33
USD
2022-01-01 2022-01-31 Original Indicative 1,230,000
USD
2022-01-01 2022-01-31 Revised Indicative 83,333.33
USD
2022-02-01 2022-02-28 Original Indicative 1,240,000
USD
2022-02-01 2022-02-28 Revised Indicative 83,333.33
USD
2022-03-01 2022-03-31 Original Indicative 2,550,000
USD
2022-03-01 2022-03-31 Revised Indicative 83,333.33
USD
2022-04-01 2022-04-30 Original Indicative 1,320,000
USD
2022-04-01 2022-04-30 Revised Indicative 83,333.33
USD
2022-05-01 2022-05-31 Original Indicative 1,370,000
USD
2022-05-01 2022-05-31 Revised Indicative 83,333.33
USD
2022-06-01 2022-06-30 Original Indicative 1,430,000
USD
2022-06-01 2022-06-30 Revised Indicative 83,333.37
USD
2022-07-01 2022-07-31 Revised Indicative 1,666,666.67
USD
2022-07-01 2022-07-31 Original Indicative 3,140,000
USD
2022-08-01 2022-08-31 Revised Indicative 1,666,666.67
USD
2022-08-01 2022-08-31 Original Indicative 1,780,000
USD
2022-09-01 2022-09-30 Revised Indicative 1,666,666.67
USD
2022-09-01 2022-09-30 Original Indicative 1,920,000
USD
2022-10-01 2022-10-31 Revised Indicative 1,666,666.67
USD
2022-10-01 2022-10-31 Original Indicative 1,950,000
USD
2022-11-01 2022-11-30 Revised Indicative 1,666,666.67
USD
2022-11-01 2022-11-30 Original Indicative 3,660,000
USD
2022-12-01 2022-12-31 Revised Indicative 1,666,666.67
USD
2022-12-01 2022-12-31 Original Indicative 1,970,000
USD
2023-01-01 2023-01-31 Revised Indicative 1,666,666.67
USD
2023-01-01 2023-01-31 Original Indicative 2,260,000
USD
2023-02-01 2023-02-28 Revised Indicative 1,666,666.67
USD
2023-02-01 2023-02-28 Original Indicative 2,780,000
USD
2023-03-01 2023-03-31 Revised Indicative 1,666,666.67
USD
2023-03-01 2023-03-31 Original Indicative 3,350,000
USD
2023-04-01 2023-04-30 Revised Indicative 1,666,666.67
USD
2023-04-01 2023-04-30 Original Indicative 7,790,000
USD
2023-05-01 2023-05-31 Revised Indicative 1,666,666.67
USD
2023-05-01 2023-05-31 Original Indicative 3,890,000
USD
2023-06-01 2023-06-30 Revised Indicative 1,666,666.63
USD
2023-06-01 2023-06-30 Original Indicative 3,410,000
USD
2023-07-01 2023-07-31 Revised Indicative 2,500,000
USD
2023-07-01 2023-07-31 Original Indicative 3,370,000
USD
2023-08-01 2023-08-31 Revised Indicative 2,500,000
USD
2023-08-01 2023-08-31 Original Indicative 6,550,000
USD
2023-09-01 2023-09-30 Revised Indicative 2,500,000
USD
2023-09-01 2023-09-30 Original Indicative 3,150,000
USD
2023-10-01 2023-10-31 Revised Indicative 2,500,000
USD
2023-10-01 2023-10-31 Original Indicative 3,040,000
USD
2023-11-01 2023-11-30 Revised Indicative 2,500,000
USD
2023-11-01 2023-11-30 Original Indicative 2,910,000
USD
2023-12-01 2023-12-31 Revised Indicative 2,500,000
USD
2023-12-01 2023-12-31 Original Indicative 5,360,000
USD
2024-01-01 2024-01-31 Original Indicative 2,450,000
USD
2024-01-01 2024-01-31 Revised Indicative 2,500,000
USD
2024-02-01 2024-02-29 Original Indicative 2,310,000
USD
2024-02-01 2024-02-29 Revised Indicative 2,500,000
USD
2024-03-01 2024-03-31 Original Indicative 2,200,000
USD
2024-03-01 2024-03-31 Revised Indicative 2,500,000
USD
2024-04-01 2024-04-30 Revised Indicative 2,500,000
USD
2024-04-01 2024-04-30 Original Indicative 5,180,000
USD
2024-05-01 2024-05-31 Revised Indicative 2,500,000
USD
2024-05-01 2024-05-31 Original Indicative 2,630,000
USD
2024-06-01 2024-06-30 Revised Indicative 2,500,000
USD
2024-06-01 2024-06-30 Original Indicative 2,700,000
USD
2024-07-01 2024-07-31 Original Indicative 2,820,000
USD
2024-07-01 2024-07-31 Revised Indicative 4,166,666.67
USD
2024-08-01 2024-08-31 Original Indicative 3,010,000
USD
2024-08-01 2024-08-31 Revised Indicative 4,166,666.67
USD
2024-09-01 2024-09-30 Revised Indicative 4,166,666.67
USD
2024-09-01 2024-09-30 Original Indicative 6,870,000
USD
2024-10-01 2024-10-31 Original Indicative 1,770,000
USD
2024-10-01 2024-10-31 Revised Indicative 4,166,666.67
USD
2024-11-01 2024-11-30 Original Indicative 1,830,000
USD
2024-11-01 2024-11-30 Revised Indicative 4,166,666.67
USD
2024-12-01 2024-12-31 Original Indicative 2,040,000
USD
2024-12-01 2024-12-31 Revised Indicative 4,166,666.67
USD
2025-01-01 2025-01-31 Revised Indicative 4,166,666.67
USD
2025-01-01 2025-01-31 Original Indicative 4,500,000
USD
2025-02-01 2025-02-28 Original Indicative 2,320,000
USD
2025-02-01 2025-02-28 Revised Indicative 4,166,666.67
USD
2025-03-01 2025-03-31 Original Indicative 2,330,000
USD
2025-03-01 2025-03-31 Revised Indicative 4,166,666.67
USD
2025-04-01 2025-04-30 Original Indicative 2,320,000
USD
2025-04-01 2025-04-30 Revised Indicative 4,166,666.67
USD
2025-05-01 2025-05-31 Revised Indicative 4,166,666.67
USD
2025-05-01 2025-05-31 Original Indicative 4,590,000
USD
2025-06-01 2025-06-30 Original Indicative 2,270,000
USD
2025-06-01 2025-06-30 Revised Indicative 4,166,666.63
USD
2025-07-01 2025-07-31 Original Indicative 2,250,000
USD
2025-07-01 2025-07-31 Revised Indicative 4,166,666.67
USD
2025-08-01 2025-08-31 Original Indicative 2,230,000
USD
2025-08-01 2025-08-31 Revised Indicative 4,166,666.67
USD
2025-09-01 2025-09-30 Revised Indicative 4,166,666.67
USD
2025-09-01 2025-09-30 Original Indicative 4,400,000
USD
2025-10-01 2025-10-31 Original Indicative 2,170,000
USD
2025-10-01 2025-10-31 Revised Indicative 4,166,666.67
USD
2025-11-01 2025-11-30 Original Indicative 2,150,000
USD
2025-11-01 2025-11-30 Revised Indicative 4,166,666.67
USD
2025-12-01 2025-12-31 Revised Indicative 4,166,666.67
USD
2025-12-01 2025-12-31 Original Indicative 4,240,000
USD
2026-01-01 2026-01-31 Original Indicative 4,160,000
USD
2026-01-01 2026-01-31 Revised Indicative 4,166,666.67
USD
2026-02-01 2026-02-28 Original Indicative 0
USD
2026-02-01 2026-02-28 Revised Indicative 4,166,666.67
USD
2026-03-01 2026-03-31 Original Indicative 4,090,000
USD
2026-03-01 2026-03-31 Revised Indicative 4,166,666.67
USD
2026-04-01 2026-04-30 Original Indicative 2,020,000
USD
2026-04-01 2026-04-30 Revised Indicative 4,166,666.67
USD
2026-05-01 2026-05-31 Original Indicative 3,990,000
USD
2026-05-01 2026-05-31 Revised Indicative 4,166,666.67
USD
2026-06-01 2026-06-30 Original Indicative 1,970,000
USD
2026-06-01 2026-06-30 Revised Indicative 4,166,666.63
USD
2026-07-01 2026-07-31 Original Indicative 1,960,000
USD
2026-07-01 2026-07-31 Revised Indicative 4,900,000
USD
2026-08-01 2026-08-31 Original Indicative 1,940,000
USD
2026-08-01 2026-08-31 Revised Indicative 4,900,000
USD
2026-09-01 2026-09-30 Original Indicative 3,840,000
USD
2026-09-01 2026-09-30 Revised Indicative 4,900,000
USD
2026-10-01 2026-10-31 Original Indicative 1,900,000
USD
2026-10-01 2026-10-31 Revised Indicative 4,900,000
USD
2026-11-01 2026-11-30 Original Indicative 1,890,000
USD
2026-11-01 2026-11-30 Revised Indicative 4,900,000
USD
2026-12-01 2026-12-31 Original Indicative 1,880,000
USD
2026-12-01 2026-12-31 Revised Indicative 4,900,000
USD
2027-01-01 2027-01-31 Original Indicative 3,400,000
USD
2027-01-01 2027-01-31 Revised Indicative 4,900,000
USD
2027-02-01 2027-02-28 Original Indicative 0
USD
2027-02-01 2027-02-28 Revised Indicative 4,900,000
USD
2027-03-01 2027-03-31 Original Indicative 0
USD
2027-03-01 2027-03-31 Revised Indicative 4,900,000
USD
2027-04-01 2027-04-30 Original Indicative 0
USD
2027-04-01 2027-04-30 Revised Indicative 4,900,000
USD
2027-05-01 2027-05-31 Original Indicative 0
USD
2027-05-01 2027-05-31 Revised Indicative 0
USD
2027-06-01 2027-06-30 Original Indicative 0
USD
2027-06-01 2027-06-30 Revised Indicative 0
USD
Budget
Transactions ( 17 )
Outgoing Commitment ( 1 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2020-06-30
Total Commitment in June Month of 2020
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
200,000,000
USD
Outgoing Commitment
Disbursement ( 7 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2022-05-31
Total Disbursement in May Month of 2022
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
1,000,000
USD
2023-09-30
Total Disbursement in September Month of 2023
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
2,000,000
USD
2023-11-30
Total Disbursement in November Month of 2023
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
1,000,000
USD
2024-02-29
Total Disbursement in February Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
2,504,128
USD
2024-03-31
Total Disbursement in March Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
14,000,000
USD
2024-06-30
Total Disbursement in June Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
5,010,686
USD
2024-12-31
Total Disbursement in December Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
1,752,577
USD
Disbursement
Interest Payment ( 9 )
DATE DESCRIPTION PROVIDER RECEIVER VALUE
2021-03-31
Total Interest Repayment in March Month of 2021
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-500,000
USD
2021-06-30
Total Interest Repayment in June Month of 2021
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-346,194
USD
2021-12-31
Total Interest Repayment in December Month of 2021
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-250,685
USD
2022-06-30
Total Interest Repayment in June Month of 2022
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-249,281
USD
2022-12-31
Total Interest Repayment in December Month of 2022
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-270,289
USD
2023-06-30
Total Interest Repayment in June Month of 2023
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-279,718
USD
2023-12-31
Total Interest Repayment in December Month of 2023
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-318,009
USD
2024-06-30
Total Interest Repayment in June Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-660,539
USD
2024-12-31
Total Interest Repayment in December Month of 2024
FLOW OOF Withdrawn 20
FINANCE Aid loan excluding debt reorganisation Withdrawn 410
International Bank for Reconstruction and Development
REF 44001
-1,105,762
USD
Interest Payment
result( 15 )
output( 11 )
outcome( 4 )
GLOSSARY
OutputResults of the activity that came about as a direct effect of your work and specific, what is done, and what communities are reached. For example, X number of individuals.
OutcomeResults of the activity that produce an effect on the overall communities or issues you serve. For example lower rate of infection after a vaccination programme.
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #3-1 Increase in area of green open space
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
281,000.00 0.00
0%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #2-1 Floor area of buildings receiving EDGE certificate
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
362,000.00 0.00
0%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #3-3 Increase in area of storm-water management facilities (i.e., green rooftop, permeable pavement and retention pond)
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
70,000.00 0.00
0%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #2-2 Percentage of project-financed public buildings with dedicated nursing rooms meeting national standard
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2020
0.00
80.00 0.00
0%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #4-1 Number of citizen engagement events organized
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
10.00 23
100%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #4-3 Number of technical assistance (TA) activities completed
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
4.00 3
75%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #1-2 Number of industrial parks that develop comprehensive action plans to adopt the new EIP framework
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
4.00 4.00
100%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #1-1 Number of capacity building events for the industrial parks to contribute to and deploy the new provincial EIP framework
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
10.00 6
60%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #4-2 Number of people trained to help the zone narrow its gaps against the international EIP framework
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
500.00 75
15%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #2-3 Number of firms receiving clean production certificate
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
40.00
60.00 58
90%
2020-06-30 : 2026-12-31
Output
indicator( 1 )
Intermediate Results Indicator
INDICATOR
IRI #3-2 Water quality of the two lakes
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2020
Class IV
Class III Class III
N/A
2020-06-30 : 2026-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
PDO #1 Share of industrial parks in Jiangxi regularly reporting data under the new provincial EIP performance monitoring system
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2020
0.00
75.00 100
100%
2020-06-30 : 2026-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
PDO #3 Amount of attracted investment meeting the green industries screening criteria developed under this project
FACET BASELINE TARGET ACTUAL % PERIOD
Unit Unit
No dimension has been provided
No location has been provided
2020
0.00
100,000,000.00 276,528,571.00
100%
2020-06-30 : 2026-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
PDO #2 Beneficiaries' aggregated satisfaction rate of the FNIZ
FACET BASELINE TARGET ACTUAL % PERIOD
Percentage Percentage
No dimension has been provided
No location has been provided
2020
0.00
70.00 95.9
100%
2020-06-30 : 2026-12-31
Outcome
indicator( 1 )
Project Development Objectives
INDICATOR
#PDO 4 Companies in the FNIZ become eligible for greening financing
FACET BASELINE TARGET ACTUAL % PERIOD
Qualitative Qualitative
No dimension has been provided
No location has been provided
2020
No
Yes Yes
N/A
2020-06-30 : 2026-12-31
General Enquiries
The World Bank
Minghe Tao
+1-202-473-1000
The World Bank, 1818 H Street, NW, Washington, DC 20433 USA
conditions( 8 )
NARRATIVE TYPE DESCRIPTION
Annual Work Plans (Section I.B.1 of the Schedule to the Project Agreement)The Project Implementing Entity shall, and shall causeFuzhou to: (a) prepare and furnish to the Bank by December 31 in each year, beginning in 2020, a draft Annual Work Plan for reviewand comment, summarizing the implementation progress of the Project for the said year and the Project activities to be undertakenin the following calendar year, including the proposed annual budget for the Project; (b) taking into account the Bank's comments,finalize and furnish to the Bank no later than January 31 in each year, beginning in 2021, the Annual Work Plan, satisfactory tothe Bank; and (c) thereafter ensure the implementation of the Project during the following calendar year in accordance with theAnnual Work Plan agreed with the Bank and in a manner satisfactory to the Bank. The Project Implementing Entity shall, and shallcause Fuzhou to, not amend, suspend, abrogate, or waive said Annual Work Plans or any provision thereof without the prior writtenagreement of the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Dam Safety (Section I.C.8 of the Schedule to the Project Agreement)The Project Implementing Entity shall, and shall cause Fuzhouto: (a) maintain throughout Project implementation, one dam safety expert for the Project having experience and qualifications inthe relevant technical fields, acceptable to the Bank, and under terms of reference, including a time-table and adequate budget forits activities, acceptable to the Bank, to, inter alia: (i) inspect and evaluate the status of the Project Reservoirs, theirappurtenances, and its performance history; (ii) review and evaluate operation and maintenance procedures of the Projectreservoirs; (iii) provide a written report to the Project Implementing Entity, and the Bank of findings and recommendations for anyremedial work or safety measures necessary to upgrade the Project Reservoirs to an acceptable standard of safety; and (iv) monitorthe implementation of any remedial work or safety measures; (b) provide all support and cooperation to the dam safety expertreferred to in subparagraph 8 (a) above, necessary to carry out the functions set forth in said expert's terms of reference; and(c) furnish to the Bank by March 31 of each calendar year, beginning in 2021, the report referred in sub-paragraph 8 (a) above,including an action plan to address the findings and recommendations thereof.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Financing Arrangements (Section I.D of the Schedule to the Project Agreement)The Project Implementing Entity shall make availablea part of the proceeds of the Loan to Fuzhou, under terms and conditions satisfactory to the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Implementation Agreement (Section I.A.2 of the Schedule to the Project Agreement)The Project Implementing Entity, through Fuzhou,shall, by no later than November 30, 2020, enter into an agreement (the “Implementation Agreement”) with the FNIZ Development &Investment Group, under terms and conditions acceptable to the Bank, which shall include those set forth in the Annex to thisSchedule.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Institutional Arrangements (Section I.A.1 of the Schedule to the Project Agreement)The Project Implementing Entity shall maintain,and cause to be maintained, the following entities with composition, powers, functions, staffing, facilities and other resourcessatisfactory to the Bank: (a) At the provincial level: (i) the Provincial Project Leading Group responsible for providing overallpolicy, financial, and institutional guidance on Project implementation and facilitating coordination among different implementingagencies within its jurisdiction; and (ii) the Provincial Project Management Office responsible for implementation, coordination,reporting, management, and monitoring and evaluation of the activities under Part 1 of the Project, including the preparation ofthe Project annual work plans and semi-annual progress and financial reports for submission to the Borrower and the Bank.(b) Atthe FNIZ level: (i) the Fuzhou Project Leading Group, responsible for providing overall policy, financial and institutionalguidance on Project implementation and facilitating coordination among different implementing agencies within its jurisdiction; and(ii) the Fuzhou Project Management Office, responsible for implementation, coordination, reporting, management, and monitoring andevaluation of the activities under Parts 2, 3 and 4 of the Project at the municipal level, including coordinating day-to-dayactivities with the Provincial Project Management Office and other agencies, monitoring Project implementation within itsjurisdiction and preparing Project annual work plans and semi-annual progress and financial reports for submission to the Borrowerand the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Mid-term review (Section II.2 of the Schedule to the Project Agreement)The Project Implementing Entity shall prepare, under termsof reference satisfactory to the Bank, and furnish to the Bank no later than June 30, 2024, a consolidated mid-term review reportfor the Project, summarizing the results of the monitoring and evaluation activities carried out from the inception of the Project,and setting out the measures recommended to ensure the efficient completion of the Project and to further the objectives thereof.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Project Operations Manual (Section I.B.2 of the Schedule to the Project Agreement)Throughout the implementation of the Project,the Project Implementing Entity, shall and shall cause Fuzhou to apply, the Project Operations Manual in a timely and efficientmanner satisfactory to the Bank.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient
Safeguards (Section I.C.1-7 of the Schedule to the Project Agreement)The Project Implementing Entity shall, and shall cause Fuzhouto:(1) (a) take all necessary actions to minimize to the extent possible any involuntary loss by persons of shelter, productiveassets or access to productive assets or income or means of livelihood, temporarily or permanently, and the displacement of saidpeople in the carrying out of the Project or any part thereof; (b) where the acquisition of land or assets or the displacement ofpeople is unavoidable, before initiating the implementation of any works which would result in such acquisition or displacement,make available to such people compensation and, as applicable, relocate and rehabilitate the Displaced Persons in accordance withthe RAP and in a manner satisfactory to the Bank;(2) implement, the Safeguards Instruments in a manner and substance satisfactoryto the Bank;(3) ensure that each contract for works financed under the Project includes the obligations of the work contractorsand any sub-contractor to comply with the relevant provisions of the Safeguards Instruments, as the case may be;(4) all studiesand technical assistance to be supported under the Project are carried out under terms of reference satisfactory to the Bank, andthat such terms of reference are consistent with, and pay due attention to, the Bank's Safeguards Policies;(5) maintain, and shallcause Fuzhou to maintain, policies and procedures adequate to enable them to monitor and evaluate, in accordance with guidelinesacceptable to the Bank, the implementation of the Safeguards Instruments;(6) take, all measures necessary on their part toregularly collect, compile, and submit to the Bank, as part of the Project Reports, and promptly in a separate report whenever thecircumstances warrant, information on the status of compliance with the Safeguards Instruments.
Performance The condition attached requires certain outputs or outcomes to be achieved by the recipient